Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹72 L
EMD Value
₹1.4 L
Closing Date
26 Oct 2026, 11:00 am6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
DVP
HLL BIOTECH LIMITED Integrated Vaccine Complex Survey No 192 and 195 Meleripakkam Village Chengalpattu PIN 603003
OPERATION and MAINTENANCE OF CLEAN UTILITY WATER SYSTEMS AT BCG, VVF AND QC/QA BLOCKS OF IVC FACILITY, HLL BIOTECH LIMITED, CHENGALPATTU
2026_HBL_294227_1
HBL/WTS/OandM/IVC/CPT/26-27 Dt. 12.10.2026
Open Tender
Miscellaneous Works
Lump-sum
365 days
Chengalpattu
Please refer Tender documents.
18 documents required · 18 mandatory
₹2,950
Yes
HLL Biotech Limited
₹1.4 L
Yes
Online
12 Oct 2026
12 Oct 2026
27 Oct 2026
12 Oct 2026
26 Oct 2026
13 Oct 2026
15 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation & Maintenance for 1 Year | - | - | - | - |
| 2 | Blcok Name : BCG
Complete 24×7 Operation & Maintenance of Clean Utility Water Systems installed in BCG Block, including PWG, PW Distribution, MCDP, MCDP Distribution and PSG, together with the associated Cold WFI distribution loop and connected equipment/instruments. Scope includes three-shift operation with minimum 3 operators and 1 dedicated Supervisor; reliever manpower; start-up/shutdown; Auto/Manual/Sanitization/Circulation/Standby modes; pump and valve operation; UV and heat-exchanger monitoring; storage tank and distribution-loop monitoring; HMI/SCADA operation and alarm handling; process and quality parameter monitoring; RO/EDI monitoring where applicable; POU monitoring; utility consumption recording; chemical preparation and dosing; sanitization; RO membrane CIP; housekeeping; preventive and breakdown maintenance support using HBL-supplied spares; QC sampling support; validation/IQ/OQ/PQ support; audit/inspection support; documentation, logbooks and daily/weekly/monthly reports; GMP, SOP, GEP, PTW, LOTO, MSDS and data-integrity compliance. Supply of all dosing chemicals required to run the system should also be considered as scope of works. Detailed scope, terms and conditions are detailed in the tender and bidder to stick on to the said requirements. | 12 | Month | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
TenderdocumentOandM.pdf
Tender Documents • 1.49 MB
BOQ_342993.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .