Tender Value
₹21.7 L
EMD Value
₹43,400
Closing Date
24 Sept 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TENDER
40 conditions · 5 needing a document upload
Tender Form (First Sheet) as per 'Annexure-I'
For Sole Proprietorship firm a)Affidavit as per 'Proforma I'. b)Special power of Attorney as per proforma given in 'Proforma II' to be submitted by sole proprietor firm duly notarized.(Not required if tender documents are submitted by proprietor himself)
For Partnership firm a)Self/Notary attested copies of Partnership deed. b)Special Power of Attorney as per proforma given in 'Proforma-III' to be submitted by Partnership firm. (Not required if one or more partners are authorized in Parternership deed to sign on behalf of the firm.)
For Limited Company a) Copy of Memorandum & Articles of Association of Company. b)Self /Notary attested copy of resolution passed by Board of Directors authorizing its Director/Employee to deal with tender on behalf of company. c) Attested copy of Notarized Special Power of Attorney including ratification clause duly signed by person authorized by the company.(D) A copy of Certificate of Incorporation
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The total cost is including GST. Hence tenderer are advised to quote the tender inclusive of GST
All the dismantled material should be handed over to E.I.C. at site with proper challan.
All materials which will be utilized for this work shall confirm to relevant IS specifications.
All the materials should be got inspected and approved by the competent representative of Sr.DEE/G/RNY & Engineer in Charge should be contacted before execution of work.
The contractor(s) have to supply all petty stores, which may be required for successful commissioning of the equipments, but not mentioned in the schedule of works. The rate quoted against each item shall be inclusive of those petty stores.
Successful Tenderer shall produce & hand over test and Guarantee certificate issued by manufacturer of all the equipment/ Component at the time of supply to Railways, failing which bill of the work will not be passed.
Joint Test reports with EIC for earth resistance to be submitted with submission of bill.
The Contractor shall execute the work to entire satisfaction of the site Engineer, SR DEE/RNY or his representative.
Switchgear like MCCB,MCB, RCCB , etc. should be make of BCH/C&S/ABB/Geco/Legrand/Lauritz Knudsen/Indo Asean.
The LED fittings for Street light should be of Phillips/Bajaj/kolors/C&S.
GI Tubular/Octagonal pole should be of Make:- J K Industries/Nezone/Bengal pole corporation/Ambica Tube Industries(ATI)/Utkarsh.
GI pipe should be of Make:-Jindal/Bansal/Tata/Nezone
HDPE pipe should be of Make:-AJA Plus/Swastik/Quotone/North East Communication.
Flexible Wire, PVC Cable Make should be of Crompton/Polycab/Richa/Kolors /Anchor/ BCH/KEI/Finolex.
XLPE Cable should be of Make:-Havell's/ Richa/ Polycab/ Kolors/ Anchor/BCH/KEI Finolex.
Colour coding should be used in all wiring. For Positive- Red, Negative - Black & Earth - green.
The drawing of panel board should be approved by the competent authority before fabrication and commissioning.
Payment Clause:Payment 70/80% of the payment shall be made to the contractor/firm against the supply of material of the work.
Tenderer should submit the documents as per the Annexure-'A' attached at the time of submission of bill.
Successful contractor must follow guidelines as per extant rules of IR Shramik Kalyan Portal.
Penalty :- In case of any damage causes to railway materials at the time execution of work, penalty will be imposed as per railway norms otherwise the same should be rectified as per original.
No work can be carried out without availability of site supervisor. if site supervisor is not available , then work will be stopped and penalty will be imposed as per GCC.
Insurance policy has to be taken against contract by contractor, indemnifying the Railways of any financial implication arising due to payout of claims on account of damages, accidents, untoward incidents etc. during the execution of work.
All staff at site should wear all safety gears and follow all safety precaution to avoid any untoward incident. If staff is found without proper safety gear, then work will be stopped and penalty of Rs 50,000 per day per site will be imposed.
If staff as per message of SSE/Office is not provided by Agency, then penalty of Rs 50,000 per day per site will be imposed for delay in work on Agency.
For any damage to railway, recovery will be made as per cost of damage to railway.
Agency should give their email id and mobile no. on which instruction for daily work will be issued for different site. 12 hours will be given after mail/message for arranging labour and site supervisor.
At DUBIA - Electrical works in connection with Raising & extension of rail level platform no.2 to accommodate full length high level platform.
RNY-EL-T-11-2026-27~NFR
RNY-EL-T-11-2026-27
Open
Works - General
180 Days
Kamrup, Assam
₹0
₹43,400
24 Sept 2026
2 Sept 2026
10 Sept 2026
25 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 21,69,312.75 | ||
| — | 35.00 | — | — | ||
| Supply, carrying,loading & unloading of 5 mtr long with suitable size single arm bracket G I octagonal pole including base plate 200x12mm,PCD 200mm,junction box and foundation bolt 4x16 Nos (Length 600mm) etc. and erection with execution of CC foundation work of size 45cmx45cm in ratio 1:2:4 by cement, sand and chips of size 19mm and down upto full depth & 1ft above the GL as per direction of EIC at site & 6A SP MCB. | — | — | — | 5,17,325.55 | |
| — | 35.00 | — | — | ||
| Supply,installation,testing & commissioning of IP 65 45-watt street light fittings complete including all accessories as per direction of EIC at site. Lumens output should be of 100 Lumens/watt, LED should be as per LM-80/IS: 16105. LED driver's efficiency should be minimum 90%,Power factor of complete fitting should be greater than 0.90, Input operating voltage:140V to 277V AC and driver should be as per IEC:62384/IS:16104.The LED fittings should be warranted for 5years. | — | — | — | 1,77,590 | |
| — | 20.00 | — | — | ||
| Supply,installation,testing & handing over of IP 65 45-watt street light fittings complete including all accessories as per direction of EIC at site. Lumens output should be of 100 Lumens/watt, LED should be as per LM-80/IS: 16105.LED driver's efficiency should be minimum 90%,Power factor of complete fitting should be greater than 0.90, Input operating voltage:140V to 277V A and driver should be as per IEC:62384/IS:16104.The LED fittings should be warranted for 5 years. | — | — | — | 91,332 | |
| — | 1200.00 | — | — | ||
| Supply, testing and connection of 1100 volt grade, 16 sq mm 4 core XLPE insulated and PVC sheathed aluminium multistrand armoured cable as per IS 7098(Part 1) 1988 with up to date amendments including necessary crimping lugs as per site requirement. Loading, unloading & carrying of Loading , unloading & carrying of cable to actual work site by contractor own arrangement as per instruction of Engineer in charge at site. | — | — | — | 4,23,384 | |
| — | 200.00 | — | — | ||
| Supply, testing and connection of 1100 volt grade, 50 sq mm 4 core XLPE insulated and PVC sheathed aluminium multistrand armoured cable as per IS 7098(Part 1) 1988 with up to date amendments including necessary crimping lugs as per site requirement. Loading, unloading & carrying of Loading , unloading & carrying of cable to actual work site by contractor own arrangement as per instruction of Engineer in charge at site. | — | — | — | 1,51,918 | |
| — | 100.00 | — | — | ||
| Horizontal machine borring under track crossing at a depth of 2.0 mtr below GL including pipe observing all necessary safety for human life and others movement as per direction of engineer at site. | — | — | — | 5,24,400 | |
| — | 1500.00 | — | — | ||
| Laying of above LT XLPE insulated armoured aluminium cables as per instruction of site engineer. | — | — | — | 19,365 | |
| — | 700.00 | — | — | ||
| Excavation of cable trench 0.75 mtrs. below the GL with laying of armored cable and refilling the same by supply of 70mm sand and soil after digging the earth. The laying of armoured cable should be done as per direction of Engineer at site. | — | — | — | 83,300 | |
| — | 700.00 | — | — | ||
| Supply and laying of HDPE pipe 50 mm dia towithstand 8.0 Kg/sq mm pressure confirmingto IS:4984/2016 (complete with necessary jointing of pipes as per standard procedure) asper direction of EIC at site. | — | — | — | 1,37,088 | |
| — | 500.00 | — | — | ||
| Supply & drawing of 1.5 sq mm PVC insulated & PVC sheathed, single core with copper conductor 1100 volts grade conforming to IS:694/1990 with latest amendments through the octagonal pole to the fittings as per direction of EIC at site. . | — | — | — | 9,930 | |
| — | 10.00 | — | — | ||
| Supply and erection of earthing by made of B class GI pipe of 3000 mm length, 50 mm diameter & 3.6 mm thickness.The GI Strip ( should be welded with the earth pipe. The pipe is provided with a tapered casing at the lower end in order to facilitate the driving. A funnel with perforated plate to be provided at the top of the pipe for pouring water during dry season to have an effective earth value.The connecting conductor from earth electrode tothe distribution panel board should not be thinner than 8 SWG GI wire to carry the fault current. The earth fill shall be of homogeneous layer of common earth soil. Where soil restivity is high, earth restivity enhancing material may be used, Bentonite or similar earth enhancing material may be used in rocky soil. Earth box to be precasted RCC andThe values of earth resistance measured should be painted on the Earth pit cover/lid along with the date of measurement. As per Drg. No. DRG NO:PCEE/ELG/DRG/2024/1 dated 30.09.2024 & as perTechnical circular no. EL/PS/2024/1 (EARTHING SYSTEM). | — | — | — | 13,824.2 | |
| — | 2.00 | — | — | ||
| Design, fabrication, supply, installation, testing and commissioning of outdoor type (KIOSK type) hinged, feeder pillar box comprising of following items and made of MS angle, channel by MS sheet of not less than 18 SWG duly welded and painted by 2 coats of primer, two coats of finishing paint (spray paint) Doco/Nerolac brand of approved colour both in interior and exterior as per direction of EIC at site - i) 100A,4P, 18KA, Ics = 100% Icu, conforms to IEC 60947-2 MCCB - 1 nos, ii) 63A, MCB TPN - 1 nos, iii) 40A, MCB DP - 1 nos & iv) 200A 4P copper bus bar - 1 set. | — | — | — | 19,856 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
JPO8.5.24-CablediggingworksNFR.pdf
ATTACHMENT
ACS-8_2.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
GCCUpdateduptoACS-11_1.pdf
ATTACHMENT
TechCircularwithDrgforEarthingandCableLayingUG.pdf Drawing for pipe earthing and cable lay
ATTACHMENT
ACS-09.pdf
ATTACHMENT
ACS-10.pdf
ATTACHMENT
TD-112026-27.pdf
ATTACHMENT
Annexure.pdf
ATTACHMENT
TechCircularwithDrgforEarthingandCableLayingUG.pdf
ATTACHMENT
Annexure.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .