Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical | Rejected-Technical conditions not satisfied |
| 3 | Rejected-Technical | Rejected-Technical Conditions not satisfied |
Tender Value
Refer Docs
EMD Value
₹35,000
Closing Date
1 Feb 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/GCC/Madurai
SE/GCC/MADURAI
EWE SS Concreting transporting Manamadurai 110 KV SS Loc No.4-12
2021_EB_192206_1
SE-GCC-MDU SPEC.NO.059/2020-21
Open Tender
Civil Works
Works
90 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
Yes
THE SUPERINTENDING ENGINEER/GCC/MADURAI
₹35,000
Yes
25 Mar 2021
22 Jan 2021
2 Feb 2021
22 Jan 2021
1 Feb 2021
22 Jan 2021
120 days
Amount
Clearing Juliflora jungle without uprooting for including all cost of labour, lead, lift etc., complete.
Uprooting and removing large palmyrah / Coconut stumps
Check survey and pit marking location including transport of men and materials etc. complete
Earthwork excavation in hard stiff clay black cotton hard red earth shale's murram gravel stony earth and earth mixed with small size boulders and hard gravelly soil including all cost of lead lift etc complete.
Earth work excavation in soft disintegrated rock not requiring blasting with initial lead of 10 m and lift of 2 m
Earth work excavation in medium rock and dense medium rock requiring blasting with initial lead of 10 m and lift of 2 m
Earth work excavation in hard rock measured in solid including blasting & Stacking
Labour charges for Transporting of template and stubs to site and assembling the template at site and shifting the template from loc to loc KCR wet
Labour charges for Transporting of template and stubs to site and assembling the template at site and shifting the template from loc to loc HCR wet
Labour charges for Transporting of template and stubs to site and assembling the template at site and shifting the template from loc to loc GCR wet
Labour charges for Transporting of template and stubs to site and assembling the template at site and shifting the template from loc to loc QD+9 wet
PCC 1:4:8 using 40mm metal (machine crushed) for concrete including cost of all materials, without form work, lead, lift, labour etc complete.
PCC 1:2:4 using 20mm metal (machine crushed) for foundation footings including cost of all materials lead lift labour with formwork etc complete.
RCC 1:1.5:3 using 20mm metal (machine crushed) for LSR foundation footings including cost of all materials lead lift labour with formwork etc complete.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting bending tying and fixing in position as per specification including cost of all materials lead lift cost of binding wire etc complete
Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earth strip with the leg of the stub including cost of all materials lead, lift etc.
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. KCR wet
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. GCR wet
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. QD+9 wet
Transporting and Sorting out of tower parts in stores, loading into lorry, transporting the same to site, unloading at site, erection of towers, tightening punching of bolts and nuts including all lead, lift, labour etc complete
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanized paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Removal of surplus earth in a low lying area to a average distance of 200m by head load.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .