Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC GOPAL PRASAD MALLIBANDHA TALCHER DIST ANGUL PIN 759103 ODISHA | TALCHER | ANGUL | ODISHA | 759103 | L1 | Accepted-AOC AWARDED FOR BEING L1 BIIDDER | |
| 2 | L2₹12.1 L+₹6,687.60 (0.56%)Rejected-Finance AT PO BHALUGADIA PO KUMUNDA TALCHER DIST ANGUL PIN 759103 ODISHA | TALCHER | ANGUL | ODISHA | 759103 | L2 | Rejected-Finance REJECTED FOR NOT BEING L1 BIIDER | |
| 3 | L3₹14.4 L+₹2.4 L (20.3%)Rejected-Finance | L3 | Rejected-Finance REJECTED FOR NOT BEING L1 BIIDER | |
| 4 | L4₹15.5 L+₹3.5 L (29.3%)Rejected-Finance AT BADAJORADA TALCHER ANGUL ODISHA 759103 | ANUGUL | ODISHA | 759103 | L4 | Rejected-Finance REJECTED FOR NOT BEING L1 BIIDER | |
| 5 | L5₹23.8 L+₹11.8 L (98.2%)Rejected-Finance AT PIDHAKHAMAN PO RAIJHARAN DIST ANGUL ODISHA PIN 759130 | ANGUL | ANGUL | ODISHA | 759130 | L5 | Rejected-Finance REJECTED FOR NOT BEING L1 BIIDER |
Tender Value
₹26.2 L
EMD Value
₹32,900
Closing Date
20 Mar 2023, 5:00 pmClosed
STAFF OFFICER (CIVIL), HINGULA AREA
SO (CIVIL), OFFICE OF THE GM, HINGULA AREA, P.O._N.S.NAGAR, TALCHER, ANGUL_759148, ODISHA, INDIA
Cleaning of existing high drains making kuchha drain at OSL patch, weigh bridge No.04 to Karadei sump, heightening of earth embankment of existing pond near wheel washing point and periphery at Mines at Hingula OCP under Hingula Area.
2023_MCL_272184_1
MCL/GM(HA)/CIVIL/e-Tender/ 22-23/118 Dt 21-2-2023
Open Tender
Civil Works - Others
Item Rate
120 days
HINGULA OCP
AS PER NIT
3 documents required · 3 mandatory
₹32,900
9 May 2023
9 Mar 2023
22 Mar 2023
9 Mar 2023
20 Mar 2023
9 Mar 2023
9 Mar 2023 - 13 Mar 2023
Amount
Removal of Unserviceable Soil with Disposal upto 1000 metres Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.
Supply of manpower for day to day cleaning of drains during monsoon period as per the instruction of EIC etc. complete. Scope of work:The agency has to engage 6 nos unskilled labour per day.
Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1,300-2 and as per relevant clauses of section-300
Total impact of GST for the purpose of CTC
Padmanava Pradhan.
ASHUTOSH PRADHAN
SOUMYA RANJAN PRADHAN
ALOK KUMAR SAHOO
ABHAYA KUMAR MOHANTY
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .