Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹6.1 LAdmitted-Finance KABITALAY SREE DURGAPALLY NABAPALLY BARASAT KOLKATA WEST BENGAL 700126 UDYAM WB 14 0002511 | 24 PARAGANAS NORTH | WEST BENGAL | 700126 | ₹6.1 L | Admitted-Finance |
| 2 | ₹10.4 LAdmitted-Finance GODAVERI COMPLEX 1ST FLOOR BLOCK NO 104 MAIN ROAD HALDUCHAUR HALDWANI 263139 | NAINITAL | UTTARAKHAND | 263139 | ₹10.4 L | Admitted-Finance |
| 3 | Rejected-Technical BLOCK CP PLOT NO 15 SECTOR V INFINIUM DIGISPACE 4TH FLOOR SECTOR V SALT LAKE CITY NORTH 24 PARGANAS WEST BENGAL 700091 UDYAM WB 10 0003865 19AABCN2405J1ZL B R 32AABCN2405J1ZX B 24AABCN2405J1ZU B 09AABCN2405J1ZM B 27AABCN2405J1ZO B MSME STATUS AS VERIFIED | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | - | Rejected-Technical Uploaded Affidavit for No Banning/Black Listing/Delisting but not signed by the bidder and also firm name misspelled. Hence cannot be consider as per NIT. |
| 4 | Rejected-Technical | - | Rejected-Technical Uploaded Affidavit for No Banning/Black Listing/Delisting but not signed by the bidder and also firm name misspelled. Hence cannot be consider as per NIT. |
| Sl No | Description | Qty | Unit | M/S. ARUDRA ENGINEERS PVT LTD | EKA PRESS TECHNO SERVICES PVT. LTD. |
|---|---|---|---|---|---|
| 1.00 | Work Contract for " Testing of Safety Valve installed at Boiler Side on Water Separator Equalizing Line, Main Steam Line, Cold Reheat Line (CRH), Hot Reheat Line (HRH) and Soot Blower Station by online Valtest Method for Boiler Unit 3 & 4 at (2X660 MW) of SSTPP, Dongalia. | 26 | Nos. | 3,25,000 ₹3.8 L | 1,82,000 ₹2.1 L |
| 2.00 | Work Contract for " Testing of Safety Valve installed at Boiler and Turbine side online Valtest Method for Boiler unit l & 2 at 2X600 MW, SSTPP. MPPGCL, Dongalia. | 40 | Nos. | 5,00,000 ₹5.9 L | 2,80,000 ₹3.3 L |
| 3.00 | Incidental Charges/ Mobilization Charges | 4 | Visit | 60,000 ₹70,800 | 62,000 ₹62,000 |
Updated dates
Tender Value
₹7.3 L
EMD Value
₹14,600
Closing Date
19 Jan 2026, 3:30 pmClosed
CE(Gen), SSTPP Dongalia
Admin Building SSTPP, Dongalia
Testing of Safety Valve installed at Boiler side on Boiler drum, water separator equalizing line, Main Steam line, Cold reheat Line (CRH), Hot Reheat Line(HRH) and Soot Blower Station by Online Valtest Method for Boiler unit 1 and 2 ph-1 and 3 and 4
2025_MPPGC_459343_1
WT-2848/MM-II
Open Tender
Miscellaneous Works
365 days
Addl. C.E.(P and W)SSTPP, Dongalia
Please refer Tender documents.
16 documents required · 16 mandatory
₹500
Yes
₹14,600
Yes
21 May 2026
11 Dec 2025
20 Jan 2026
11 Dec 2025
19 Jan 2026
11 Dec 2025
Select, Excess (+), Less (-)
Tender Inviting Authority: O/o Addl. C.E. (P&W),SSTPP,MPPGCL,DONGALIA
Name of Work: Testing of Safety Valve installed at Boiler side on Boiler drum, water separator equalizing line, Main Steam line, Cold reheat Line (CRH), Hot Reheat Line (HRH) & Soot Blower Station by Online Valtest Method for Boiler unit 1 & 2 at 2X600 MW and Unit 3 & 4 at 2X660 MW, SSTPP, MPPGCL, Dongalia.
Contract No: T- 2025_MPPGC_459343_1
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description work No. Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder in Rs. P IGST Rate on col (6) in % IGST Amount on col (6) in Rs. CGST Rate on col (6) in % CGST Amount on col (6) in Rs. SGST Rate on col (6) in % SGST Amount on col (6) in Rs. Amount towards Any Other Duties/ Levies in Rs. HSN / SAC Code TOTAL AMOUNT excluding taxes in Rs. P TOTAL AMOUNT including taxes Rs. P TOTAL AMOUNT In Words
1 Work Contract for " Testing of Safety Valve installed at Boiler Side on Water Separator Equalizing Line, Main Steam Line, Cold Reheat Line (CRH), Hot Reheat Line (HRH) and Soot Blower Station by online Valtest Method for Boiler Unit 3 & 4 at (2X660 MW) of SSTPP, Dongalia. work1 26 Nos. 0 Excess(+) Full Conversion INR
2 Work Contract for " Testing of Safety Valve installed at Boiler and Turbine side online Valtest Method for Boiler unit l & 2 at 2X600 MW, SSTPP. MPPGCL, Dongalia. work2 40 Nos. 0 Excess(+) Full Conversion INR
3 Incidental Charges/ Mobilization Charges work3 4 Visit 0 Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select %
Quoted Rate in Words
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.32 MB
Tendernotice_2.pdf
PDF • 0.29 MB
Annexureschec.pdf
Additional Documents • 1.63 MB
Credentials.xls
Additional Documents • 0.09 MB
TechnicalBiD.xls
Additional Documents • 0.31 MB
NEWSBDworkservices.pdf
Tender Documents • 30.17 MB
NIT2848.pdf
Tender Documents • 0.13 MB
BOQ_549807.xls
BOQ • 0.35 MB
NITdetails2848.pdf
Tender Documents • 0.30 MB
Tenderschede2848.pdf
Tender Documents • 0.28 MB
ModelCertificate.pdf
Additional Documents • 0.17 MB
Download all tender documents and submit your bid