Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-AOC | ₹12.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.0 LRejected-AOC | ₹13.0 L | L2 | Rejected-AOC L2 |
| 3 | L3₹13.0 LRejected-AOC 0 AHAMADPUR AHAMADPUR AHAMADPUR JAUNPUR UTTAR PRADESH 222180 | JAUNPUR | UTTAR PRADESH | 222180 | ₹13.0 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | M/S RAM ASAREY PATEL L2 | M/S AWADH CONSTRUCTION L1 | M/S SAI CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00 | E/W in excavation in foundation including back filling of excavated earth with 30m lead & 1.5 m lift etc. | 189 | m3 | 40 ₹7,560 Lowest | 74 ₹13,986 | 60 ₹11,340 |
| 2.00 | Supply and laying local sand below in foundation C.C including cost of all materials labour T&p etc. | 54 | m3 | 800 ₹43,200 | 1,480 ₹79,920 | 500 ₹27,000 Lowest |
| 3.00 | Laying C.C. 1:3:6 in foundation & floor including cost of all materials labours T&P etc. | 81 | m3 | 3,600 ₹2,91,600 Lowest | 4,218 ₹3,41,658 | 3,900 ₹3,15,900 |
| 4.00 | Brick masonary with 1:4 C.M. including cost of all materials labours T&P etc. | 153 | m3 | 4,950 ₹7,57,350 | 4,181 ₹6,39,693 Lowest | 5,000 ₹7,65,000 |
| 5.00 | C.C 1:2:4 on bed and top of wall including cost of all materials labours T&P etc. | 28 | m3 | 5,800 ₹1,62,400 | 5,900 ₹1,65,200 | 5,050 ₹1,41,400 Lowest |
| 6.00 | Deep struck pointing 1:2 cm on brick masonary including cost of all materials labours T&P etc. | 330 | m2 | 110 ₹36,300 Lowest | 145 ₹47,850 | 123 ₹40,590 |
Tender Value
₹17.2 L
EMD Value
₹34,482
Closing Date
23 Jul 2026, 1:00 pmClosed
EE MLCD Prayagraj
Office EE MLCD Prayagraj
Vertical brick lining of Dharwara pump canal from 0.550 km to 0.750 km including cost of all materials labour T and P etc. as per drawing and direction of Engineer in charge for proper completion of work with maintaining proper water level.
2026_UPIDM_1168815_2
05/EE/MLCDP/2026-27
Open Tender
Civil Works
Piece-work
90 days
Dharwara Pump Canal
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹34,482
24 Aug 2026
16 Jul 2026
23 Jul 2026
17 Jul 2026
23 Jul 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in excavation in foundation including back filling of excavated earth with 30m lead & 1.5 m lift etc. | 189 | m3 | - | - |
| 2 | Supply and laying local sand below in foundation C.C including cost of all materials labour T&p etc. | 54 | m3 | - | - |
| 3 | Laying C.C. 1:3:6 in foundation & floor including cost of all materials labours T&P etc. | 81 | m3 | - | - |
| 4 | Brick masonary with 1:4 C.M. including cost of all materials labours T&P etc. | 153 | m3 | - | - |
| 5 | C.C 1:2:4 on bed and top of wall including cost of all materials labours T&P etc. | 28 | m3 | - | - |
| 6 | Deep struck pointing 1:2 cm on brick masonary including cost of all materials labours T&P etc. | 330 | m2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_2193046.xls
BOQ • 0.29 MB
Doc.pdf
Tender Documents • 1.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].