Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹2.8 L
Closing Date
25 Jan 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Manager
Power Grid Corporation of India Limited Northern Region I Regional Headquarter SCO Bay No 5 to 10 Sector 16A Faridabad 121002
Construction of balance work of Transit camp at POWERGRID Jaipur south substation
5002003104
Open
Civil Works – General
Works
POWERGRID Jaipur south substation
₹5,000
₹2.8 L
8 Jan 2024
8 Jan 2024
30 Jan 2024
8 Jan 2024
25 Jan 2024
8 Jan 2024
Package Name Construction of balance work of Transit camp at POWERGRID Jaipur south substation
Package Code Substation Packages SS63 -Part A1 & B1
Specification No. Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566
1 Fill up only green shaded cells in Sch-1, Sch-2, Sch-3, Sch-4, Sch-7 and Bid Form 2nd Envelope.
2 All the cells in Sch-5 & Sch-6 are auto filled, therefore no cell is required to be filled up there.
3 Instructions / error messages, if any, will be displayed automatically after selecting the cell.
4 After filling up all the schedues, save the file, take print out of all the schedules and Bid form and sign & stamp and submit them as hard copy of the 2nd envelope (Price part) of the bid. Also ensure to submit the soft copy of the the same file on CD/ DVD.
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
I While filling up the worksheets following may please be observed :
(i) Fill up only green shaded cells.
(ii) Certain data type entries have been restricted, such as Numeric values or limits of numeric values.
(iii) Select only the options provided in pull down menus.
(iv) Do not link any cell of this work book with any other work book.
(v) Do not use copy & paste or cut & paste options for filling up the data.
(vi) Do not reformat any of the cell of the work book.
II This Workbook consists of following worksheets :
Opening page of the workbook.
Names of Bidder :
● Select Sole Bidder or JV (Joint Venture) from the pull down menu. Do not leave this cell blank.
● Select nos. of the JV Partners other than the Lead Partner from drop down menu.
● In case of JV partners more than 2, enter details of 3rd & more partners along with details of 2nd partner.
● Fill up names and address of the Sole Bidder and /or Joint Venture.
● Fill up date in dd-mmm-yyyy format from drop down menu.
● Click for Sch-1 given at the right top of the worksheet to go to Sch-1.
Sch-1 (Ex-works Prices) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Corresponding cell for mode of transaction shall be come enable only after filling up the unit rate, therefore first fill up the unit rate and then mode of transaction for the corresponding item.
● Select either Direct or Bought-out from the drop down menu. Do not leave the cell blank the same shall be deemed to be Bought-out if the cell is left blank.
● Total amount shall get calculated automatically.
● Type Test charges shall appear automatically after filling up Sch-7 appropriately.
Sch-2 (Freight & Insurance Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-3 (Erection Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-4 (Training Charges) :
● Not applicable, hence no cell is required to be filled up.
Sch-4b (Maintenance Charges during and after Defect Liability Period) :
● Not applicable, hence no cell is required to be filled up.
Sch-5 (Summary of Taxes and Duties applicable on the Goods) :
● No cell is required to be filled in by the bidder in this worksheet.
● Summary of all the Schedules without considering discount (mentioned in the work sheet discount) shall be displayed automatically.
● No cell is required to be filled in by the bidder in this worksheet.
Sch-7 (Type Test Charges) :
● Fill up the rates & location where type tests are proposed.
● Total of this Sch-7 shall automatically appear in Sch-1.
Bid from 2nd Envelope :
● Fill up ref. no. as bidder's ref no. of this letter.
● This letter shall consider the net price as per Sch-6 (After Discount).
● Fill up names & Designation of the representatives of other JV partner(s) if the bidder is JV (Joint Venture) .
● Fill up additional information as required.
Happy Bidding !
Construction of balance work of Transit camp at POWERGRID Jaipur south substation
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566 Sole Bidder 1 Sole Bidder 1
Joint Venture 2 or More JV (Joint Venture) 2 or More
Enter following details of the bidder
Specify type of Bidder [Select from drop down menu] 0 2 0 0 2 0
Name of Lead Partner …….. …….. …….. …….. …….. ……..
Address of Sole Bidder …….. …….. …….. …….. …….. ……..
Name of other Partner - 1
Address of other Partner - 1
Name of other Partner - 2 (more, if any) …….. …….. …….. …….. …….. ……..
Address of other Partner - 2 (more, if any) …….. …….. …….. …….. …….. ……..
email ID of Bid Signatory
Mobile No. of Bid Signatory
Tel No. of Bid Signatory
Fax No. of Bid Signatory
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566 Schedule - 1 Direct Total 0 0 `
BO Total #REF! 0
Construction of balance work of Transit camp at POWERGRID Jaipur south substation
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
PLANT AND EQUIPMENT (INCLUDING MANDATORY SPARES PARTS) TO BE SUPPLIED, INCLUDING TYPE TEST CHARGES FOR TESTS TO BE CONDUCTED Direct
All Prices are in Indian Rupees. Bought-Out
SI. No. PR No PR Line Item No Activity Description Material Code HSN Code Whether HSN in column ‘ 6 ’ is confirmed. If not indicate applicable the HSN code * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Item Description Unit Qty. Unit Ex-works price (excluding GST) Total Ex-works price (excluding GST) GST Tax as confirmed by Bidder
1 7000016517 20 GANTRY STRCUTURES 18 M Included 0.00 0 0.00
2 7000016517 30 GANTRY STRCUTURES 18 EA Included 0.00 0 0.00
3 7000016517 40 GANTRY STRCUTURES 18 EA Included 0.00 0 0.00
4 7000016517 50 GANTRY STRCUTURES 18 EA Included 0.00 0 0.00
5 7000016517 70 Tele BoQ at Fatehgarh-3 (Extn) 18 EA Included 0.00 0 0.00
6 7000016517 80 Tele BoQ at Fatehgarh-3 (Extn) 18 M Included 0.00 0 0.00
7 7000016517 90 Tele BoQ at Fatehgarh-3 (Extn) 18 M Included 0.00 0 0.00
8 7000016517 100 Tele BoQ at Fatehgarh-3 (Extn) 18 M Included 0.00 0 0.00
9 7000016517 110 Tele BoQ at Fatehgarh-3 (Extn) NOT APPLICABLE 0.00 0 0.00
10 7000016517 120 Tele BoQ at Fatehgarh-3 (Extn) 18 M Included 0.00 0 0.00
11 7000016517 130 Tele BoQ at Fatehgarh-3 (Extn) 18 M Included 0.00 0 0.00
12 7000016517 140 Tele BoQ at Fatehgarh-3 (Extn) 18 M Included 0.00 0 0.00
13 7000016517 150 Tele BoQ at Fatehgarh-3 (Extn) 18 M Included 0.00 0 0.00
14 7000016517 160 Tele BoQ at Fatehgarh-3 (Extn) 18 M Included 0.00 0 0.00
15 7000016517 170 Tele BoQ at Fatehgarh-3 (Extn) 0.00 0 0.00
16 7000016517 180 Tele BoQ at Fatehgarh-3 (Extn) 18 SET Included 0.00 0 0.00
17 7000016517 200 Spares- Tele BoQ at Fatehgarh-3 0.00 0 0.00
18 7000016517 210 Spares- Tele BoQ at Fatehgarh-3 18 Nos Included 0.00 0 0.00
19 7000016517 220 Spares- Tele BoQ at Fatehgarh-3 18 0.00 0 0.00
20 7000016517 230 Spares- Tele BoQ at Fatehgarh-3 18 SET Included 0.00 0 0.00
21 7000016517 240 Spares- Tele BoQ at Fatehgarh-3 0.00 0 0.00
22 7000016517 250 Spares- Tele BoQ at Fatehgarh-3 18 Nos Included 0.00 0 0.00
23 7000016517 260 Spares- Tele BoQ at Fatehgarh-3 18 No. Included 0.00 0 0.00
24 7000016517 270 Spares- Tele BoQ at Fatehgarh-3 0.00 0 0.00
25 7000016517 280 Spares- Tele BoQ at Fatehgarh-3 18 Nos. Included 0.00 0 0.00
26 7000016517 290 Spares- Tele BoQ at Fatehgarh-3 18 Nos. Included 0.00 0 0.00
27 7000016517 300 Rep ( Fatehgarh-3 - Beawer ) 18 Nos. Included 0.00 0 0.00
28 7000016517 310 Rep ( Fatehgarh-3 - Beawer ) 18 Nos. Included 0.00 0 0.00
29 7000016517 320 Rep ( Fatehgarh-3 - Beawer ) 18 Nos. Included 0.00 0 0.00
30 7000016517 330 Rep ( Fatehgarh-3 - Beawer ) 18 Nos. Included 0.00 0 0.00
31 7000016517 340 Rep ( Fatehgarh-3 - Beawer ) 18 Nos. Included 0.00 0 0.00
32 7000016517 350 Rep ( Fatehgarh-3 - Beawer ) 18 Nos. Included 0.00 0 0.00
33 7000016517 370 PMU BoQ supply 18 Nos. Included 0.00 0 0.00
34 7000016517 380 PMU BoQ supply 18 Nos. Included 0.00 0 0.00
35 7000016517 390 PMU BoQ supply 18 Nos. Included 0.00 0 0.00
36 7000016517 400 PMU BoQ supply 18 Nos. Included 0.00 0 0.00
37 7000016517 420 420kV SHUNT REACTOR 18 kg Included 0.00 0 0.00
38 7000016517 430 420kV SHUNT REACTOR 18 TOTAL Included 0.00 0 0.00
39 7000016517 440 800kV 50kA AIS EQUIPMENT 18 Freight and Insurance Included 0.00 0 0.00
40 7000016517 450 800kV 50kA AIS EQUIPMENT 18 Installation Portion: Included 0.00 0 0.00
41 7000016517 460 800kV 50kA AIS EQUIPMENT 18 ELECTRICAL/STRUCTURAL WORKS Included 0.00 0 0.00
42 7000016517 470 800kV 50kA AIS EQUIPMENT 18 245 kV 1600A, 50KA Circuit Breakers (3-Phase) with support EA 2 Included 0.00 0 0.00
43 7000016517 480 800kV 50kA AIS EQUIPMENT 18 245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 6 Included 0.00 0 0.00
44 7000016517 490 800kV 50kA AIS EQUIPMENT 18 245kV, 1600A, 50 KA, 3-phase DoubleBreak Tandem Isolator without E/S EA 4 Included 0.00 0 0.00
45 7000016517 500 800kV 50kA AIS EQUIPMENT 18 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with two E/S EA 2 Included 0.00 0 0.00
46 7000016517 510 800kV 50kA AIS EQUIPMENT 18 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with one E/S EA 2 Included 0.00 0 0.00
47 7000016517 520 800kV 50kA AIS EQUIPMENT 18 245 kV,1 phase Bus Post Insulator (except for Line Traps) EA 22 Included 0.00 0 0.00
48 7000016517 530 800kV 50kA AIS EQUIPMENT 18 216kV Surge Arrester (1-phase) EA 6 Included 0.00 0 0.00
49 7000016517 540 800kV 50kA AIS EQUIPMENT 18 245 kV, 4400pf Capacitive Voltage Transformer (1- Phase) EA 6 Included 0.00 0 0.00
50 7000016517 550 420kV, 63kA AIS EQUIPMENT 18 220kV Line Protection Panel (with Automation) EA 2 Included 0.00 0 0.00
51 7000016517 560 420kV, 63kA AIS EQUIPMENT 18 220kV Circuit Breaker Relay Panel with Auto Reclose (with Automation) EA 2 Included 0.00 0 0.00
52 7000016517 570 420kV, 63kA AIS EQUIPMENT 18 Augmentation of Substation automation System for 220kV bay as per Technical - Included 0.00 0 0.00
53 7000016517 580 420kV, 63kA AIS EQUIPMENT 18 Laying of optical cables in GI Pipe/Conduit upto 50MM diameter in cable trench Mtr. 500 Included 0.00 0 0.00
54 7000016517 590 420kV, 63kA AIS EQUIPMENT 18 Splicing of optical Fibre cable joints Single Mode/Multi Mode Fiber Each 50 Included 0.00 0 0.00
55 7000016517 600 420kV, 63kA AIS EQUIPMENT 18 Erection Hardware for 220kV layout (Double Main and Transfer Scheme as per SLD)-Line Bay as per specification SET 2 Included 0.00 0 0.00
56 7000016517 610 420kV, 63kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1-Phase CT including nuts, bolts, all type of washers, packplates, step bolts and gusset platesexcluding foundation bolts EA 6 Included 0.00 0 0.00
57 7000016517 620 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1-Phase High BPI including nuts, bolts, all type of washers, packplates, step bolts and gussetplates excluding foundation bolts EA 6 Included 0.00 0 0.00
58 7000016517 630 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1-Phase BPI including nuts, bolts, all type of washers, packplates, step bolts and gusset platesexcluding foundation bolts EA 16 Included 0.00 0 0.00
59 7000016517 640 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1-Phase SA including nuts, bolts, all type of washers, packplates, step bolts and gusset platesexcluding foundation bolts EA 6 Included 0.00 0 0.00
60 7000016517 650 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 3-Phase ISOLATOR including nuts, bolts, all type of washers, packplates, step bolts and gussetplates excluding foundation bolts EA 8 Included 0.00 0 0.00
61 7000016517 660 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1-Phase CVT including nuts, bolts, all type of washers, packplates, step bolts and gusset platesexcluding foundation bolts EA 6 Included 0.00 0 0.00
62 7000016517 670 245kV, 50kA AIS EQUIPMENT 18 Erection of Pipe Structure - 220 kV 1 - PH BPI for WT including nuts, bolts, all type of washers, packplates, step bolts and gussetplates excluding foundation bolts SET 4 Included 0.00 0 0.00
63 7000016517 680 245kV, 50kA AIS EQUIPMENT 18 Air conditioning system for Switchyard Panel Room of 6m length SET 1 Included 0.00 0 0.00
64 7000016517 690 36kV AIS EQUIPMENT 18 Fire Detection and Alarm System for Switchyard Panel Room of 6 m length SET 1 Included 0.00 0 0.00
65 7000016517 700 36kV AIS EQUIPMENT 18 Lighting Fixture LED Luminaires type FL2 as per tech. specifications EA 20 Included 0.00 0 0.00
66 7000016517 710 Erection Hardware for 765 kV S/Y 18 Lighting Panel type ACP-2 as per technical specification EA 1 Included 0.00 0 0.00
67 7000016517 720 Erection Hardware for 765 kV S/Y 18 Illumination System for switchyard panel room of 6 m length SET 1 Included 0.00 0 0.00
68 7000016517 730 Erection Hardware for 765 kV S/Y 18 Laying of POWER & control cables in Cable trenched including Glanding, Lug, ferrule, Cable Tag etc. Included 0.00 0 0.00
69 7000016517 740 Erection Hardware for 765 kV S/Y 18 1.1kV grade 3.5Cx70 sqmm (PVC) Power Cable KM 5 Included 0.00 0 0.00
70 7000016517 750 Erection Hardware for 765 kV S/Y 18 1.1kV grade 3.5Cx35 sqmm (PVC) Power Cable KM 2 Included 0.00 0 0.00
71 7000016517 760 Erection Hardware for 765 kV S/Y 18 1.1kV grade 4Cx16 sqmm (PVC) Power Cable KM 3 Included 0.00 0 0.00
72 7000016517 770 Erection Hardware for 765 kV S/Y 18 1.1kV grade 4Cx6 sqmm (PVC) Power Cable KM 4 Included 0.00 0 0.00
73 7000016517 780 765kV Insulator and Hardware 18 1.1kV grade 2Cx6 sqmm (PVC) Power Cable KM 5 Included 0.00 0 0.00
74 7000016517 790 765kV Insulator and Hardware 18 1.1kV grade 3Cx2.5 sqmm Control Cable KM 7 Included 0.00 0 0.00
75 7000016517 800 765kV Insulator and Hardware 18 1.1kV grade 5Cx2.5 sqmm Control Cable KM 3 Included 0.00 0 0.00
76 7000016517 810 765kV Insulator and Hardware 18 1.1kV grade 7Cx2.5 sqmm Control Cable KM 2 Included 0.00 0 0.00
77 7000016517 820 765kV Insulator and Hardware 18 1.1kV grade 10Cx2.5 sqmm Control Cable KM 1 Included 0.00 0 0.00
78 7000016517 830 Erection Hardware for 420 kV I Type S/Y 18 1.1kV grade 14Cx2.5 sqmm Control Cable KM 3 Included 0.00 0 0.00
79 7000016517 840 Erection Hardware for 420 kV I Type S/Y 18 1.1kV grade 19Cx2.5 sqmm Control Cable KM 1 Included 0.00 0 0.00
80 7000016517 850 Erection Hardware for 420 kV I Type S/Y 18 1.1kV grade 27Cx2.5 sqmm Control Cable KM 1 Included 0.00 0 0.00
81 7000016517 860 Erection Hardware for 420 kV I Type S/Y 18 Fibre Optic Approach cabling: Including installation hardware like ties/clips/cleats, conduits, ducts, supports, fittings, accessories etc.: 24 Fibre KM 1 Included 0.00 0 0.00
82 7000016517 870 Erection Hardware for 420 kV I Type S/Y 18 220kV, 1600A, 0.5mH, 40 kA Line Trap EA 4 Included 0.00 0 0.00
83 7000016517 880 420kV Insulator and Hardware 18 245 kV ,1 phase Bus Post Insulators for Line Traps EA 12 Included 0.00 0 0.00
84 7000016517 890 420kV Insulator and Hardware 18 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 66 Included 0.00 0 0.00
85 7000016517 900 420kV Insulator and Hardware 18 400KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR QUAD CONDUCTOR EA 24 Included 0.00 0 0.00
86 7000016517 910 Erection Hardware for 220 kV DMT Type S 18 Erection Hardware for 220kV layout (Double Main and TransferScheme)-Transformer Bay as per technical specification SET 3 Included 0.00 0 0.00
87 7000016517 920 220kV Insulator and Hardware 18 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 18 Included 0.00 0 0.00
88 7000016517 930 220kV Insulator and Hardware 18 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITHOUT TURN BUCKLE SUITABLE FOR TWIN CONDUCTOR EA 18 Included 0.00 0 0.00
89 7000016517 940 220kV Insulator and Hardware 18 220KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR TWIN CONDUCTOR EA 9 Included 0.00 0 0.00
90 7000016517 950 Earthmat 18 40 MM MS ROD FOR MAIN EARTHMAT KM 48 Included 0.00 0 0.00
91 7000016517 960 CSD 18 Controlled Switching Device for 420 kV, 3-ph Circuit Breaker EA 9 Included 0.00 0 0.00
92 7000016517 970 CSD 18 Controlled Switching Device for 765 kV, 3-ph Circuit Breaker EA 9 Included 0.00 0 0.00
93 7000016517 980 CRP for 765kV Bays 18 765 kV Circuit Breaker Relay Panel With Auto Reclose (with Automation) EA 11 Included 0.00 0 0.00
94 7000016517 990 CRP for 765kV Bays 18 765kV Line Protection Panel (with Automation) EA 2 Included 0.00 0 0.00
95 7000016517 1000 CRP for 765kV Bays 18 765kV Transformer Protection Panel (For both HV & MV side)-(withAutomation) EA 3 Included 0.00 0 0.00
96 7000016517 1010 CRP for 765kV Bays 18 765kV Reactor Protection Panel (with Automation) EA 2 Included 0.00 0 0.00
97 7000016517 1020 CRP for 765kV Bays 18 765kV Bus Bar Protection Panel (Duplicate)-(with Automation) SET 1 Included 0.00 0 0.00
98 7000016517 1030 CRP for 420kV Bays with SAS 18 400kV Circuit Breaker Relay Panel with Auto Reclose (with Automation) EA 12 Included 0.00 0 0.00
99 7000016517 1040 CRP for 420kV Bays with SAS 18 400kV Transformer Protection Panel (For both HV & MV side)-(withAutomation) EA 3 Included 0.00 0 0.00
100 7000016517 1050 CRP for 420kV Bays with SAS 18 400kV Reactor Protection Panel (with Automation) EA 2 Included 0.00 0 0.00
101 7000016517 1060 CRP for 420kV Bays with SAS 18 Augmentation of existing 400kV bus bar protection scheme.(No. of baysas per specification)-(with Automation) SET 1 Included 0.00 0 0.00
102 7000016517 1070 CRP for 220kV Bays with SAS 18 220kV Circuit Breaker Relay Panel with Auto Reclose (with Automation) EA 3 Included 0.00 0 0.00
103 7000016517 1080 CRP for 220kV Bays with SAS 18 Augmentation of existing 220kV bus bar protection scheme.(No. of baysas per specification)-(with Automation) SET 1 Included 0.00 0 0.00
104 7000016517 1090 SAS-AUG 18 Augmentation of Substation automation System for 220kV bay as perTechnical Specification EA 3 Included 0.00 0 0.00
105 7000016517 1100 SAS-AUG 18 Augmentation of Substation automation System for 400kV Tie bay as perTechnical Specification EA 4 Included 0.00 0 0.00
106 7000016517 1110 SAS-AUG 18 Augmentation of Substation automation System for 400kV Main bay as perTechnical Specification EA 8 Included 0.00 0 0.00
107 7000016517 1120 SAS-AUG 18 Augmentation of Substation automation System for 765kV Tie bay as perTechnical Specification EA 4 Included 0.00 0 0.00
108 7000016517 1130 SAS-AUG 18 Augmentation of Substation automation system for 765kV Main bay as perTechnical Specification EA 7 Included 0.00 0 0.00
109 7000016517 1140 VMS 18 COLOR IP CAMERA, WITH PAN, TILT AND ZOOM FACILITIES, ALONGWITH ALLREQUIRED ITEMS, ACCESSORIES, LINE INTERFACE UNITS, FIBER PATCH CORDS,POWER SUPPLY UNITS, JUNCTION BOXES, CABLES, FIBER OPTIC CABLES, ETC.,AND INCLUDING INTEGRATION IN EXISTING HARDWARE AND SOFTWARE FORAUGMENTATION OF VISUAL MONITORING SYSTEM AS PER TECHNICALSPECIFICATION. SET 1 Included 0.00 0 0.00
110 7000016517 1150 PLCC Equipment 18 765kV,3150A,1.0mH , 50kA Line Trap EA 4 Included 0.00 0 0.00
111 7000016517 1160 POWER & CONTROL CABLE 18 1.1KV GRADE 3.5CX300 SQMM (XLPE) POWER CABLE KM 2 Included 0.00 0 0.00
112 7000016517 1170 POWER & CONTROL CABLE 18 1.1KV GRADE 3.5CX70 SQMM (PVC) POWER CABLE KM 6 Included 0.00 0 0.00
113 7000016517 1180 POWER & CONTROL CABLE 18 1.1KV GRADE 3.5CX35 SQMM (PVC) POWER CABLE KM 2 Included 0.00 0 0.00
114 7000016517 1190 POWER & CONTROL CABLE 18 1.1KV GRADE 4CX16 SQMM (PVC) POWER CABLE KM 2 Included 0.00 0 0.00
115 7000016517 1200 POWER & CONTROL CABLE 18 1.1KV GRADE 4CX6 SQMM (PVC) POWER CABLE KM 20 Included 0.00 0 0.00
116 7000016517 1210 POWER & CONTROL CABLE 18 1.1KV GRADE 2CX6 SQMM (PVC) POWER CABLE KM 14 Included 0.00 0 0.00
117 7000016517 1220 POWER & CONTROL CABLE 18 1.1KV GRADE 3CX2.5 SQMM CONTROL CABLE KM 40 Included 0.00 0 0.00
118 7000016517 1230 POWER & CONTROL CABLE 18 1.1KV GRADE 5CX2.5 SQMM CONTROL CABLE KM 68 Included 0.00 0 0.00
119 7000016517 1240 POWER & CONTROL CABLE 18 1.1KV GRADE 10CX2.5 SQMM CONTROL CABLE KM 31 Included 0.00 0 0.00
120 7000016517 1250 POWER & CONTROL CABLE 18 1.1KV GRADE 19CX1.5 SQMM CONTROL CABLE KM 29 Included 0.00 0 0.00
121 7000016517 1260 POWER & CONTROL CABLE 18 1.1KV GRADE 27CX1.5 SQMM CONTROL CABLE KM 7 Included 0.00 0 0.00
122 7000016517 1270 POWER & CONTROL CABLE 18 4PAIR, 0.5SQMM SCREENED CABLE KM 11 Included 0.00 0 0.00
123 7000016517 1280 AIR CONDITIONING & VENTILATION SYSTEM 28 Air conditioning system for Switchyard Panel Room of 6m length SET 5 Included 0.00 0 0.00
124 7000016517 1290 AIR CONDITIONING & VENTILATION SYSTEM 28 Air conditioning system for Switchyard Panel Room of 9m length SET 4 Included 0.00 0 0.00
125 7000016517 1300 FIRE FIGHTING SYSTEM 18 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 500 MVA,(765/v3)/(400/v3)/(33) kV, 1 -phase Autotransformer SET 10 Included 0.00 0 0.00
126 7000016517 1310 FIRE FIGHTING SYSTEM 18 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 110 MVAR, 765/√3 kVsingle phase Shunt Reactor SET 7 Included 0.00 0 0.00
127 7000016517 1320 FIRE FIGHTING SYSTEM 18 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 500MVA , 400KV/220/33kV, 3-phase Autotransformer SET 3 Included 0.00 0 0.00
128 7000016517 1330 FIRE FIGHTING SYSTEM 18 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 125 MVAR, 420kV, 3 phaseBus Reactor SET 2 Included 0.00 0 0.00
129 7000016517 1340 FIRE FIGHTING SYSTEM 18 Fire Detection and Alarm System for Switchyard Panel Room of 9 mlength SET 4 Included 0.00 0 0.00
130 7000016517 1350 FIRE FIGHTING SYSTEM 18 Fire Detection and Alarm System for Switchyard Panel Room of 6 mlength SET 5 Included 0.00 0 0.00
131 7000016517 1360 FIRE FIGHTING SYSTEM 18 4.5 kg CO2 type Portable Fire extinguisher EA 9 Included 0.00 0 0.00
132 7000016517 1370 ILLUMINATION SYSTEM 18 Lighting Panel type ACP-2 as per technical specification EA 6 Included 0.00 0 0.00
133 7000016517 1380 ILLUMINATION SYSTEM 18 Outdoor Power Receptacle for oilfiltration unit (250A) EA 4 Included 0.00 0 0.00
134 7000016517 1390 ILLUMINATION SYSTEM 18 LED FLOOD LIGHT LUMINARIESTYPE FL-1 (150W) AS PER TECHNICALSPECIFICATION EA 50 Included 0.00 0 0.00
135 7000016517 1400 ILLUMINATION SYSTEM 18 LIGHTING FIXTURE LED LUMINAIRES TYPE FL2 AS PER TECH. SPECIFICATIONS EA 40 Included 0.00 0 0.00
136 7000016517 1410 ILLUMINATION SYSTEM 18 Illumination System for switchyard panel room of 6 m length LS 5 Included 0.00 0 0.00
137 7000016517 1420 ILLUMINATION SYSTEM 18 Illumination System for switchyard panel room of 9 m length LS 4 Included 0.00 0 0.00
138 7000016517 1430 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV WT (1PH) EA 4 Included 0.00 0 0.00
139 7000016517 1440 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV BPI (1PH) EA 63 Included 0.00 0 0.00
140 7000016517 1450 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CVT (1PH) EA 12 Included 0.00 0 0.00
141 7000016517 1460 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CT (1PH) EA 33 Included 0.00 0 0.00
142 7000016517 1470 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CLASS SA (1PH) EA 23 Included 0.00 0 0.00
143 7000016517 1480 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV ISO (1PH) EA 45 Included 0.00 0 0.00
144 7000016517 1490 765 kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV ISO (3PH) EA 25 Included 0.00 0 0.00
145 7000016517 1500 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV ISOLATOR (3PH) EA 29 Included 0.00 0 0.00
146 7000016517 1510 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV ISOLATOR (1PH) EA 18 Included 0.00 0 0.00
147 7000016517 1520 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV BPI (1PH) EA 31 Included 0.00 0 0.00
148 7000016517 1530 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV HBPI (1PH) EA 36 Included 0.00 0 0.00
149 7000016517 1540 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CT (1PH) EA 36 Included 0.00 0 0.00
150 7000016517 1550 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CLASS SA (1PH) EA 15 Included 0.00 0 0.00
151 7000016517 1560 400kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CLASS HIGH LEVELSA (1PH) EA 10 Included 0.00 0 0.00
152 7000016517 1570 220kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV HIGH BPI (1PH) EA 9 Included 0.00 0 0.00
153 7000016517 1580 220kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV BPI (1PH) EA 32 Included 0.00 0 0.00
154 7000016517 1590 220kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CLASS SA (1PH) EA 9 Included 0.00 0 0.00
155 7000016517 1600 220kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV ISOLATOR (3PH) EA 12 Included 0.00 0 0.00
156 7000016517 1610 220kV Equipment support structures 18 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CT (1PH) EA 9 Included 0.00 0 0.00
157 7000016517 1620 Mandatory Spare LOT 18 Spare-765KV Circuit Breaker LOT 1 Included 0.00 0 0.00
158 7000016517 1630 Mandatory Spare LOT 18 Spare-765kV VKDB Isolator LOT 1 Included 0.00 0 0.00
159 7000016517 1640 Mandatory Spare LOT 18 SPARE-765KV CURRENT TRANSFORMER LOT 1 Included 0.00 0 0.00
160 7000016517 1650 Mandatory Spare LOT 18 SPARE-765KV CAPACITIVE VOLTAGE TRANSFORMER LOT 1 Included 0.00 0 0.00
161 7000016517 1660 Mandatory Spare LOT 18 SPARES FOR 624KV SURGE ARRESTER LS 1 Included 0.00 0 0.00
162 7000016517 1670 Mandatory Spare LOT 18 Spare For 400kV Bus Reactor LS 1 Included 0.00 0 0.00
163 7000016517 1680 Mandatory Spare LOT 18 Spares for 420kV Circuit Breaker LS 1 Included 0.00 0 0.00
164 7000016517 1690 Mandatory Spare LOT 18 Spares for 420kV Double break Isolator LS 1 Included 0.00 0 0.00
165 7000016517 1700 Mandatory Spare LOT 18 SPARES FOR 336KV SURGE ARRESTER LS 1 Included 0.00 0 0.00
166 7000016517 1710 Mandatory Spare LOT 18 Spare-420kV BPI SET 1 Included 0.00 0 0.00
167 7000016517 1720 Mandatory Spare LOT 18 Spare-420kV CT 1 SET 1 Included 0.00 0 0.00
168 7000016517 1730 Mandatory Spare LOT 18 Spare-245kV Circuit Breaker SET 1 Included 0.00 0 0.00
169 7000016517 1740 Mandatory Spare LOT 18 Spare-245kV Isolator SET 1 Included 0.00 0 0.00
170 7000016517 1750 Mandatory Spare LOT 18 Spare-245kV CT SET 1 Included 0.00 0 0.00
171 7000016517 1760 Mandatory Spare LOT 18 Spare-245kV BPI SET 1 Included 0.00 0 0.00
172 7000016517 1770 Mandatory Spare LOT 18 Relay & protection Panels (with automation) LS 1 Included 0.00 0 0.00
173 7000016517 1780 Mandatory Spare LOT 18 Spares-Substation Automation System LS 1 Included 0.00 0 0.00
174 7000016517 1790 Mandatory Spare LOT 18 SPARES FOR CLAMPS & CONNECTORS LOT 1 Included 0.00 0 0.00
175 7000016517 1800 Mandatory Spare LOT 18 Spares for Fire Protection System LS 1 Included 0.00 0 0.00
176 7000016517 1810 Mandatory Spare LOT 18 Spare-216kV Surge Arrester SET 1 Included 0.00 0 0.00
177 7000016517 1820 Mandatory Spare LOT 18 SPARE-800KV BUS POST INSULATOR LOT 1 Included 0.00 0 0.00
Total Ex-works Price 0.00 0.00 0.00
Total Type Test charges as per Schedule-7 0.00
Total Ex-works Price including Type Test charges 0.00
Total GST Tax as confirmed by Bidder 0.00
Note : Specify amount of GST on the transaction between the Contractor and the Employer.
* In case the bidder leaves the cell for confirmation of the HSN code and/or GST rate “blank”, the HSN code and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Place : Printed Name :
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566 Schedule - 1 Direct Total 0 0 `
BO Total #REF! 0
Construction of balance work of Transit camp at POWERGRID Jaipur south substation
(SCHEDULE OF RATES AND PRICES : EX-WORKS PRICES)
Bidder’s Name and Address (Lead Partner) : To:
Contract Services
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
Plant and Equipment (including Mandatory Spares Parts) to be supplied, including Type Test Charges for Tests to be conducted. Direct
All Prices are in Indian Rupees. Bought-Out
SI. No. Item Description Unit Qty. Unit Ex-works price Total Ex-works price Mode of Transaction (Direct / Bought-out)
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
Total Ex-Works Price Direct 0.00 Direct
Total Ex-Works Price Bought Out 0.00
Total Ex-Works Price 0.00
Total Type Test charges as per Schedule-7 #REF! #REF! #REF!
Total Ex-works Price including Type Test charges #REF! #REF! #REF!
Discount Sch-1 #REF! MPD Sch-1 #REF!
Dis Alert #REF!
Note : Specify amount of Excise Duty, Sales Tax/'VAT and other taxes payable on the transaction between the Contractor and the Employer and octroi/entry tax as applicable for destination site/state on all items of supply including bought-out finished items (to be identified in the Contract), which shall be dispatched directly from the sub-vendor’s works to the Employer’s site (sale-in-transit), separately in Schedule-5. Excise Duty, Sales tax and other levies for all the bought-out items are to be included in the EXW Price (Col. No. 5) only and not to be indicated in Schedule-5.
Place : Printed Name :
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566 Schedule - 2 Dis
Construction of balance work of Transit camp at POWERGRID Jaipur south substation As per Lum-sum 0
(SCHEDULE OF RATES AND PRICES : FREIGHT & INSURANCE CHARGES) AS per Percent #REF!
As per lum-sum on Sch-2 0.00%
Bidder’s Name and Address (Lead Partner) : To: As per Percent on Sch-2 #REF!
Power Grid Corporation of India Limited Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
…….. …….. …….. …….. …….. …….. Faridabad-121002, Haryana Multipackage Discount 0.00%
All Prices are in Indian Rupees. Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
SI. No. Description Unit Quantity Unit Freight & Insurance Charges Total Freight & Insurance Charges Unit Freight & Insurance Charges Total Freight & Insurance Charges Unit Freight & Insurance Charges Total Freight & Insurance Charges
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
Total F&I Price #REF!
Place : Printed Name :
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566 Schedule - 2
Construction of balance work of Transit camp at POWERGRID Jaipur south substation
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
LOCAL TRANSPORTATION, IN-TRANSIT INSURANCE, LOADING AND UNLOADING
All Prices are in Indian Rupees.
SI. No. PR No PR Line Item No Activity Description Material Code S.No. Description Unit Quantity Unit Freight, In-transit Insurance, loading & unloading Charges Total Freight, In-transit Insurance, loading & unloading Charges
1 7000016517 20 GANTRY STRCUTURES 1000011713 1 M Included
2 7000016517 30 GANTRY STRCUTURES 1000012373 2 EA Included
3 7000016517 40 GANTRY STRCUTURES 1000015953 3 EA Included
4 7000016517 50 GANTRY STRCUTURES 1000015954 4 EA Included
5 7000016517 70 Tele BoQ at Fatehgarh-3 (Extn) 1000031367 5 EA Included
6 7000016517 80 Tele BoQ at Fatehgarh-3 (Extn) 1000031405 6 M Included
7 7000016517 90 Tele BoQ at Fatehgarh-3 (Extn) 1000018706 7 M Included
8 7000016517 100 Tele BoQ at Fatehgarh-3 (Extn) 1000031374 8 M Included
9 7000016517 110 Tele BoQ at Fatehgarh-3 (Extn) 1000034950 9 NOT APPLICABLE
10 7000016517 120 Tele BoQ at Fatehgarh-3 (Extn) 1000031381 10 M Included
11 7000016517 130 Tele BoQ at Fatehgarh-3 (Extn) 1000026228 11 M Included
12 7000016517 140 Tele BoQ at Fatehgarh-3 (Extn) 1000028495 12 M Included
13 7000016517 150 Tele BoQ at Fatehgarh-3 (Extn) 1000028265 13 M Included
14 7000016517 160 Tele BoQ at Fatehgarh-3 (Extn) 1000034998 14 M Included
15 7000016517 170 Tele BoQ at Fatehgarh-3 (Extn) 1000030942 15
16 7000016517 180 Tele BoQ at Fatehgarh-3 (Extn) 1000023471 16 SET Included
17 7000016517 200 Spares- Tele BoQ at Fatehgarh-3 1000031369 17
18 7000016517 210 Spares- Tele BoQ at Fatehgarh-3 1000018706 18 Nos Included
19 7000016517 220 Spares- Tele BoQ at Fatehgarh-3 1000031405 19
20 7000016517 230 Spares- Tele BoQ at Fatehgarh-3 1000031374 20 SET Included
21 7000016517 240 Spares- Tele BoQ at Fatehgarh-3 1000034950 21
22 7000016517 250 Spares- Tele BoQ at Fatehgarh-3 1000031381 22 Nos Included
23 7000016517 260 Spares- Tele BoQ at Fatehgarh-3 1000034998 23 No. Included
24 7000016517 270 Spares- Tele BoQ at Fatehgarh-3 1000031398 24
25 7000016517 280 Spares- Tele BoQ at Fatehgarh-3 1000030942 25 Nos. Included
26 7000016517 290 Spares- Tele BoQ at Fatehgarh-3 1000023469 26 Nos. Included
27 7000016517 300 Rep ( Fatehgarh-3 - Beawer ) 1000031367 27 Nos. Included
28 7000016517 310 Rep ( Fatehgarh-3 - Beawer ) 1000031405 28 Nos. Included
29 7000016517 320 Rep ( Fatehgarh-3 - Beawer ) 1000026228 29 Nos. Included
30 7000016517 330 Rep ( Fatehgarh-3 - Beawer ) 1000023469 30 Nos. Included
31 7000016517 340 Rep ( Fatehgarh-3 - Beawer ) 1000023471 31 Nos. Included
32 7000016517 350 Rep ( Fatehgarh-3 - Beawer ) 1000031403 32 Nos. Included
33 7000016517 370 PMU BoQ supply 1000017518 33 Nos. Included
34 7000016517 380 PMU BoQ supply 1000022512 34 Nos. Included
35 7000016517 390 PMU BoQ supply 1000022510 35 Nos. Included
36 7000016517 400 PMU BoQ supply 1000022487 36 Nos. Included
37 7000016517 420 420kV SHUNT REACTOR 1000000705 37 kg Included
38 7000016517 430 420kV SHUNT REACTOR 1000013947 Insulating Oil for 125 MVAR, 420kV 3-phase Bus Reactor SET 2 Included
39 7000016517 440 800kV 50kA AIS EQUIPMENT 1000005827 765kV, 3150A, 50kA Circuit Breaker(3-Phase) with closing resistor (withsupport structure) EA 4 Included
40 7000016517 450 800kV 50kA AIS EQUIPMENT 1000005826 765kV, 3150A, 50kA Circuit Breaker(3-Phase) without closing resistor(with support structure) EA 7 Included
41 7000016517 460 800kV 50kA AIS EQUIPMENT 1000005848 765 kV, 3000A, 50KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 33 Included
42 7000016517 470 800kV 50kA AIS EQUIPMENT 1000005840 765 kV,8800 pF Capacitive Voltage Transformer (1-Phase) EA 12 Included
43 7000016517 480 800kV 50kA AIS EQUIPMENT 1000005853 765kV, 3150A, 50Ka, Vertical Knee/DoubleBreak Isolator (3-Phase) with one E/S EA 15 Included
44 7000016517 490 800kV 50kA AIS EQUIPMENT 1000005854 765kV, 3150A, 50Ka, Vertical Knee/DoubleBreak Isolator (3-Phase) with two E/S EA 10 Included
45 7000016517 500 800kV 50kA AIS EQUIPMENT 1000005820 765kV, 3150A, 50kA, Vertical Knee/DoubleBreak Isolator (1-Phase) with one E/S EA 17 Included
46 7000016517 510 800kV 50kA AIS EQUIPMENT 1000005819 765kV, 3150A, 50kA, Vertical Knee/DoubleBreak Isolator (1-Phase) without E/S EA 10 Included
47 7000016517 520 800kV 50kA AIS EQUIPMENT 1000020421 624kV Surge Arrester (1-Phase) EA 23 Included
48 7000016517 530 800kV 50kA AIS EQUIPMENT 1000005791 765 kV, 1 phase Bus Post Insulator (except for Line Traps) EA 63 Included
49 7000016517 540 800kV 50kA AIS EQUIPMENT 1000005790 765 kV ,1 phase Bus Post Insulators for Line Traps EA 12 Included
50 7000016517 550 420kV, 63kA AIS EQUIPMENT 1000004401 420 kV, 1 phase Bus Post Insulator (except for Line Traps) EA 31 Included
51 7000016517 560 420kV, 63kA AIS EQUIPMENT 1000020419 336kV Surge Arrester (1-phase) EA 25 Included
52 7000016517 570 420kV, 63kA AIS EQUIPMENT 1000004495 420kV, 3150A, 63KA, Isolator (1 phase)(Double Break) without E/S EA 8 Included
53 7000016517 580 420kV, 63kA AIS EQUIPMENT 1000004496 420kV, 3150A, 63KA, Isolator (1 phase)(Double Break) with one E/S EA 10 Included
54 7000016517 590 420kV, 63kA AIS EQUIPMENT 1000004498 420kV, 3150A, 63KA, Isolator (3-phase)(Double Break) with one E/S EA 29 Included
55 7000016517 600 420kV, 63kA AIS EQUIPMENT 1000004463 420 kV, 3000A, 63KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 36 Included
56 7000016517 610 420kV, 63kA AIS EQUIPMENT 1000004501 420kV, 3150A, 63kA Circuit Breaker (3-Phase) without closing resistorand with Support Structure EA 12 Included
57 7000016517 620 245kV, 50kA AIS EQUIPMENT 1000001683 245kV, 1600A, 50KA Circuit Breaker(3-Phase) with support structure EA 3 Included
58 7000016517 630 245kV, 50kA AIS EQUIPMENT 1000001684 245 kV, 1600A, 50KA, 1-Phase CurrentTransformer with 120% extended currentrating EA 9 Included
59 7000016517 640 245kV, 50kA AIS EQUIPMENT 1000001688 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with one E/S EA 3 Included
60 7000016517 650 245kV, 50kA AIS EQUIPMENT 1000001689 245kV, 1600A, 50 KA, 3-phase DoubleBreak Isolator with two E/S EA 3 Included
61 7000016517 660 245kV, 50kA AIS EQUIPMENT 1000032777 245KV, 1600 A, 50KA, 3-PHASE, DOUBLE BREAK TANDEM ISOLATOR WITHOUT E/S EA 6 Included
62 7000016517 670 245kV, 50kA AIS EQUIPMENT 1000020417 216kV Surge Arrester (1-phase) EA 9 Included
63 7000016517 680 245kV, 50kA AIS EQUIPMENT 1000001695 245 kV, 1 phase Bus Post Insulator (except for Line Traps) EA 32 Included
64 7000016517 690 36kV AIS EQUIPMENT 1000001998 Current transformer (33kV) for transformer Netural along with supportstructure & terminal connector SET 3 Included
65 7000016517 700 36kV AIS EQUIPMENT 1000001999 Current transformer (33kV) for Reactor Neutral along with supportstructure & terminal connector EA 2 Included
66 7000016517 710 Erection Hardware for 765 kV S/Y 1000015928 Bus post insulators, spacers, equipmentsupport structures including foundationbolts,conductor(s), Al tube, clamp,connectors including 765 KV and neutralbushings terminal connectors etc forNeutral formation for two (2) Reactorbanks (each bank comprise of threesingle phase units of Reactors) andconnection to neutral groundingReactors (as applicable) and makingconnection arrangement to connect spareunit in place of any unit of all thetwo banks without pysical shifting LOT 1 Included
67 7000016517 720 Erection Hardware for 765 kV S/Y 1000054975 BUS POST INSULATORS, SPACERS, EQUIPMENT SUPPORT STRUCTURES,CONDUCTORS, AL TUBE, CLAMP, CONNECTORS (INCLUDING 765KV, 400KV,TERTIARY AND NEUTURAL BUSHING TERMINAL CONNECTORS ETC) FOR ARRANGEMENTOF NETURAL FORMATION FOR TRANSFORMER(S), DELTA FORMATION FOR THREEBANKS (EACH BANK COMPRISES OF 3 SINGLE PHASE UNITS OFAUTOTRANSFORMERS) AND MAKING CONNECTION ARRANGEMENT TO CONNECT SPAREUNIT IN PLACE OF ANY UNIT OF THE BANK WITHOUT PHYSICAL SHIFTING LOT 1 Included
68 7000016517 730 Erection Hardware for 765 kV S/Y 1000011362 Erection Hardware for 765kV I type layout-Spare bay of half dia. asper technical specification SET 1 Included
69 7000016517 740 Erection Hardware for 765 kV S/Y 1000011349 Erection Hardware for 765kV I type layout-Bus Reactor bay as pertechnical specification SET 2 Included
70 7000016517 750 Erection Hardware for 765 kV S/Y 1000011363 Erection Hardware for 765kV I type layout-Transformer bay as pertechnical specification SET 3 Included
71 7000016517 760 Erection Hardware for 765 kV S/Y 1000011358 Erection Hardware for 765kV I type layout-Line bay as per technicalspecification SET 2 Included
72 7000016517 770 Erection Hardware for 765 kV S/Y 1000011350 Erection Hardware for 765kV I type layout-Bus Work (For one diameters)as per technical specification SET 4 Included
73 7000016517 780 765kV Insulator and Hardware 1000055992 765KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR QUAD CONDUCTOR EA 6 Included
74 7000016517 790 765kV Insulator and Hardware 1000055993 765KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH THROUGH CLAMP SUITABLE FOR QUAD CONDUCTOR EA 27 Included
75 7000016517 800 765kV Insulator and Hardware 1000055995 765KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITHOUT TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 63 Included
76 7000016517 810 765kV Insulator and Hardware 1000055996 765KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR HEXA CONDUCTOR EA 6 Included
77 7000016517 820 765kV Insulator and Hardware 1000055997 765KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 63 Included
78 7000016517 830 Erection Hardware for 420 kV I Type S/Y 1000011318 Erection Hardware for 400kV I type layout-Bus Work (For one diameter)as per technical specification SET 3 Included
79 7000016517 840 Erection Hardware for 420 kV I Type S/Y 1000011327 Erection Hardware for 400kV I type layout-Transformer bay as pertechnical specification SET 5 Included
80 7000016517 850 Erection Hardware for 420 kV I Type S/Y 1000011317 Erection Hardware for 400kV I type layout-Bus Reactor bay as pertechnical specification SET 2 Included
81 7000016517 860 Erection Hardware for 420 kV I Type S/Y 1000011326 Erection Hardware for 400kV I type layout-Spare bay of half dia as pertechnical specification SET 1 Included
82 7000016517 870 Erection Hardware for 420 kV I Type S/Y 1000011320 Erection Hardware for 400kV I type layout-Any feeder Extn. on existinghalf dia. as per technical specification SET 1 Included
83 7000016517 880 420kV Insulator and Hardware 1000055984 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITHOUT TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 66 Included
84 7000016517 890 420kV Insulator and Hardware 1000055991 400KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH TURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 66 Included
85 7000016517 900 420kV Insulator and Hardware 1000055986 400KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR QUAD CONDUCTOR EA 24 Included
86 7000016517 910 Erection Hardware for 220 kV DMT Type S 1000011264 Erection Hardware for 220kV layout (Double Main and TransferScheme)-Transformer Bay as per technical specification SET 3 Included
87 7000016517 920 220kV Insulator and Hardware 1000055981 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGS WITHTURN BUCKLE SUITABLE FOR QUAD CONDUCTOR EA 18 Included
88 7000016517 930 220kV Insulator and Hardware 1000055980 220KV TENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITHOUT TURN BUCKLE SUITABLE FOR TWIN CONDUCTOR EA 18 Included
89 7000016517 940 220kV Insulator and Hardware 1000055975 220KV SUSPENSION INSULATOR STRING AND ASSOCIATED HARDWARE FITTINGSWITH DROP CLAMP SUITABLE FOR TWIN CONDUCTOR EA 9 Included
90 7000016517 950 Earthmat 1000032055 40 MM MS ROD FOR MAIN EARTHMAT KM 48 Included
91 7000016517 960 CSD 1000009713 Controlled Switching Device for 420 kV, 3-ph Circuit Breaker EA 9 Included
92 7000016517 970 CSD 1000009714 Controlled Switching Device for 765 kV, 3-ph Circuit Breaker EA 9 Included
93 7000016517 980 CRP for 765kV Bays 1000005074 765 kV Circuit Breaker Relay Panel With Auto Reclose (with Automation) EA 11 Included
94 7000016517 990 CRP for 765kV Bays 1000005522 765kV Line Protection Panel (with Automation) EA 2 Included
95 7000016517 1000 CRP for 765kV Bays 1000005789 765kV Transformer Protection Panel (For both HV & MV side)-(withAutomation) EA 3 Included
96 7000016517 1010 CRP for 765kV Bays 1000005533 765kV Reactor Protection Panel (with Automation) EA 2 Included
97 7000016517 1020 CRP for 765kV Bays 1000005071 765kV Bus Bar Protection Panel (Duplicate)-(with Automation) SET 1 Included
98 7000016517 1030 CRP for 420kV Bays with SAS 1000002165 400kV Circuit Breaker Relay Panel with Auto Reclose (with Automation) EA 12 Included
99 7000016517 1040 CRP for 420kV Bays with SAS 1000004274 400kV Transformer Protection Panel (For both HV & MV side)-(withAutomation) EA 3 Included
100 7000016517 1050 CRP for 420kV Bays with SAS 1000003407 400kV Reactor Protection Panel (with Automation) EA 2 Included
101 7000016517 1060 CRP for 420kV Bays with SAS 1000002146 Augmentation of existing 400kV bus bar protection scheme.(No. of baysas per specification)-(with Automation) SET 1 Included
102 7000016517 1070 CRP for 220kV Bays with SAS 1000001170 220kV Circuit Breaker Relay Panel with Auto Reclose (with Automation) EA 3 Included
103 7000016517 1080 CRP for 220kV Bays with SAS 1000001167 Augmentation of existing 220kV bus bar protection scheme.(No. of baysas per specification)-(with Automation) SET 1 Included
104 7000016517 1090 SAS-AUG 1000001333 Augmentation of Substation automation System for 220kV bay as perTechnical Specification EA 3 Included
105 7000016517 1100 SAS-AUG 1000003411 Augmentation of Substation automation System for 400kV Tie bay as perTechnical Specification EA 4 Included
106 7000016517 1110 SAS-AUG 1000003409 Augmentation of Substation automation System for 400kV Main bay as perTechnical Specification EA 8 Included
107 7000016517 1120 SAS-AUG 1000005537 Augmentation of Substation automation System for 765kV Tie bay as perTechnical Specification EA 4 Included
108 7000016517 1130 SAS-AUG 1000005535 Augmentation of Substation automation system for 765kV Main bay as perTechnical Specification EA 7 Included
109 7000016517 1140 VMS 1000030433 COLOR IP CAMERA, WITH PAN, TILT AND ZOOM FACILITIES, ALONGWITH ALLREQUIRED ITEMS, ACCESSORIES, LINE INTERFACE UNITS, FIBER PATCH CORDS,POWER SUPPLY UNITS, JUNCTION BOXES, CABLES, FIBER OPTIC CABLES, ETC.,AND INCLUDING INTEGRATION IN EXISTING HARDWARE AND SOFTWARE FORAUGMENTATION OF VISUAL MONITORING SYSTEM AS PER TECHNICALSPECIFICATION. SET 1 Included
110 7000016517 1150 PLCC Equipment 1000005823 765kV,3150A,1.0mH , 50kA Line Trap EA 4 Included
111 7000016517 1160 POWER & CONTROL CABLE 1000031951 1.1KV GRADE 3.5CX300 SQMM (XLPE) POWER CABLE KM 2 Included
112 7000016517 1170 POWER & CONTROL CABLE 1000031957 1.1KV GRADE 3.5CX70 SQMM (PVC) POWER CABLE KM 6 Included
113 7000016517 1180 POWER & CONTROL CABLE 1000031953 1.1KV GRADE 3.5CX35 SQMM (PVC) POWER CABLE KM 2 Included
114 7000016517 1190 POWER & CONTROL CABLE 1000031976 1.1KV GRADE 4CX16 SQMM (PVC) POWER CABLE KM 2 Included
115 7000016517 1200 POWER & CONTROL CABLE 1000031985 1.1KV GRADE 4CX6 SQMM (PVC) POWER CABLE KM 20 Included
116 7000016517 1210 POWER & CONTROL CABLE 1000031943 1.1KV GRADE 2CX6 SQMM (PVC) POWER CABLE KM 14 Included
117 7000016517 1220 POWER & CONTROL CABLE 1000031964 1.1KV GRADE 3CX2.5 SQMM CONTROL CABLE KM 40 Included
118 7000016517 1230 POWER & CONTROL CABLE 1000031987 1.1KV GRADE 5CX2.5 SQMM CONTROL CABLE KM 68 Included
119 7000016517 1240 POWER & CONTROL CABLE 1000031887 1.1KV GRADE 10CX2.5 SQMM CONTROL CABLE KM 31 Included
120 7000016517 1250 POWER & CONTROL CABLE 1000056264 1.1KV GRADE 19CX1.5 SQMM CONTROL CABLE KM 29 Included
121 7000016517 1260 POWER & CONTROL CABLE 1000056265 1.1KV GRADE 27CX1.5 SQMM CONTROL CABLE KM 7 Included
122 7000016517 1270 POWER & CONTROL CABLE 1000032050 4PAIR, 0.5SQMM SCREENED CABLE KM 11 Included
123 7000016517 1280 AIR CONDITIONING & VENTILATION SYSTEM 1000006284 Air conditioning system for Switchyard Panel Room of 6m length SET 5 Included
124 7000016517 1290 AIR CONDITIONING & VENTILATION SYSTEM 1000006285 Air conditioning system for Switchyard Panel Room of 9m length SET 4 Included
125 7000016517 1300 FIRE FIGHTING SYSTEM 1000012072 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 500 MVA,(765/v3)/(400/v3)/(33) kV, 1 -phase Autotransformer SET 10 Included
126 7000016517 1310 FIRE FIGHTING SYSTEM 1000012041 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 110 MVAR, 765/√3 kVsingle phase Shunt Reactor SET 7 Included
127 7000016517 1320 FIRE FIGHTING SYSTEM 1000012069 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 500MVA , 400KV/220/33kV, 3-phase Autotransformer SET 3 Included
128 7000016517 1330 FIRE FIGHTING SYSTEM 1000012042 HVW spray system, Hydrant system and complete U/G & O/G piping andaccessories etc. out side the pump house for 125 MVAR, 420kV, 3 phaseBus Reactor SET 2 Included
129 7000016517 1340 FIRE FIGHTING SYSTEM 1000012019 Fire Detection and Alarm System for Switchyard Panel Room of 9 mlength SET 4 Included
130 7000016517 1350 FIRE FIGHTING SYSTEM 1000012018 Fire Detection and Alarm System for Switchyard Panel Room of 6 mlength SET 5 Included
131 7000016517 1360 FIRE FIGHTING SYSTEM 1000012022 4.5 kg CO2 type Portable Fire extinguisher EA 9 Included
132 7000016517 1370 ILLUMINATION SYSTEM 1000014547 Lighting Panel type ACP-2 as per technical specification EA 6 Included
133 7000016517 1380 ILLUMINATION SYSTEM 1000001894 Outdoor Power Receptacle for oilfiltration unit (250A) EA 4 Included
134 7000016517 1390 ILLUMINATION SYSTEM 1000038387 LED FLOOD LIGHT LUMINARIESTYPE FL-1 (150W) AS PER TECHNICALSPECIFICATION EA 50 Included
135 7000016517 1400 ILLUMINATION SYSTEM 1000038325 LIGHTING FIXTURE LED LUMINAIRES TYPE FL2 AS PER TECH. SPECIFICATIONS EA 40 Included
136 7000016517 1410 ILLUMINATION SYSTEM 1000013795 Illumination System for switchyard panel room of 6 m length LS 5 Included
137 7000016517 1420 ILLUMINATION SYSTEM 1000013796 Illumination System for switchyard panel room of 9 m length LS 4 Included
138 7000016517 1430 765 kV Equipment support structures 1000050816 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV WT (1PH) EA 4 Included
139 7000016517 1440 765 kV Equipment support structures 1000050811 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV BPI (1PH) EA 63 Included
140 7000016517 1450 765 kV Equipment support structures 1000050813 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CVT (1PH) EA 12 Included
141 7000016517 1460 765 kV Equipment support structures 1000050812 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CT (1PH) EA 33 Included
142 7000016517 1470 765 kV Equipment support structures 1000050815 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV CLASS SA (1PH) EA 23 Included
143 7000016517 1480 765 kV Equipment support structures 1000050814 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV ISO (1PH) EA 45 Included
144 7000016517 1490 765 kV Equipment support structures 1000050817 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-765KV ISO (3PH) EA 25 Included
145 7000016517 1500 400kV Equipment support structures 1000049657 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV ISOLATOR (3PH) EA 29 Included
146 7000016517 1510 400kV Equipment support structures 1000050810 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV ISOLATOR (1PH) EA 18 Included
147 7000016517 1520 400kV Equipment support structures 1000049652 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV BPI (1PH) EA 31 Included
148 7000016517 1530 400kV Equipment support structures 1000054972 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV HBPI (1PH) EA 36 Included
149 7000016517 1540 400kV Equipment support structures 1000049653 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CT (1PH) EA 36 Included
150 7000016517 1550 400kV Equipment support structures 1000049655 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CLASS SA (1PH) EA 15 Included
151 7000016517 1560 400kV Equipment support structures 1000054973 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-400KV CLASS HIGH LEVELSA (1PH) EA 10 Included
152 7000016517 1570 220kV Equipment support structures 1000052285 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV HIGH BPI (1PH) EA 9 Included
153 7000016517 1580 220kV Equipment support structures 1000049646 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV BPI (1PH) EA 32 Included
154 7000016517 1590 220kV Equipment support structures 1000049649 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CLASS SA (1PH) EA 9 Included
155 7000016517 1600 220kV Equipment support structures 1000049651 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV ISOLATOR (3PH) EA 12 Included
156 7000016517 1610 220kV Equipment support structures 1000049647 EQUIPMENT STRUCTURE INCLUDING FOUNDATION BOLT-220KV CT (1PH) EA 9 Included
157 7000016517 1620 Mandatory Spare LOT 1000027625 Spare-765KV Circuit Breaker LOT 1 Included
158 7000016517 1630 Mandatory Spare LOT 1000028091 Spare-765kV VKDB Isolator LOT 1 Included
159 7000016517 1640 Mandatory Spare LOT 1000054976 SPARE-765KV CURRENT TRANSFORMER LOT 1 Included
160 7000016517 1650 Mandatory Spare LOT 1000054977 SPARE-765KV CAPACITIVE VOLTAGE TRANSFORMER LOT 1 Included
161 7000016517 1660 Mandatory Spare LOT 1000028372 SPARES FOR 624KV SURGE ARRESTER LS 1 Included
162 7000016517 1670 Mandatory Spare LOT 1000028245 Spare For 400kV Bus Reactor LS 1 Included
163 7000016517 1680 Mandatory Spare LOT 1000019918 Spares for 420kV Circuit Breaker LS 1 Included
164 7000016517 1690 Mandatory Spare LOT 1000019919 Spares for 420kV Double break Isolator LS 1 Included
165 7000016517 1700 Mandatory Spare LOT 1000024186 SPARES FOR 336KV SURGE ARRESTER LS 1 Included
166 7000016517 1710 Mandatory Spare LOT 1000025940 Spare-420kV BPI SET 1 Included
167 7000016517 1720 Mandatory Spare LOT 1000025941 Spare-420kV CT 1 SET 1 Included
168 7000016517 1730 Mandatory Spare LOT 1000025935 Spare-245kV Circuit Breaker SET 1 Included
169 7000016517 1740 Mandatory Spare LOT 1000025936 Spare-245kV Isolator SET 1 Included
170 7000016517 1750 Mandatory Spare LOT 1000025933 Spare-245kV CT SET 1 Included
171 7000016517 1760 Mandatory Spare LOT 1000025932 Spare-245kV BPI SET 1 Included
172 7000016517 1770 Mandatory Spare LOT 1000019912 Relay & protection Panels (with automation) LS 1 Included
173 7000016517 1780 Mandatory Spare LOT 1000019927 Spares-Substation Automation System LS 1 Included
174 7000016517 1790 Mandatory Spare LOT 1000053851 SPARES FOR CLAMPS & CONNECTORS LOT 1 Included
175 7000016517 1800 Mandatory Spare LOT 1000019925 Spares for Fire Protection System LS 1 Included
176 7000016517 1810 Mandatory Spare LOT 1000025930 Spare-216kV Surge Arrester SET 1 Included
177 7000016517 1820 Mandatory Spare LOT 1000054979 SPARE-800KV BUS POST INSULATOR LOT 1 Included
Total F&I Price 0.00
Place: Printed Name :
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566 Schedule - 3
Construction of balance work of Transit camp at POWERGRID Jaipur south substation As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-3 0.00%
Bidder’s Name and Address (Lead Partner) : To: As per Percent on Sch-3 #REF!
Power Grid Corporation of India Limited Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
…….. …….. …….. …….. …….. …….. Faridabad-121002, Haryana Multipackage lum-sum 0.00%
INSTALLATION CHARGES INSTALLATION CHARGES Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
All Prices are in Indian Rupees.
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column '8’ is confirmed. If not indicate applicable the SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Erection Charges Total Erection Charges Total GST as confirmed by Bidder Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges
1 7000016517 10 10 10 WIRING/SUB MAIN WIRING 130000026 995433 18 Wiring for light point/ fan point/ call bell point/ exhaust fan point with 1.5. Sq. mm PVC insulated, copper conductor single core cable in in surface/ recessed PVC conduit with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq mm FR PVC insulated copper conductor single core cable etc as required. Group B Point 150 Included 0.00 0 0
2 7000016517 10 10 20 WIRING/SUB MAIN WIRING 130000029 995454 18 Wiring for light/power plug with 2x4 Sq. mm PVC insulated, copper conductor single core cable in surface/recessed PVC conduit alongwith 1 no. 4 sqmm FR PVC insulated copper conductor single core cable for loop earthing as required. Mtr. 300 Included 0.00 0 0
3 7000016517 10 10 30 WIRING/SUB MAIN WIRING 995454 18 Wiring for circuit/submain wiring along with earth wire with the following sizes of FR PVC insulated copper conductor single core cable in surface/recessed PVC conduit as required. Included 0.00 0 0
4 7000016517 10 10 50 WIRING/SUB MAIN WIRING 130000031 995454 18 2X1.5 sqmm + 1X 1.5 sqmm earth wire Mtr. 300 Included 0.00 0 0
5 7000016517 10 10 60 WIRING/SUB MAIN WIRING 130000032 995454 18 2X2.5 sqmm + 1X 2.5 sqmm earth wire Mtr. 200 Included 0.00 0 0
6 7000016517 10 10 70 WIRING/SUB MAIN WIRING 130000034 995428 18 2X6 sqmm + 1X 6 sqmm earth wire (for AC) Mtr. 150 Included 0.00 0 0
7 7000016517 10 10 80 WIRING/SUB MAIN WIRING 130000041 995455 18 4X16 sqmm + 2X 16 sqmm earth wire (for Meter box to MCB DB) Mtr. 30 Included 0.00 0 0
8 7000016517 10 10 90 WIRING/SUB MAIN WIRING 995428 18 Supplying and fixing of following sizes of PVC conduit along with the accessories in surface/recess including cutting the wall and making good the same in case of recessed conduit as required. Included 0.00 0 0
9 7000016517 10 10 100 WIRING/SUB MAIN WIRING 130000092 995424 18 20 mm Mtr. 2000 Included 0.00 0 0
10 7000016517 10 10 110 WIRING/SUB MAIN WIRING 130000093 995454 18 25 mm Mtr. 700 Included 0.00 0 0
11 7000016517 10 10 120 WIRING/SUB MAIN WIRING 130000094 995432 18 32 mm Mtr. 150 Included 0.00 0 0
12 7000016517 10 10 130 WIRING/SUB MAIN WIRING 995432 18 Supplying and fixing metal box of the following sizes on surface or in recess with suitable size of phenolic laminated sheet cover in the front including painting etc. as required. Included 0.00 0 0
13 7000016517 10 10 140 WIRING/SUB MAIN WIRING 130000097 995432 18 75 mm x 75 mm x 60 mm deep (for telephone and TV socket) Each 20 Included 0.00 0 0
14 7000016517 10 10 160 WIRING/SUB MAIN WIRING 130000098 995421 18 100 mm x 100mm x 60 mm deep Each 8 Included 0.00 0 0
15 7000016517 10 10 170 WIRING/SUB MAIN WIRING 130000107 995421 18 200 mm x 150 mm x 100 mm deep (Junction BOX) Each 5 Included 0.00 0 0
16 7000016517 10 10 180 WIRING/SUB MAIN WIRING 130000145 995421 18 Supplying and fixing suitable size GI box with modular plate and cover in front on surface or in recess including providing and fixing 3 pin 5/6 Amps. modular socket outlet and 5/6 Amp. modular switch connections, painting etc. as required (for light plug point) Each 42 Included 0.00 0 0
17 7000016517 10 10 190 WIRING/SUB MAIN WIRING 130000146 995462 18 Supplying and fixing suitable size GI box with modular plate and cover in front on surface or in recess including providing and fixing 6 pin 15/16 Amps and 5/6 amps modular socket outlet and 15/6 Amp. modular switch connections, painting etc. as required (for power plug point) Each 20 Included 0.00 0 0
18 7000016517 10 10 200 SUPPLY & INSTALLATION OF PANEL/DB/MCB/MCBDB ETC. 995462 18 Supplying and fixing 5 to 32 Amps rating 240V miniature circuit breaker suitable for lighting and other loads of the following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required. Included 0.00 0 0
19 7000016517 10 10 210 SUPPLY & INSTALLATION OF PANEL/DB/MCB/MCBDB ETC. 130000233 995462 18 Single Pole Each 36 Included 0.00 0 0
20 7000016517 10 10 220 SUPPLY & INSTALLATION OF PANEL/DB/MCB/MCBDB ETC. 995462 18 Supply and fixing following rating four pole (Three phase and neutral) 415V RCCB having a senstivity current upto 30 mA in the existing MCB DB Complete with connections testing and commissioning etc. as required. Included 0.00 0 0
21 7000016517 10 10 230 SUPPLY & INSTALLATION OF PANEL/DB/MCB/MCBDB ETC. 130000248 995462 18 40 A Each 2 Included 0.00 0 0
22 7000016517 10 10 240 SUPPLY & INSTALLATION OF PANEL/DB/MCB/MCBDB ETC. 130000252 995454 18 Supplying and fixing 20 Amps 240 volts SPN industrial type socket outlet with 2 pole and earth metal enclosed plug top along with 20 Amp G series SP,MCB in sheet steel enclosure on surface or in recess with chained metal cover for the socket outlet and complete in all respect (for AC and geyser points) Each 20 Included 0.00 0 0
23 7000016517 10 10 250 SUPPLY & INSTALLATION OF PANEL/DB/MCB/MCBDB ETC. 995454 18 MCB Distribution Board : Supplying and fixing following way, three pole and neutral,pre wired, steel sheet, MCB Distribution Board, 415 V on surface/recess, complete with loose wire box, rterminal blocks, duly pre wired with suitable size FR PVC insulated copper conductor upto terminal blocks, tinned copper busbar, neutral busbar, earth bar, din bar, detachable gland, plate, interconnections, phosphatized and powder painted including earthing etc as required (but without MCB/RCCB/Isolator) Included 0.00 0 0
24 7000016517 10 10 260 SUPPLY & INSTALLATION OF PANEL/DB/MCB/MCBDB ETC. 130000197 995454 18 6 WAY(4+18), double door Each 2 Included 0.00 0 0
25 7000016517 10 10 270 INSTALLATION OF FIXTURE/FAN ETC. 130000197 995454 18 Installation, testing and commissioning of prewired fluorescent fitting/compact fluorescent fitting of all typescomplete with all accessories and tubes etc. directly on ceiling / wall including connections with 1.5 Sq.mm PVC insulated copper conductor single core cable etc as required. Each 90 Included 0.00 0 0
26 7000016517 10 10 280 INSTALLATION OF FIXTURE/FAN ETC. 130000159 995454 18 Installation, testing and commissioning of ceiling fan including wiring the down rod of standard length (upto 30 cm) with 1.5 Sq.mm PVC insulated copper conductor single core cable , including providing and fixing of phenolic laminated sheet coveron the fan box etc as required. Each 30 Included 0.00 0 0
27 7000016517 10 10 290 INSTALLATION OF FIXTURE/FAN ETC. 130000129 995451 18 Supply and fixing stepped type electronic fan regulator on the existing modular plate switch box including connections but exclduing modular plate etc as required Each 30 0.00 0 0
28 7000016517 10 10 300 INSTALLATION OF FIXTURE/FAN ETC. 130000163 995454 18 Numbering of ceiling fan/exhaust fan/fluorescent fitting as required. Each 130 Included 0.00 0 0
29 7000016517 10 10 310 INSTALLATION OF FIXTURE/FAN ETC. 130000164 995454 18 Installation of exhaust fan upto 450 mm sweep in the existing opening, including making the hole to suit the size of the above fan, making good the damage. Connection, testing and commissioning etc. as required. Each 10 Included 0.00 0 0
30 7000016517 10 10 320 INSTALLATION OF FIXTURE/FAN ETC. 130000152 995454 18 Supplying and fixing of call bell/buzzer suitable for DC/AC single phase 230V supply complete as required Each 2 Included 0.00 0 0
31 7000016517 10 10 330 INSTALLATION OF FIXTURE/FAN ETC. 130000255 995454 18 Providing and fixing MV Danger Notice Plate of 200 mm x 150 mm made of mild steel at least 2 mm thick and vitreous enameled white on both sides and with inscription in signal red colour on front side as required. Each 1 Included 0.00 0 0
32 7000016517 10 10 340 EARTHING AND LOOP EARTHING 130000415 995428 18 Earthing with GI earth pipe 4.5 m Long x 40 mm dia including accessories and providing masonry enclosure with cover plate arrangement and watering pipe etc. with charcoal and salt etc. as required. Set 1 Included 0.00 0 0
33 7000016517 10 10 350 EARTHING AND LOOP EARTHING 130000414 995428 18 Providing and fixing 25 mm x 5 mm Copper strip in 40 mm dia GI pipe from earth electrode as required. Mtr. 10 Included 0.00 0 0
34 7000016517 10 10 360 EARTHING AND LOOP EARTHING 130000432 995428 18 Providing and fixing 4 mm dia copper wire on surface/in recess for loop earthing along with the existing surface/recess conduit submain wiring/cable as required. Mtr. 24 Included 0.00 0 0
35 7000016517 60 30 10 TELEPHONE & TV WIRING 995455 18 Supplying and drawing following pair, 0.5 sqmm FR PVC insulated copper conductor, unarmoured telkephone cable in the existing surface/recessed steel/PVC conduit etc as required. KM 2 Included 0.00 0 0
36 7000016517 60 30 20 TELEPHONE & TV WIRING 130000085 995455 18 4 pair Included 0.00 0 0
37 7000016517 60 30 30 TELEPHONE & TV WIRING 130000086 995455 18 Supplying and drawing co axial TV cable RG-6 grade, 0.7 mm solid copper conductor PE insulated, sheilded with fine tinned copper braid and protected with PVC sheath in the existing surface/recessed steel/PVC conduit etc as required. Mtr. 100 Included 0.00 0 0
38 7000016517 60 30 40 TELEPHONE & TV WIRING 995455 18 Supply and fixing following modular switch socket on existing modular plate and switch box including connections but excluding modular plate etc as required. Mtr. 200 Included 0.00 0 0
39 7000016517 190 20 10 TELEPHONE & TV WIRING 130000126 998734 18 Telephone Socket outlet Included 0.00 0 0
40 7000016517 190 20 20 TELEPHONE & TV WIRING 130000127 998734 18 TV Antenna socket outlet Each 10 Included 0.00 0 0
41 7000016517 190 20 30 TELEPHONE & TV WIRING 998734 18 Supply & making INDOOR end termination with brass compression glands & aluminium lugs for the following size of PVC insulated and PVC sheathed aluminium conductor power cable of 1.1 KV grade as required. Each 10 Included 0.00 0 0
42 7000016517 190 20 40 TELEPHONE & TV WIRING 130000521 998734 18 3.5 C x 70 Sqmm Included 0.00 0 0
TELEPHONE & TV WIRING Supply & making outdoor end termination with cast resin compund including aluminium lugs and other jointing materials for following size of PVC insulated and PVC sheathed/XLPE aluminium conductor power cable of 1.1 KV grade as required. Each 4 Included 0.00 0 0 CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS CIVIL WORKS
43 7000016517 190 20 50 TELEPHONE & TV WIRING 130000563 998336 18 4 C X 16 Sqmm Included 0.00 0 0
44 Non scheduled items 170001616 Metering Panel: Supply and installation , testing and commissioning of the Metering Panel .The Panel shall be made out minimum 2.0 mm thick CRCA sheet steel. The internal frame shall be made of structural steel angles / channels. The panel shall be dust and vermin proof dully painted with approved colour of shade. The degree of protection shall not less than IP-52 as per relevant IS code. The sheet steel shroud and partitions shall be of min. 1.6 mm thickness. All sheet steel work forming the exterior of the panel shall be smoothly finished , leveled, having rounded corners andfree from any flaws. Shop drg. Of panel should be approved before fabrication. No. 1 Included 0.00 0 0
45 Non scheduled items METER PANEL Included 0.00 0 0
46 Non scheduled items Incomer Included 0.00 0 0
47 Non scheduled items 100 A TPN MCCB,20KA Included 0.00 0 0
48 Non scheduled items RYB Phase Indicator with selector switch Included 0.00 0 0
49 Non scheduled items Ammeter, Voltmeter with suitable range and arrangement Included 0.00 0 0
50 Non scheduled items 3 phase, 1 no. 10-30/40 A energy meter Included 0.00 0 0
51 Non scheduled items Outgoing: Included 0.00 0 0
52 Non scheduled items 3 Nos. - 63 A TPN MCCB . Included 0.00 0 0
53 Non scheduled items 170002191 Supply, installation, testing and commissioning of Feeder Pillar outdoor suitable for operation on 415V, 50 Hz, 3 phase, 4 wire, AC system capable of withstanding fault level of 20 KA. The panel shall be outdoor, free floor standing, metal clad, powder coated, dust & vermin proof, compartment type enclosure of IP-55 & fabricated out of 2mm thick CRCA sheet steel with necessary bus bar and cable alleys and foundation channel of 100x50x6mm. The incoming and outgoing feeders shall be accommodated in a modular multi-tier arrangement. Painting, earthing, sign writing, numbering shall be complete with foundation channel of 100x50x6mm as per specifications and comprise of the following switchgear and accessories: (Shop drawing to be got approved prior to execution of work). (all accessories should be of reputed make like legrand, schenider, havells etc or make as approved by engineer-in-charge) Set 1 Included 0.00 0 0
54 Non scheduled items INCOMER: Included 0.00 0 0
55 Non scheduled items 1 Sets-100 A, TPN MCCB Included 0.00 0 0
56 Non scheduled items 1 Nos.-Voltmeter 0-500V with selector switch (digital type) Included 0.00 0 0
57 Non scheduled items 1 Sets- Phase indicating lamps. Included 0.00 0 0
58 Non scheduled items BUS-BAR: Included 0.00 0 0
59 Non scheduled items 1 Sets- 100 Amps. TPN Aluminium busbar suitable for 20 KA fault level covered with colour coded PVC sleeves Included 0.00 0 0
60 Non scheduled items OUT-GOINGS: Included 0.00 0 0
61 Non scheduled items Outgoing MCBs/MCCB of the following rating: Included 0.00 0 0
62 Non scheduled items i) 18 No.- 16 Amp.,SP( single phase), MCB Included 0.00 0 0
63 Non scheduled items ii) 1 no. 63 A TPN MCCB , 40 A contactor, 240 V ac coil street light timer (FM/1,QUARTZ, L&T make). Included 0.00 0 0
64 Non scheduled items iii) 1 no. 100 A TPN MCCB having breaking capacity 20KA Included 0.00 0 0
65 SUPPLY/INSTALLATION OF ELECTRICAL FITTINGS Supplying of prewired LED Light Fixtures along with all accessories complete as required (Details as per Technical Specifications): Included 0.00 0 0
66 SUPPLY/INSTALLATION OF ELECTRICAL FITTINGS 100005613 LED1 : LED Tubelight: 22W (for bed room, dormatory, kitchen and other places)- [Make: LHID01020674 HAVELLS or equivalent] Each 20 Included 0.00 0 0
67 SUPPLY/INSTALLATION OF ELECTRICAL FITTINGS 100005613 LED2 : Wall/ Ceiling Mounted LED Fitting for utility purpose: 6W- [Make: LD51-006 WIPRO or equivalent] Each 15 Included 0.00 0 0
68 SUPPLY/INSTALLATION OF ELECTRICAL FITTINGS 100005613 LED-DL : LED downlighter: 10W (for toilets, dress, kitchen, lobby and care taker room)- [Make: LD49-900 WIPRO or equivalent] Each 25 Included 0.00 0 0
69 SUPPLY/INSTALLATION OF ELECTRICAL FITTINGS 100005613 LED-B : Outdoor Bulk head fitting Class LED 10W - [Make: LHEOAOP7UZ6W010 HAVELLS or equivalent] Each 8 Included 0.00 0 0
70 SUPPLY/INSTALLATION OF ELECTRICAL FITTINGS 100005613 LED-DL : Down lighter (for dining and living room): 10 W - [Make: LD49-900 WIPRO or equivalent] Each 10 Included 0.00 0 0
71 SUPPLY/INSTALLATION OF ELECTRICAL FITTINGS 170001618 Supply of decorative bed lamp bracket complete with all accessories including 40W CFL lamp and connection etc as required Each 10 Included 0.00 0 0
72 SUPPLY/INSTALLATION OF ELECTRICAL FITTINGS Supplying of approved make of the following ceiling fan and its all accessories suitable for operation on 230V single phase, 50 Hz AC supply complete as required. (without regulator) Included 0.00 0 0
73 SUPPLY/INSTALLATION OF ELECTRICAL FITTINGS 130000158 1200 mm sweep Each 20 Included 0.00 0 0
74 SUPPLY/INSTALLATION OF ELECTRICAL FITTINGS 100001076 1400 mm sweep Each 10 Included 0.00 0 0
75 SUPPLY/INSTALLATION OF ELECTRICAL FITTINGS Supplying of 230V exhaust fan complete with louver/shutter and its all accessories complete as required of following size. Included 0.00 0 0
76 SUPPLY/INSTALLATION OF ELECTRICAL FITTINGS 170001010 300mm sweep (Light duty) each 10 Included 0.00 0 0
77 SUPPLY/INSTALLATION OF ELECTRICAL FITTINGS 100003494 Supply and installation of 15 Liter Geyser of reputed make with all accessories and necessary connections. each 8 Included 0.00 0 0
78 SUPPLY/INSTALLATION OF ELECTRICAL FITTINGS 100005412 Supply, installation testing and commissioning of 2 T AC of reputed make (Voltas/Samsung/Godrej/LG) with all connections, complete piping, exhuast, stablizer, stand etc complete in all respect. (except industrial socket) Each 11 Included 0.00 0 0
79 SUPPLY/INSTALLATION OF ELECTRICAL FITTINGS 100001466 Supply, delivery, installation, testing, commissioning of 5 HP horizontal Mono submersible pump with cast iron impeller, Chrome steel shaft, having discharge capacity of 10/33/38 m3/hr against total head of 38/27/8 mts from all causes, including supplying and fixing necessary control panel having reputed make relay, indicators etc, non-return valve and gate valve on delivery side, necessary delivery piping upto ground level, electrical wiring from starter panel to pump etc., complete with submersible motor suitable for operation on 400+10percent-15percentvolts, 3phase, 50c/s AC supply. Standard make of KSB/Kirloskar/CGL or any other reputed make. Each 1 Included 0.00 0 0
80 SUPPLY/INSTALLATION OF POLE 100001060 Supply & Installation of 9m A1 Street Lighting pole complete with fixing brackets and junction boxes complete as required (Details as per Technical Specifications): Nos. 10 Included 0.00 0 0
81 SUPPLY/INSTALLATION OF POLE 100001059 Supply & Installation of 4.5m E1 Post top latern pole complete with fixing brackets and junction boxes complete as required (Details as per Technical Specifications): Nos. 10 Included 0.00 0 0
82 SUPPLY/INSTALLATION OF POLE 100001060 Supply & Installation of SC Type fixture for above A1 Type pole: 150 W SON-T Tubular sodium vapour lamp in street lighting luminaire with toughned glass Nos. 10 Included 0.00 0 0
83 SUPPLY/INSTALLATION OF POLE 100001059 Supply & Installation of SF5 Type Fixture for above E1 Type pole: 125 HP MV Lamp in weather proof post top latern for mounting on pole top Nos. 10 Included 0.00 0 0
84 SUPPLY/INSTALLATION OF POLE Supply of aluminium conductor, armored, PVC insulated PVC sheathed, 1.1 KV grade cable conforming to IS:1554 Part-I of the following sizes (Data sheet to be got approved). (Make of cable shall be POWERGRID approved vendor list as available in the website of POWERGRID) Included 0.00 0 0
85 SUPPLY/INSTALLATION OF POLE 100001132 3.5 C x 70 sq.mm Al (PVC) Mtr. 200 Included 0.00 0 0
86 SUPPLY/INSTALLATION OF POLE 100001134 4 C X 16 sq. mm Al (PVC) Mtr. 1000 Included 0.00 0 0
87 7000016517 190 20 60 CIVIL WORKS 120000340 998734 18 2.1.1 EXCAVATION DEPTH UPTO 30CM sqm 194.55 Included 0.00 0 0
88 7000016517 190 20 70 CIVIL WORKS 120000345 998734 18 2.6.1 EXCAVATION IN ALL SOILS D>30CM sqm 1.00 Included 0.00 0 0
89 7000016517 190 20 80 CIVIL WORKS 120000349 998734 18 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. cum 67.00 Included 0.00 0 0
90 7000016517 190 20 90 CIVIL WORKS 120000353 998734 18 2.10.1.1 TRENCH-UPTO 80MM PIPE/CABLE metre 150.00 Included 0.00 0 0
91 CIVIL WORKS 120000355 18 2.10.1.3 TRENCH-300 TO 600MM PIPE/CABLE metre 25.00 Included 0.00 0 0
92 CIVIL WORKS 120000391 18 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. cum 373.380 Included 0.00 0 0
93 CIVIL WORKS 120000392 18 2.26.1 EXTRA-ADDL LIFT 1.5M/PART-ALL cum 1.00 Included 0.00 0 0
94 CIVIL WORKS 120000394 18 2.27 SUPPLY & FILL IN PLINTH JAMUNA SAND cum 31.000 Included 0.00 0 0
95 CIVIL WORKS 120000401 18 2.31CLEAR JUNGLE UPROOT VEGETATION GRASS sqm 1.000 Included 0.00 0 0
96 CIVIL WORKS 120000407 18 2.34.1 SUPPLY OF CHLORPYRIPHOS/LINDANE liter 250.000 Included 0.00 0 0
97 CIVIL WORKS 120000409 18 2.35.2.1 ANTI-TERMITE TREATMENT EXT WALL metre 70.000 Included 0.00 0 0
98 CIVIL WORKS 120000410 18 2.35.3.1 ANTI-TERMITE TREATMENT UNDER FL sqm 300.000 Included 0.00 0 0
99 7000016517 190 20 100 CIVIL WORKS 120000437 998336 18 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1: 2: 4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) cum 1.000 Included 0.00 0 0
100 7000016517 190 20 110 CIVIL WORKS 120000439 998336 18 4.1.5 CC 1:3:6 <PL COARSE SAND 20MM AGGR cum 5 Included 0.00 0 0
101 7000016517 190 20 120 CIVIL WORKS 120000442 998336 18 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1: 4: 8 (1 Cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size) cum 81.250 Included 0.00 0 0
102 7000016517 360 50 10 CIVIL WORKS 120000456 998734 18 4.3.1 FORM WORK FOUNDATIONS FOOTINGS ETC sqm 8.890 Included 0.00 0 0
103 7000016517 360 50 20 CIVIL WORKS 120000464 998734 18 Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), including the cost of required centering, shuttering complete. 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). cum 5.000 Included 0.00 0 0
104 7000016517 360 50 30 CIVIL WORKS 120000472 998734 18 Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer's specification. per bag of 50KG 53.660 Included 0.00 0 0
105 7000016517 360 50 40 CIVIL WORKS 120000477 998336 18 Making plinth protection 50 mm thick of cement concrete 1: 3: 6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including finishing the top smooth. sqm 31.000 Included 0.00 0 0
106 7000016517 360 50 50 CIVIL WORKS 120000563 998336 18 Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level: Concrete of M25 grade with minimum cement content of 330 kg /cum cum 34.310 Included 0.00 0 0
107 7000016517 360 50 60 CIVIL WORKS 120000564 998734 18 Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works above plinth level upto floor V level: Concrete of M25 grade with minimum cement content of 330 kg /cum cum 85.544 Included 0.00 0 0
108 7000016517 410 20 10 CIVIL WORKS 120000499 998713 18 Centering and shuttering including strutting, propping etc and removal of form for: Foundations, footings, bases of columns, etc for mass concrete sqm 77.070 Included 0.00 0 0
109 7000016517 410 20 20 CIVIL WORKS 120000501 998734 18 Centering and shuttering including strutting, propping etc and removal of form for: Suspended floors, roofs, landings, balconies and access platform sqm 148.564 Included 0.00 0 0
110 7000016517 410 20 30 CIVIL WORKS 120000503 998713 18 5.9.5 FORM WORK FOR LINTEL, BEAM, GIRDER sqm 424.287 Included 0.00 0 0
111 7000016517 410 20 40 CIVIL WORKS 120000504 998713 18 5.9.6 FORM WORK FOR COLUMN, PILLAR, PIER sqm 17.890 Included 0.00 0 0
112 7000016517 410 20 50 CIVIL WORKS 120000505 998734 18 5.9.7 FORM WORK FOR STAIRS sqm 10.000 Included 0.00 0 0
113 7000016517 1830 1120 10 CIVIL WORKS 120000513 998736 18 5.9.15 FORM WORK FOR LINTELS <1.5M SPAN sqm 15.000 Included 0.00 0 0
114 7000016517 1830 1120 20 CIVIL WORKS 120000514 998736 18 5.9.16.1 FORM WORK FOR EDGES OF SLABS metre 60.000 Included 0.00 0 0
115 7000016517 1840 1290 10 CIVIL WORKS 120000518 998736 18 5.9.19 FORMWORK FOR SHADE CHAJJAS CRBLS sqm 52.000 Included 0.00 0 0
116 7000016517 1840 1290 20 CIVIL WORKS 120000543 998736 18 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete for all level. Thermo-Mechanically Treated bars kg 16,672.450 Included 0.00 0 0
117 7000016517 1840 1290 30 CIVIL WORKS 120000560 998736 18 Add for plaster drip course/ groove in plastered surface or moulding to R.C.C. projections. metre 128.000 Included 0.00 0 0
118 7000016517 1840 1290 40 CIVIL WORKS 120000601 998736 18 6.1.2 BW CD7.5 NM BRICKS <PLINTH CM1:6 cum 1 Included 0.00 0 0
119 7000016517 1840 1290 50 CIVIL WORKS 120000607 998736 18 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in: Cement mortar 1: 6 (1 cement: 6 coarse sand) cum 14.380 Included 0.00 0 0
120 7000016517 1840 1290 60 CIVIL WORKS 120000616 998736 18 6.12.2 HALF BM IN FDN&PLINTH CD7.5 CM1:4 sqm 52.000 Included 0.00 0 0
121 7000016517 1840 1290 70 CIVIL WORKS 120000618 998736 18 Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1: 4 (1 cement: 4 coarse sand) sqm 267.630 Included 0.00 0 0
122 7000016517 1840 1290 80 CIVIL WORKS 130000448 998736 18 Extra for providing and placing in position 2 Nos 6mm dia. M.S. bars at every third course of half brick masonry. sqm 261.630 Included 0.00 0 0
123 7000016517 1840 1290 90 CIVIL WORKS 120000739 998736 18 Providing and fixing 18mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for floors, kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20mm thick base cement mortar 1: 4 (1 cement: 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc complete at all levels: Granite of any colour and shade: for all size of slab Area of slab over 0.50 sqm sqm 66.000 Included 0.00 0 0
124 7000016517 1840 1290 100 CIVIL WORKS 120000743 998736 18 Extra for providing opening of required size & shape for wash basin/ kitchen sink in kitchen platform, vanity counter and similar location in marble/Granite/stone work, including necessary holes for pillar taps etc including moulding, rubbing and polishing of cut edges etc complete. each 5 Included 0.00 0 0
125 7000016517 1840 1290 110 CIVIL WORKS 120002723 998734 18 Constructing brick masonry road gully chamber 45x45x77.5 cm with bricks in cement mortar 1: 4 (1 cement: 4 coarse sand) with pre- cast R.C.C. vertical grating complete as per standard design: With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 Each 25 Included 0.00 0 0
126 7000016517 1850 1310 10 CIVIL WORKS 120000944 998734 18 Providing and fixing bright finished brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc complete. each 16 Included 0.00 0 0
127 7000016517 1850 1310 20 CIVIL WORKS 120000948 998736 18 Providing and fixing special quality bright finished brass cupboard or ward robe locks with four levers of approved quality including necessary screws etc Complete: 50 mm each 7 Included 0.00 0 0
128 7000016517 1850 1310 30 CIVIL WORKS 120000952 998736 18 Providing and fixing bright finished brass handles with screws etc complete: 125 mm each 4 Included 0.00 0 0
129 7000016517 1850 1310 40 CIVIL WORKS 120000953 998736 18 Providing and fixing bright finished brass handles with screws etc complete: 100 mm each 12 Included 0.00 0 0
130 7000016517 1850 1310 50 CIVIL WORKS 120000957 998736 18 Providing and fixing aluminium extruded section body tubular type universal hydraulic door closer (having brand logo with ISI, IS: 3564, embossed on the body, door weight upto 36 kg to 80 kg and door width from 701 mm to 1000 mm), with double speed adjustment with necessary accessories and screws etc complete. each 16 Included 0.00 0 0
131 7000016517 1850 1310 60 CIVIL WORKS 120000987 998736 18 Providing and fixing aluminium sliding door bolts, ISI marked anodised (anodic coating not less than grade AC 10 as per IS: 1868), transparent or dyed to required colour or shade, with nuts and screws etc complete: 300x16 mm each 2 Included 0.00 0 0
132 7000016517 1850 1310 70 CIVIL WORKS 120000988 998736 18 Providing and fixing aluminium sliding door bolts, ISI marked anodised (anodic coating not less than grade AC 10 as per IS: 1868), transparent or dyed to required colour or shade, with nuts and screws etc complete: 250x16 mm each 9 Included 0.00 0 0
133 7000016517 1860 1340 10 CIVIL WORKS 120000992 998736 18 Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS: 1868) transparent or dyed to required colour or shade, with necessary screws etc complete: 150x10 mm each 273 Included 0.00 0 0
134 7000016517 1860 1340 20 CIVIL WORKS 120000993 998736 18 Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS: 1868) transparent or dyed to required colour or shade, with necessary screws etc complete: 100x10 mm each 306 Included 0.00 0 0
135 7000016517 1860 1340 30 CIVIL WORKS 120000997 998736 18 Providing and fixing aluminium handles, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS: 1868) transparent or dyed to required colour or shade, with necessary screws etc complete: 100 mm each 246 Included 0.00 0 0
136 7000016517 1860 1340 40 CIVIL WORKS 120001000 998736 18 Providing and fixing aluminium hanging floor door stopper, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS: 1868) transparent or dyed to required colour and shade, with necessary screws etc complete: Twin rubber stopper each 43 Included 0.00 0 0
137 7000016517 1860 1340 50 CIVIL WORKS 120001046 998736 18 Providing and fixing factory made shutters of Pre-laminated particle board flat pressed three layer or graded wood particle board with one side decorative finish and other side balancing lamination conforming to IS: 12823 Grade l Type ll, of approved design, and edges sealed with water resistant paint and lipped with aluminium ‘U’ type edge beading allround the shutter, including fixing with angle cleat, grip strip, cadmium plated steel screws, including fixing of aluminium hinges 100x63x4 mm etc. complete as per architectural drawing and direction of Engineer-in-Charge (Cost of ‘U’ beading and hinges will be paid for separately): 25 mm thick sqm 50 Included 0.00 0 0
138 7000016517 1860 1340 60 CIVIL WORKS 120001047 998736 18 Providing and fixing aluminum U beading of required size to Pre-laminated/ flush door shutter, including fixing etc. complete as per direction of Engineer-in-charge. kg 40 Included 0.00 0 0
139 7000016517 1860 1340 70 CIVIL WORKS 120001147 998736 18 Providing and fixing circular/ Hexagonal cast iron or M.S. sheet box for ceiling fan clamp, of internal dia 140 mm, 73 mm height, top lid of 1.5 mm thick M.S. sheet with its top surface hacked for proper bonding, top lid shall be screwed into the cast iron/ M.S. sheet box by means of 3.3 mm dia round headed screws, one lock at the corners. Clamp shall be made of 12 mm dia M.S. bar bent to shape as per standard drawing. each 15 Included 0.00 0 0
140 7000016517 1870 1390 10 CIVIL WORKS 120001153 998736 18 Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works kg 702 Included 0.00 0 0
141 7000016517 1870 1390 20 CIVIL WORKS 120001170 998736 18 11.3.1 Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate sqm 24.000 Included 0.00 0 0
142 7000016517 1880 1400 10 CIVIL WORKS 120001229 998731 18 Extra for pre finished nosing to treads of steps of marble stone meter 73.000 Included 0.00 0 0
143 7000016517 1880 1400 20 CIVIL WORKS 120001230 998731 18 Extra for marble stone flooring in treads of steps and risers using single length up to 2.00 metre. sqm 24.000 Included 0.00 0 0
144 7000016517 1880 1400 30 CIVIL WORKS 120003081 998731 18 Providing and fixing 1st quality ceramic glazed floor tiles conforming to IS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm including pointing in white cement mixed with pigment of matching shade complete. sqm 139 Included 0.00 0 0
145 7000016517 1880 1400 40 CIVIL WORKS 120001246 998731 18 Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., complete sqm 51 Included 0.00 0 0
146 7000016517 1880 1400 50 CIVIL WORKS 120001251 998731 18 Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600x600 mm Sqm 517 Included 0.00 0 0
147 7000016517 1880 1400 60 CIVIL WORKS 120001318 998736 18 Providing gola 75x75 mm in cement concrete 1: 2: 4 (1 cement: 2 coarse sand: 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1: 3 (1 cement: 3 fine sand) as per standard design: In 75x75 mm deep chase metre 130 Included 0.00 0 0
148 7000016517 1880 1400 70 CIVIL WORKS 120001318 998736 18 Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipess: 75mm diameter metre 140 Included 0.00 0 0
149 7000016517 1890 1401 10 CIVIL WORKS 120001319 998731 18 Providing and fixing on wall face unplasticised Rigid PVC rain water pipes including coupler conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion, (i) Single socketed pipes: 110mm diameter metre 50 Included 0.00 0 0
150 7000016517 1890 1401 20 CIVIL WORKS 120001355 998731 18 Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion: Single pushfit Coupler: 110mm each 10 Included 0.00 0 0
151 7000016517 1890 1401 30 CIVIL WORKS 120001356 998731 18 Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion: Single tee with door: 75x75x75mm each 10 Included 0.00 0 0
152 7000016517 1890 1401 40 CIVIL WORKS 120001357 998731 18 Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion: Single tee with door: 110x110x110mm each 10 Included 0.00 0 0
153 7000016517 1890 1401 50 CIVIL WORKS 120001359 998731 18 Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion: Single tee without door: 110x110x110mm each 10 Included 0.00 0 0
154 7000016517 1900 1410 10 CIVIL WORKS 120001360 998731 18 Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion: Bend 87.5°: 75mm bend each 10 Included 0.00 0 0
155 7000016517 1900 1410 20 CIVIL WORKS 120001361 998731 18 Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion: Bend 87.5°: 110mm bend each 10 Included 0.00 0 0
156 7000016517 1900 1410 30 CIVIL WORKS 120001362 998731 18 Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion: Shoe (Plain): 75mm Shoe each 10 Included 0.00 0 0
157 7000016517 1900 1410 40 CIVIL WORKS 120001363 998731 18 Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion: Shoe (Plain): 110mm Shoe each 10 Included 0.00 0 0
158 7000016517 1900 1410 50 CIVIL WORKS 120001364 998731 18 Providing and fixing unplasticised -PVC pipe clips of approved design to unplasticised - PVC rain water pipes by means of 50x50x50mm hard wood plugs, screwed with M.S. screws of required length, including cutting brick work and fixing in cement mortar 1: 4 (1 cement: 4 coarse sand) and making good the wall etc complete: 75mm each 25 Included 0.00 0 0
159 7000016517 1910 1421 10 CIVIL WORKS 120001365 998731 18 Providing and fixing unplasticised -PVC pipe clips of approved design to unplasticised - PVC rain water pipes by means of 50x50x50mm hard wood plugs, screwed with M.S. screws of required length, including cutting brick work and fixing in cement mortar 1: 4 (1 cement: 4 coarse sand) and making good the wall etc complete: 110mm each 25 Included 0.00 0 0
160 7000016517 1910 1421 20 CIVIL WORKS 120001366 998731 18 Providing and fixing to the inlet mouth of rain water pipe cast iron grating 15cm diameter and weighing not less than 440 grams. each 10 Included 0.00 0 0
161 7000016517 1910 1421 30 CIVIL WORKS 120001368 998731 18 Providing and fixing false ceiling at all height including providing and fixing of frame work made of special sections, power pressed from M.S. sheets and galvanized with zinc coating of 120 gms/sqm (both side inclusive) as per IS : 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and 37mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x 50mm long with 6mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each having lips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I. wire at every junction, including fixing perimeter channels 0.5 mm thick 27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre, with 25mm long dry wall screws @ 230 mm interval, including fixing of gypsum board to ceiling section and perimeter channel with the help of dry wall screws of size 3.5 x 25 mm at 230 mm c/c, including jointing and finishing to a flush finish of tapered and square edges of the board with recomme-nded jointing compound , jointing tapes , finishing with jointing compound in 3 layers covering upto 150 mm on both sides of joint and two coats of primer suitable for board, all as per manufacturer’s specification and also including the cost of making openings for light fittings, grills, diffusers, cutouts made with frame of perimeter channels suitably fixed, all complete as per drawings, specification and direction of the Engineer in Charge but excluding the cost of painting with : 12.5 mm thick tapered edge gypsum fire resistant board conforming to IS: 2095- Part I sqm 360 Included 0.00 0 0
162 7000016517 1920 1430 10 CIVIL WORKS 120001406 998731 18 12mm cement plaster of mix: 1: 6 (1 cement: 6 coarse sand) sqm 1 Included 0.00 0 0
163 7000016517 1930 1433 10 CIVIL WORKS 120001408 998731 18 15mm cement plaster on rough side of single or half brick wall of mix: 1: 6 (1 cement: 6 coarse sand) sqm 873.59 Included 0.00 0 0
164 7000016517 1930 1433 20 CIVIL WORKS 120001411 998731 18 12 mm cement plaster finished with a floating coat of neat cement of mix: 1: 3 (1 cement: 3 fine sand) sqm 550 Included 0.00 0 0
165 7000016517 1930 1433 30 CIVIL WORKS 120001423 998731 18 6mm cement plaster to ceiling of mix: 1:3 (1 cement : 3 find sand) sqm 352.12 Included 0.00 0 0
166 7000016517 1940 1451 10 CIVIL WORKS 120001437 998731 18 Providing and applying plaster of paris putty of 2mm thickness over plastered surface to prepare the surface even and smooth complete. sqm 1718 Included 0.00 0 0
167 7000016517 1950 1452 10 CIVIL WORKS 120001461 998736 18 Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade: New work (two or more coats) over and including water thinnable priming coat with cement primer sqm 1361 Included 0.00 0 0
168 7000016517 1950 1452 20 CIVIL WORKS 120001467 998736 18 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) sqm 912 Included 0.00 0 0
169 7000016517 1960 1460 10 CIVIL WORKS 120001491 998736 18 Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture sqm 221 Included 0.00 0 0
170 7000016517 1960 1460 20 CIVIL WORKS 120001732 998736 18 Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5cm depth, dressing to camber and consolidating with road roller including making good the undulations etc and re-rolling the sub grade and disposal of surplus earth with lead upto 50metres. sqm 26.875 Included 0.00 0 0
171 7000016517 1960 1460 30 CIVIL WORKS 120001734 998736 18 Supplying and stacking at site: 90mm to 45mm size stone aggregate cum 12.688 Included 0.00 0 0
172 7000016517 1960 1460 40 CIVIL WORKS 120001735 998736 18 Supplying and stacking at site: 63mm to 45mm size stone aggregate cum 12.688 Included 0.00 0 0
173 7000016517 1960 1460 50 CIVIL WORKS 120001736 998736 18 Supplying and stacking at site: 53mm to 22.4mm size stone aggregate cum 12.688 Included 0.00 0 0
174 7000016517 1970 1470 10 CIVIL WORKS 120001744 998736 18 Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. cum 82.688 Included 0.00 0 0
175 7000016517 1970 1470 20 CIVIL WORKS 120001802 998736 18 Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately). Note:- Cement content considered in M-25 is @ 400 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately. Cement concrete prepared with batch mixing machine cum 40 Included 0.00 0 0
176 7000016517 1970 1470 30 CIVIL WORKS 100004492 998736 18 Providing and fixing in position pre-moulded joint filler in expansion joints. per cm depth per cm width per m length 400 Included 0.00 0 0
177 7000016517 1970 1470 40 CIVIL WORKS 100004494 998736 18 Providing and laying in position bitumen hot sealing compound for expansion joints etc Using grade 'A' sealing compound. per cm depth per cm width per m length 275 Included 0.00 0 0
178 7000016517 1980 1490 10 CIVIL WORKS 120001870 998736 18 Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS: 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: W.C. pan with ISI marked white solid plastic seat and lid each 8 Included 0.00 0 0
179 7000016517 1980 1490 20 CIVIL WORKS 120001888 998736 18 Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Wash basin size 550x400 mm with a pair of 15 mm C.P. brass pillar taps each 8 Included 0.00 0 0
180 7000016517 1990 1513 10 CIVIL WORKS 120001899 998736 18 Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS: 13983 with C.I. brackets and stainless steel plug 40 mm, including painting of fittings and brackets, cutting and making good the walls wherever required: Kitchen sink with drain board: 510x1040 mm bowl depth 250 mm each 1 Included 0.00 0 0
181 7000016517 1990 1513 20 CIVIL WORKS 120001937 998736 18 Providing and fixing PVC waste pipe for sink or wash basin including PVC waste fittings complete: Flexible pipe: 32 mm dia each 9 Included 0.00 0 0
182 7000016517 1990 1513 30 CIVIL WORKS 120001939 998736 18 Providing and fixing 100 mm SS grating for gully, floor or Nahani trap each 25 Included 0.00 0 0
183 7000016517 1990 1513 40 CIVIL WORKS 120001941 998736 18 Providing and fixing 600x450mm bevelled edge mirror of superior glass (of approved quality) complete with 6mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete. each 8 Included 0.00 0 0
184 7000016517 1990 1513 50 CIVIL WORKS 120002055 998736 18 Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with CP brass screws with concealed fitting arrangement of approved quality colour and make ("Prayag or equivalent): 600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 gms each 8 Included 0.00 0 0
185 7000016517 2000 1520 10 CIVIL WORKS 120002122 998731 18 Providing and fixing G.I. Pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc. (internal work): Exposed on wall: 15mm dia nominal bore. metre 4 Included 0.00 0 0
186 7000016517 2010 1530 10 CIVIL WORKS 120002123 998734 18 Providing and fixing G.I. Pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc. (internal work): Exposed on wall: 20mm dia nominal bore. metre 79 Included 0.00 0 0
187 7000016517 2020 1590 10 CIVIL WORKS 120002124 998736 18 Providing and fixing G.I. Pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc. (internal work): Exposed on wall: 25mm dia nominal bore. metre 62 Included 0.00 0 0
188 7000016517 2020 1590 20 CIVIL WORKS 120002128 998736 18 Providing and fixing G.I. Pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc. (internal work) : Concealed pipe including painting with anti-corrosive bitumastic paint, cutting chases and making good the wall: 15 mm dia nominal bore metre 139 Included 0.00 0 0
189 7000016517 2020 1590 30 CIVIL WORKS 120002132 998736 18 Providing and fixing G.I. Pipes complete with G.I. Fittings including trenching and refilling etc. (external work): 25mm dia. nominal bore metre 6 Included 0.00 0 0
190 7000016517 2030 1600 10 CIVIL WORKS 120002145 995463 18 Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end): 25mm nominal bore each 5 Included 0.00 0 0
191 7000016517 2030 1600 20 CIVIL WORKS 120002153 995463 18 Providing and fixing ball valve (brass) of approved quality complete. High or low pressure with plastic floats: 25mm nominal bore each 3 Included 0.00 0 0
192 7000016517 2040 1610 10 CIVIL WORKS 120002174 998736 18 Providing and fixing C.P. brass shower rose with 15 to 20mm inlet. 150mm diameter each 5 Included 0.00 0 0
193 7000016517 2040 1610 20 CIVIL WORKS 120002228 998736 18 Constructing masonry Chamber 30x30x50 cm inside, in brick work in cement mortar 1:4 (1 cement :4 coarse sand) for stop cock, with C. I. surface box 100x100 x75 mm (inside) with hinged cover fixed in cement concrete slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), i/c necessary excavation, foundation concrete 1:5:10 ( 1 cement : 5 fine sand : 10 graded stone aggregate 40mm nominal size ) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12mm thick, finished with a floating coat of neat cement complete as per standard design : With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 each 2 Included 0.00 0 0
194 7000016517 2040 1610 30 CIVIL WORKS 120002229 998736 18 Constructing masonry Chamber 60x60x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve, with C.I. surface box 100mm top diameter, 160 mm bottom diameter and 180 mm deep ( inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size ) , i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design : With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 each 2 Included 0.00 0 0
195 7000016517 2040 1610 40 CIVIL WORKS 120002234 998736 18 Painting G.I. pipes and fittings with synthetic enamel white paint over a ready mixed priming coat, both of approved quality for new work: 15mm diameter pipe metre 4 Included 0.00 0 0
196 7000016517 2040 1610 50 CIVIL WORKS 120002235 995461 18 Painting G.I. pipes and fittings with synthetic enamel white paint over a ready mixed priming coat, both of approved quality for new work: 20mm diameter pipe metre 79 Included 0.00 0 0
197 7000016517 2040 1610 60 CIVIL WORKS 120002236 995461 18 Painting G.I. pipes and fittings with synthetic enamel white paint over a ready mixed priming coat, both of approved quality for new work: 25mm diameter pipe metre 62 Included 0.00 0 0
198 7000016517 2040 1610 70 CIVIL WORKS 120002286 995461 18 Providing and placing on terrace (at all floor levels) polyethylene water storage tank, ISI : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. per litre 3500 Included 0.00 0 0
199 7000016517 2050 1620 10 CIVIL WORKS 120002287 998739 18 Providing and fixing C.P. brass bib cock of approved quality conforming to IS:8931: 15mm nominal bore each 28 Included 0.00 0 0
200 7000016517 2050 1620 20 CIVIL WORKS 120002291 998739 18 Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931: 15mm nominal bore each 48 Included 0.00 0 0
201 7000016517 2050 1620 30 CIVIL WORKS 120002402 998731 18 Providing and fixing PTMT extension Nipples for water tank pipe, fittings of approved quality and colour: 25 mm nominal bore and weighing not less than 62 gms. each 8 Included 0.00 0 0
202 7000016517 2050 1620 40 CIVIL WORKS 120002623 998731 18 Providing laying and jointing glazed stoneware pipes grade A with stiff mixture of cement mortar in the proportion of 1:1 (1 cement : 1 fine sand) including testing of joints etc. complete: 100mm dia. metre 16 Included 0.00 0 0
203 7000016517 2050 1620 50 CIVIL WORKS 120002624 998739 18 Providing laying and jointing glazed stoneware pipes grade A with stiff mixture of cement mortar in the proportion of 1:1 (1 cement : 1 fine sand) including testing of joints etc. complete: 150mm dia. metre 109 Included 0.00 0 0
204 7000016517 2050 1620 60 CIVIL WORKS 120002629 995461 18 Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40mm nominal size) alround SW pipes including bed concrete as per standard design: 100mm diameter SW pipe metre 16 Included 0.00 0 0
205 7000016517 2060 1640 10 CIVIL WORKS 120002630 995455 18 Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40mm nominal size) alround SW pipes including bed concrete as per standard design: 150mm diameter SW pipe metre 109 Included 0.00 0 0
206 7000016517 2060 1640 20 CIVIL WORKS 120002642 995455 18 Providing and fixing square-mouth S.W. gully trap class SP-1 complete with C.I. grating brick masonry chamber with water tight C.I. cover with frame of 300 x300 mm size (inside) the weight of cover to be not less than 4.50 kg and frame to be not less than 2.70 kg as per standard design: 180x150 mm size P type : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 each 5 Included 0.00 0 0
207 7000016517 2060 1640 30 CIVIL WORKS 120002665 995455 18 Constructing brick masonry manhole in cement mortar 1: 4 (1 cement: 4 coarse sand) with R.C.C. top slab with 1: 2: 4 mix (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size), foundation concrete 1: 4: 8 mix (1 cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1: 3 (1 cement: 3 coarse sand) finished with floating coat of neat cement and making channels in cement concrete 1: 2: 4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement complete as per standard design: Inside size 90x80 cm and 45 cm deep including C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover and frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg): With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 each 10 Included 0.00 0 0
208 7000016517 2060 1640 40 CIVIL WORKS 120002671 995455 18 Extra for depth for manholes: Size 90x80cm:With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 metre 2 Included 0.00 0 0
209 7000016517 2060 1640 50 CIVIL WORKS 120002731 995455 18 Making soak pit 2.5 m diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shaft with bricks and S.W. drain pipe 100 mm diameter, 1.8 m long complete as per standard design. : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 each 2 Included 0.00 0 0
210 7000016517 2060 1640 60 CIVIL WORKS 120002791 995455 18 Providing and fixing aluminium work for doors, windows, ventilators andpartitions with extruded built up standard tubular sections/ appropriate Zsections and other sections of approved make conforming to IS: 733 andIS: 1285, fixing with dash fasteners of required dia and size, includingnecessary filling up the gaps at junctions, i.e. at top, bottom and sideswith required EPDM rubber/ neoprene gasket etc. Aluminium sectionsshall be smooth, rust free, straight, mitred and jointed mechanicallywherever required including cleat angle, Aluminium snap beading forglazing / paneling, C.P. brass / stainless steel screws, all complete as perarchitectural drawings and the directions of Engineer-in-charge. (Glazing,paneling and dash fasteners to be paid for separately) : For fixed portionPowder coated aluminium (minimum thickness of powdercoating 50 micron) kg 1300 Included 0.00 0 0
211 7000016517 2060 1640 70 CIVIL WORKS 120002794 995455 18 Providing and fixing aluminium work for doors, windows, ventilators andpartitions with extruded built up standard tubular sections/ appropriate Zsections and other sections of approved make conforming to IS: 733 andIS: 1285, fixing with dash fasteners of required dia and size, includingnecessary filling up the gaps at junctions, i.e. at top, bottom and sideswith required EPDM rubber/ neoprene gasket etc. Aluminium sectionsshall be smooth, rust free, straight, mitred and jointed mechanicallywherever required including cleat angle, Aluminium snap beading forglazing / paneling, C.P. brass / stainless steel screws, all complete as perarchitectural drawings and the directions of Engineer-in-charge. (Glazing,paneling and dash fasteners to be paid for separately) : For shutters of doors, windows & ventilators including providingand fixing hinges/ pivots and making provision for fixing offittings wherever required including the cost of EPDM rubber /neoprene gasket required (Fittings shall be paid for separately) Powder coated aluminium (minimum thickness of powdercoating 50 micron) kg 600 Included 0.00 0 0
212 7000016517 2070 1660 10 CIVIL WORKS 120002799 995455 18 Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc with EPDM rubber / neoprene gasket etc complete as per the architectural drawings and the directions of engineer-in-charge. (Cost of aluminium snap beading shall be paid in basic item): With float glass panes of 5.50 mm thickness SQM 95 Included 0.00 0 0
213 7000016517 2070 1660 20 CIVIL WORKS 120002807 995455 18 Filling the gap in between aluminium frame & adjacent RCC/ Brick/ Stone work by providing weather silicon sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete: Upto 5mm depth and 5 mm width metre 150 Included 0.00 0 0
214 7000016517 2070 1660 30 CIVIL WORKS 120002835 995455 18 Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with Armourcrete of M/s The Structural Water Proofing Company Pvt. Ltd. or Tapecrete of M/s CICO Engg. Service or equivalent consisting of applying: a) First layer of slurry of cement @ 0.488 kg/sqm mixed withwater proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours. (b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry sqm 37 Included 0.00 0 0
215 7000016517 2070 1660 40 CIVIL WORKS 120002837 995455 18 Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations: sqm 349 Included 0.00 0 0
216 7000016517 2070 1660 50 CIVIL WORKS 170001613 995455 18 P/F CP BRASS TRAP FOR SINK ETC ALL SIZES each 3 Included 0.00 0 0
217 7000016517 2070 1660 60 CIVIL WORKS 170000774 995455 18 Providing and fixing wooden moulded beading to door and window frames with iron screws, plugs and priming coat on unexposed surface etc complete: 2nd class teak wood: 20x20mm metre 327 Included 0.00 0 0
218 7000016517 2070 1660 70 CIVIL WORKS 170001612 995455 18 Providing and erecting railing in stainless steel with handrail out of 50 mm dia stainless steel medium hollow pipe and 25 mm dia vertical medium hollow pipes at a spacing of 200 mm c/c with 40 X 6 S.S continuous straps to be fixed to R.C.C Padadis and also at 0.6 m level. The total height of the railing shall be 80 cms above the R.C.C. metre 50 Included 0.00 0 0
219 7000016517 2080 1680 10 CIVIL WORKS 170001614 995455 18 Providing and fixing brass ferrule with C.I. mouth cover including boring and tapping the main. 40mm nominal bore each 4 Included 0.00 0 0
220 7000016517 2080 1680 20 CIVIL WORKS 170001862 995455 18 POP Cornices to False Ceiling ( 3" ): Providing and erecting in position P O P cornices to the false ceiling. Rmt. 50 Included 0.00 0 0
Total Installation Charges 0.00 0
Total GST as confirmed by Bidder 0.00
* In case the bidder leaves the cell for confirmation of the SAC and/or GST rate “blank”, the SAC and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Place : Printed Name :
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566 Schedule - 3
Construction of balance work of Transit camp at POWERGRID Jaipur south substation As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES : ERECTION CHARGES) AS per Percent #REF!
As per lum-sum on Sch-3 0.00%
Bidder’s Name and Address (Lead Partner) : To: As per Percent on Sch-3 #REF!
Power Grid Corporation of India Limited Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
…….. …….. …….. …….. …….. …….. Faridabad-121002, Haryana Multipackage lum-sum 0.00%
All Prices are in Indian Rupees. Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
SI. No. Description Unit Quantity Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! (a) Detailed Soil Investigation
#REF! #REF! #REF! #REF! #REF! (b) All kinds of soil except fissured rock & hard rock
#REF! #REF! #REF! #REF! #REF! (e) River Crossing Location
#REF! #REF! #REF! #REF! #REF! (f)
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
Total Erection Price (A+B) #REF!
Place : Printed Name :
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566 Schedule - 4
Construction of balance work of Transit camp at POWERGRID Jaipur south substation
(SCHEDULE OF RATES AND PRICES )
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Training Charges for Training to be imparted
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column '8’ is confirmed. If not indicate applicable the SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Training Charges excluding GST Total Training Charges excluding GST Total GST as confirmed by Bidder
Revaluation of J column Tax Calculation
NOT APPLICABLE Revaluation of J column Tax Calculation
Included 0.00 0 0
Total Training Charges 0.00 0
Total GST as confirmed by Bidder 0.00
Date : -- Printed Name :
Place : Designation :
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566 Schedule - 4b
Construction of balance work of Transit camp at POWERGRID Jaipur south substation
(SCHEDULE OF RATES AND PRICES )
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Maintenance Charges during & after Defect Laibility Period
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column '8’ is confirmed. If not indicate applicable the SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Maintenance Charges excluding GST Total Maintenance Charges excluding GST Total GST as confirmed by Bidder
0 Revaluation of P column Tax Calculation
A. #REF! Revaluation of P column Tax Calculation
1 Included 0.00 0 0
2 Included 0.00 0 0
3 Included 0.00 0 0
4 Included 0.00 0 0
B. #REF! Revaluation of P column Tax Calculation
1 Included 0.00 0 0
2 Included 0.00 0 0
3 Included 0.00 0 0
4 Included 0.00 0 0
Total Maintenance Charges during and after Defect Liabilty Period 0.00 0
Total GST as confirmed by Bidder 0.00
Date : -- Printed Name :
Place : Designation :
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566 Schedule - 5
Construction of balance work of Transit camp at POWERGRID Jaipur south substation
(SUMMARY OF TAXES & DUTIES APPLICABLE ON PLANT & EQUIPMENT)
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Sl. No. Item Nos. Total Price (INR) After Discount After MPDiscount
1 TOTAL GST ON GOODS Excise Duty #REF! Excise Duty #REF!
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable. 0.00
2 TOTAL GST ON SERVICES Sales Tax 0.00 Sales Tax 0.00
Total GST on Installation Services (Schedule-3), Training to be imparted in India (Schedule-4) 0.00 #REF! 0 #REF! 0
GRAND TOTAL [1+2] 0.00 Grand Total after Discount #REF! Grand Total after MPD #REF!
Date : -- Printed Name :
Place : Designation :
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566 Schedule - 5
Construction of balance work of Transit camp at POWERGRID Jaipur south substation
SUMMARY OF TAXES & DUTIES APPLICABLE ON GOODS
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Sl. No. Item Nos. Total Price (INR)
1 TOTAL GST ON GOODS 0.00
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable.
2 TOTAL GST ON SERVICES 0.00
Total GST on Installation Services (Schedule-3), Training to be imparted in India (Schedule-4a) and Maintenance Charges during and after Defect Liabilty Period (Schedule-4b)
GRAND TOTAL [1+2] 0.00
Date : -- Printed Name :
Place : Designation :
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566 Schedule - 6
Construction of balance work of Transit camp at POWERGRID Jaipur south substation
(GRAND SUMMARY)
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, In-transit Insurance, loading & unloading
3 TOTAL SCHEDULE NO. 3 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 0.00
Training Charges
4b TOTAL SCHEDULE NO. 4b 0.00
Maintenance Charges during & after Defect Laibility Period
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 7 0.00
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+4+5] 0.00
Date : -- Printed Name :
Place : Designation :
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566 Schedule - 6 After Discount
Construction of balance work of Transit camp at POWERGRID Jaipur south substation
(GRAND SUMMARY)
Bidder’s Name and Address (Lead Partner) : To:
Power Grid Corporation of India Limited
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, In-transit Insurance, loading & unloading
3 TOTAL SCHEDULE NO. 3 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 0.00
Training Charges
4b TOTAL SCHEDULE NO. 4b 0.00
Maintenance Charges during & after Defect Laibility Period
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 7 0.00
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+4+5] 0.00
Date : -- Printed Name :
Place : Designation :
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566 Schedule 7
Construction of balance work of Transit camp at POWERGRID Jaipur south substation As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-7 0.00%
Bidder’s Name and Address (Lead Partner) : To: As per Percent on Sch-7 #REF!
Power Grid Corporation of India Limited Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
…….. …….. …….. …….. …….. …….. Faridabad-121002, Haryana Multipackage Discount 0.0000%
Type tests Charges:
SL. NO. PR No Line Item No Code HSN Code Whether HSN in column ‘2’ is confirmed. If not indicate applicable the HSN code * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description of Test Unit Quantity Unit Test Charge Total Test Charges (Rs.) Total GST as confirmed by Bidder Revaluation of M column Tax Calculation Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
1 Included 0.00 0 0.00
2 Included 0.00 0 0.00
TOTAL TYPE TEST CHARGES 0.00
Total GST as confirmed by Bidder 0.00
Date : -- Printed Name :
Place : Designation :
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566
Construction of balance work of Transit camp at POWERGRID Jaipur south substation 0 0
(SCHEDULE OF RATES AND PRICES ) 0 0
Bidder’s Name and Address (Lead Partner) :
SL. NO. Description of Test #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566
Construction of balance work of Transit camp at POWERGRID Jaipur south substation As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES : TYPE TEST CHARGES) AS per Percent #REF!
As per lum-sum on Sch-7 0.00%
Bidder’s Name and Address (Lead Partner) : To: As per Percent on Sch-7 #REF!
Power Grid Corporation of India Limited Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Northern Region Transmission System–I, Regional Headquarter,
Address : …….. …….. …….. …….. …….. …….. SCO Bay No. 5 to 10, Sector 16A,
…….. …….. …….. …….. …….. …….. Faridabad-121002, Haryana Multipackage Discount 0.0000%
Type Tests on Earthwire
SL. NO. Description of Test Unit Quantity Unit Test Charge Total Test Charges (Rs.) Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
(a) #REF! #REF! #REF! #REF! #REF!
(b) #REF! #REF! #REF! #REF! #REF!
Sub-Total (I) #REF!
TOTAL TEST CHARGES (I) #REF!
Discount Sche-7 #REF! MPD Sche-7 #REF!
Dis Alert #REF!
Date : -- Printed Name :
Place : Designation :
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566
Construction of balance work of Transit camp at POWERGRID Jaipur south substation 0 0 0
(SCHEDULE OF RATES AND PRICES : TYPE TEST CHARGES) 0 0 0
Bidder’s Name and Address (Lead Partner) : 0
SL. NO. Description of Test 0
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
This letter of discount is optional. Bidder may / may not offer any discount.
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566 Letter of Discount
LETTER OF DISCOUNT
Contract Services
Power Grid Corporation of India Ltd.,
"Saudamini", Plot No.-2
Sector-29, (near IFFCO Chowk)
Gurgaon (Haryana) - 122001
Subject : Construction of balance work of Transit camp at POWERGRID Jaipur south substation
With reference to the subject tender, we hereby offer unconditional discount on the prices quoted by us as per details given here below : Eq Weightage of Rs/ % Final Discount Factor
1 Discount on lum-sum basis on total price quoted by us without Taxes & Duties. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2, Sch-3, Sch-4a, Sch-4b & Sch-7] In Rs. 0.00 0.0000000000%
2 Discount on percent basis on total price quoted by us without Taxes & Duties. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2 , Sch-3, Sch-4a, Sch-4b & Sch-7] In Percent (%) 0.00 0.00%
3 Discount on lum-sum basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Rs.
Schedule-1 : Ex works prices In Rs. 0.00 0.0000000000% Schedule-1 : Ex-Works Price 0.0000000000%
Schedule-2 : Freight & Insurance In Rs. 0.00 0.0000000000% Schedule-2 : Freight & Insurance 0.0000000000%
Schedule-3 : Erection Charges In Rs. 0.00 0.0000000000% Schedule-3 : Erection Charges 0.0000000000%
Schedule-4a : Training Charges In Rs. 0.00 0.0000000000% Schedule-4a : Training Charges 0.0000000000%
Schedule-4b : Maintenance Charges during and after DLP In Rs. 0.00 0.0000000000% Schedule-4b : Maintenance Charges 0.0000000000%
Schedule-7 : Type Test Charges In Rs. 0.00 0.0000000000% Schedule-7 : Type Test Charges 0.0000000000%
4 Discount on percent basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Percent (%)
Schedule-1 : Ex works prices In Percent (%) 0.00 0.00%
Schedule-2 : Freight & Insurance In Percent (%) 0.00 0.00%
Schedule-3 : Erection Charges In Percent (%) 0.00 0.00%
Schedule-4a : Training Charges In Percent (%) 0.00 0.00%
Schedule-4b : Maintenance Charges during and after DLP In Percent (%) 0.00 0.00%
Schedule-7 : Type Test Charges In Percent (%) 0.00 0.00%
Discount(s) offered at sl. No. 1 to 4 will get displayed and accounted for automatically in the respective items of the Schedules.
5 We hereby offer Multi-package discount as given below:
Multi-Package Discount(s) offered at sl. No. 5 will not get automatically accounted for in the respective items of the Schedules. The same shall be worked out saparately for evaluation.
Please consider this letter of discount as the integral part of our price bid.
Thanking you, we remain,
Yours faithfully,
For and on behalf of …….. …….. …….. …….. …….. ……..
Date : -- Printed Name :
Place : Designation :
Details of Octroi
Sl No. Description of Items Amount on which Octroi is applicable Rate of Octroi Octroi
Details of Entry Tax
Sl No. Description of Items Amount on which Entry Tax is applicable Rate of Entry Tax Entry Tax
Details of Other Taxes & Duties
Sl No. Description of Items Amount on which Other Taxes & Duties are applicable Description of Taxes & Duties Rate of Taxes & Duties Amount of Taxes & Duties
Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566 Bid Form 2nd Envelope 0 1 st 1 January
0 2 nd 2 February
BID FORM (Second Envelope) 3 rd 3 March
Bid Proposal Ref. No. 5 th 5 May
Date : -- 6 th #VALUE! 6 June
7 th #VALUE! 7 July
To: 8 th #VALUE! 8 August
Power Grid Corporation of India Limited 9 th #VALUE! 9 September
Northern Region Transmission System–I, Regional Headquarter, 10 th 10 October
SCO Bay No. 5 to 10, Sector 16A, 11 th 11 November
Faridabad-121002, Haryana 12 th 12 December
Name of Contract : Construction of balance work of Transit camp at POWERGRID Jaipur south substation 15 th
Dear Ladies and/or Gentlemen, 16 th
Schedule 1 Plant and Equipment (Including Mandatory Spare Parts) to be supplied, including Type Test Charges. 21 st
Schedule 2 Local Transportation, In-transit Insurance, loading and unloading 22 th
Schedule 3 Installation Charges. 23 th
Schedule 4 Training charges for training to be imparted. 24 th
Schedule 4b Maintenance Charges during & after Defect Laibility Period.
Schedule 5 Taxes and Duties not included in Schedule 1 25 th
Schedule 6 Grand Summary [Schedule 1to 5] 26 th
Schedule 7 Break-up of Type Test Charges for Type Tests to be conducted 27 th
2.5 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced. 31 st
3.0 We confirm that except as otherwise specifically provided our Bid Prices in this Second Envelope include all taxes, duties, levies and charges as may be assessed on us/our Associate (applicable for Foreign Bidder), our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
3.1 100% of applicable Taxes and Duties i.e GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
3.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
4.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions. 2
5.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of …….. …….. …….. …….. …….. ……..
Date : -- Printed Name :
Place : Designation :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him.
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
STATEMENT OF QUOTED / CORRECTED PRICES
All Figures are in Rupees
Sl. No. Price Component Quoted Price Corrected Price
1 TOTAL SCHEDULE NO. 1:Ex-Works Price of Plant and Equipment including Type Test Charges 0.00 0.00
2 TOTAL SCHEDULE NO.2: Local Transportation, Insurance and other Incidental Services. 0.00 0.00
3 TOTAL SCHEDULE NO.3: Installation Charges 0.00 0.00
4 TOTAL SCHEDULE NO.4: Training Charges Not Applicable Not Applicable
5 TOTAL BID PRICE: (Excluding Taxes & Duties) 0.00 0.00
6 DISCOUNT #REF! #REF! #REF!
7 NET BID PRICE (Excluding Taxes & Duties) #REF! #REF!
8 TAXES & DUTIES PAYABLE ADDITIONALLY
A) EXCISE DUTY 0 0.00
B) CENTRAL SALES TAX 0 0.00
C) VAT #REF! 0.00
D) ENTRY TAX / OCTROI #REF! 0.00
F) TOTAL TAXES & DUTIES #REF! 0.00
8 TOTAL BID PRICE (INCLUDING TAXES & DUTIES) #REF! 0.00
9 TOTAL SCHEDULE NO.7: Type Test Charges [Total of this Schedule is included in Schedule-1 above] 0.00 0.00
I) Bidder has indicated the following taxes and duties additionally applicable for their bid:
Excise Duty % as Excise Duty
#REF! VAT #REF! #REF!
#REF! Entry Tax/ Octroi #REF! #REF!
Others as Others
II) With regard to Entry Tax, it may be mentioned that the substations covered under the subject pacakge falls in State of MP, where an entry tax @ 2% of Purchase Price is applicable. In view of the above, the taxes and duties inter-alia including entry tax applicable for the bids are calculated :
a) Ex-Works Price of Direct Supplies (after discount, if any) Rs. 0
b) Excise Duty, as applicable on (a) above at the rate : 10.00% Rs. 0
c) Amount on which Sales Tax is applicable 0.00 0
d) CST, as applicable on (a) + ED (b) above at the rate : 2.00% Rs. 0
e) VAT, as applicable on (a) + ED (b) above at the rate : 1.00% 0
g) Purchase Price for Entry Tax (Total Ex-Works+F&I+ED+CST+Others) Rs. 0
h) Entry Tax, as applicable on (e) above at the rate : Rs. 0.00
Construction of balance work of Transit camp at POWERGRID Jaipur south substation Statement of Quoted / Corrected Prices Page
Spec. No. Specification No.:'NR1/NT/W-MISC/DOM/I00/23/12566
STATEMENT OF QUOTED / CORRECTED PRICES
All Figures are in Rupees
Sl. No. Price Component Quoted Price Corrected Price
1 TOTAL SCHEDULE NO. 1:Ex-Works Price of Plant and Equipment including Type Test Charges 0.00 0.00
2 TOTAL SCHEDULE NO.2: Local Transportation, Insurance and other Incidental Services. 0.00 0.00
3 TOTAL SCHEDULE NO.3: Installation Charges 0.00 0.00
4 TOTAL SCHEDULE NO.4: Training Charges Not Applicable Not Applicable
5 TOTAL BID PRICE: (Excluding Taxes & Duties) 0.00 0.00
6 DISCOUNT #REF! #REF!
7 NET BID PRICE (Excluding Taxes & Duties) #REF! #REF!
8 TAXES & DUTIES PAYABLE ADDITIONALLY
A) EXCISE DUTY #REF! 0.00
B) CENTRAL SALES TAX /VAT #REF! #REF!
C) ENTRY TAX / OCTROI #REF! #REF!
D) OTHERS #REF! 0.00
E) TOTAL TAXES & DUTIES #REF! #REF!
8 TOTAL BID PRICE (INCLUDING TAXES & DUTIES) #REF! #REF!
9 TOTAL SCHEDULE NO.7: Type Test Charges [Total of this Schedule is included in Schedule-1 above] 0.00 0.00
I) Bidder has indicated the following taxes and duties additionally applicable for their bid:
a) Excise Duty Rs. #REF!
b) CST /VAT Rs. #REF!
c) Entry Tax / Octroi Rs. #REF!
d) Others Rs. #REF!
II) Bidder has offered following discount(s)
III) With regard to Entry Tax, it may be mentioned that the substations covered under the subject pacakge falls in State of MP, where an entry tax @ 1% of Purchase Price is applicable. In view of the above, the taxes and duties inter-alia including entry tax applicable for the bids are calculated : Details of dicounts
a) Ex-Works Price of Direct Supplies (after discount, if any) Rs. 0 Gross LS #REF! #REF! #REF! Gross % #REF! #REF! #REF!
b) Excise Duty @ 10.3% of (a) above Rs. 0 #REF! #REF!
c) CST / VAT @ 2% of Ex-Works of Direct Supplies (a) + ED (b) above Rs. #REF! Sch-1 Direct LS #REF! #REF! #REF! Sch-1 Direct % #REF! #REF! #REF!
d) Others Rs. Sch-1 BO LS #REF! #REF! #REF! Sch-1 BO % #REF! #REF! #REF!
e) Purchase Price for Entry Tax (Total Ex-Works+F&I+ED+CST+Others) Rs. #REF! Sch-2 LS #REF! #REF! #REF! Sch-2 % #REF! #REF! #REF!
f) Entry Tax @ 1% of (e) above Rs. #REF! Sch-3 LS #REF! #REF! #REF! Sch-3 % #REF! #REF! #REF!
Sch-7 LS #REF! #REF! #REF! Sch-7 % #REF! #REF! #REF!
Construction of balance work of Transit camp at POWERGRID Jaipur south substation Statement of Quoted / Corrected Prices Page Different Manner #REF!
Text for Discount #REF!
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Name of Package : “Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
Specification No. : NR1/NT/W-MISC/DOM/I00/23/12566
Completion Period 12 Months
: Attachments : General guidelines for filling up the Attachments Construction of Residential Complex: - :
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
Specification No.: NR1/NT/W-MISC/DOM/I00/23/12566
1 Fill up only green shaded cells in the relevent attachments.
2 Attachments 3(JV), 3(QR), Attach QR, 4, 4(A), 4(B), 5, 6, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17,18, 19 and Bid Form for 1st Envelope are included here.
3 Attachment 1 Bid Security : To be submitted as perproforma provided in the bidding document.
4 Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
5 Attachment 8 Manufacturer’s Authorisation Form : To be furnished as per proforma provided in the bidding document, on the letter head of the each Manufactures proposed to supply main items. Not included here.
6 Attachment 14 Integrity Pact : To be submitted as per ITB Clause No. 9.3(n) and as per remarks in the Attach 14-IP.
7 Attachment 18 Safety Pact : To be submitted as per ITB Clause No. 9.3(r) and as per remarks in the Attach 18.
8 Attachment 20: Declaration of Key Managerial Person jointly with Power of Attorney holder
9 Attachment 21: Affidavit of Self certification regarding Minimum Local Content in line with PPP-MII order, if applicable
10 Attachment 22: Certificate from statutory auditor or cost auditor of the company (in the case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of Local Content, in line with PPP-MII order, if applicable
11 Attachment 23: Compliance to the process related to the e-RA Terms & Conditions and the Business Rules governing the e-RA
Note : Enable the Active X Control & Macros. Also ensure to keep option of "Trust acess to VBA project object Model" cheched [√]. Ensure that you work on MS Excel 2007 or higher version.
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
NR1/NT/W-MISC/DOM/I00/23/12566 Sole Bidder 1
Yes JV (Joint Venture) 2 or More
Enter following details of the bidder No
Specify type of Bidder [Select from drop down menu] Sole Bidder Sole Bidder 2 0
Address of Bidder
Whether the bidder is an MSE (Micro & Small Enterprise) Yes Yes 2 2 0
Enter the Name of Registration Authority
Whether the bidder meets Minimum Local Content in line with PPP-MII order, 2017 0 2 2 0
e-mail ID of Bid Signatory
Mobile No. of Bid Signatory
Tel No. of Bid Signatory
Fax No. of Bid Signatory MSE Yes
Name of other Partner Ram Lal
Address of other Partner G5
Name of other Partner - 2 (more, if any)
Address of other Partner - 2 (more, if any)
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-3(JV) Sole Bidder
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Joint Venture Agreement and Power of Attorney for Joint Venture*)
Bidder’s Name and Address To:
Contract & Materials & Ram Lal
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
0 Faridabad-121002
This Attachment is Not Applicable
Name(s) and Addresse(s) of other partner(s)
The Joint Venture Agreement (as per the proforma attached at no. 15 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) and Power of Attorney for Joint Venture (as per the proforma attached at no. 14 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) are enclosed herewith Sole Bidder
Date : -- Printed Name : 0
Place : Designation : 12
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-3(QR)
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Qualifying Requirement Data)
Bidder’s Name and Address (Lead Partner of) : To:
Contract & Materials
Name: 0 Power Grid Corporation of India Ltd.,
Address: 0 Northern Region –I, Regional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
Faridabad-121002
In support of the Qualification Requirements (QR) for bidders, stipulated in Annexure-A (BDS) of the Section - III (BDS), Volume-I & Additional Information required as per ITB clause 9.3(c) of the Bidding Documents, we furnish herewith our QR data/details along with other information, as follows herewith our stipulations have been reproduced in italics for ready reference, however, in case of any discrepancy the QR as given in BDS shall prevail).
* We have submitted bid as individual firm.
* We have submitted bid as joint venture of following firms :
(ii) #REF! 2 or more
(* Strike-off whichever is not applicable)
[For details regarding Qualification Requirements of a Joint Venture, please refer para 4.0 below.]
We are furnishing the following details/document in support of Qualifying requirement for the subject package.
A Attached copies of original documents defining :
a) The constitution or legal status;
b) The principal place of business;
c) The place of incorporation (for bidders who are corporations); or the place of registration and the nationality of the Owners (for applicants who are partnerships or individually-owned firms).
B Attached original & copies of the following documents :
a) Written power of attorney of the signatory of the Bid to commit the bidder.
b) Joint Venture Agreement.
GENERAL INFORMATION
Bidder is required to provide general information as per the following format.
[Where the Bidder proposes to use named subcontractor(s) for critical components of the works or for work contents in excess of ten (10) percent of the bid price, the following information should also be supplied for the subcontractor(s)].
S No. Particulars Name of the Bidder
1 Name of the Firm 0
2 Head Office/ Registered Office Address
5 Contact Person
6 Place of Incorporation/ Registration
7 Year of Incorporation/ Registration
8 Date of Commercial production
9 Nationality of
10 Whether the bidder is an MSE (Micro & Small Enterprise). If Yes, attach Documentary Evidence with the Bid.
11 Whether the Bidder is a Start-Ups Company (as defined by DIPP). If Yes, attach Documentary evidence with the Bid.
1.0 TECHNICAL REQUIREMENTS {Reference para 1.0 of Annexure-A (BDS)}
1.1 1.0 Technical Experience: The bidder should have successfully# completed institutional / commercial / Residential buildings (RCC, PEB framed structure) in Govt. or Semi Govt. or reputed private Sector Organization as a prime contractor during the last 7 years from the originally scheduled date of bid opening, as per following: i. Under One contract of value of not less than ₹1,30,70,845/- (including GST ). OR ii. Under two contract each of value of not less than ₹81,69,278/- (including GST ) OR iii.Under three contract each of value of not less than ₹65,35,422/- (including GST )
1.2 Route-2: The bidder(s) who have established production line and testing facilities in India for 715kV or above class Reactor based on Technological Support of the Collaborator(s) for the equipment(s) can also be considered qualified provided, The bidder must have manufactured in India, type tested 715kV or higher voltage class either One (1) no. 1-phase Reactor of at least 80 MVAR capacity or One (1) no. 1-phase Transformer of at least 166 MVA capacity and the same should have been supplied as on the date of bid opening as mentioned above based on Technological Support of Collaborator(s) provided that:- (a) Collaborator(s) meets the Technical Experience criteria stipulated in Route-1. (b) A legally enforceable undertaking jointly by Bidder and the Collaborator(s) (as per enclosed format in Section-VI of bidding document) is furnished along with the bid, to guarantee quality, timely supply, performance and warranty obligations for five(5) years for entire quantity to be manufactured and supplied from the works in India and a confirmation letter from the Collaborator(s) along with the bid stating that Collaborator(s) shall furnish performance guarantee for an amount of 10% of the cost of such equipment(s). This performance guarantee shall be in addition to contract performance guarantee to be submitted by the bidder.
1.3 Route-3: In case, the bidder is an Indian Entity established as Subsidiary/JVC/Group company by its parent/principal, who have established production line and testing facilities in India for 715kV or above class Reactor based on Technological Support of the parent/principal for the equipment(s) can also be considered qualified provided, The bidder must have manufactured in India, type tested 715kV or higher voltage class either One (1) no. 1-phase Reactor of at least 80 MVAR capacity or One (1) no. 1-phase Transformer of at least 166 MVA capacity and the same should have been supplied as on the date of bid opening as mentioned above based on Technological Support of Parent/ Principal company provided that:- (a) Parent/ Principal company meets the Technical Experience criteria stipulated in Route-1. (b) A legally enforceable undertaking jointly by Bidder and the Parent/ Principal company (as per enclosed format in Section-VI of bidding document) is furnished along with the bid, to guarantee quality, timely supply, performance and warranty obligations for five(5) years for entire quantity to be manufactured and supplied from the works in India and a confirmation letter from the Parent/ Principal company along with the bid stating that Parent/ Principal company shall furnish performance guarantee for an amount of 10% of the cost of such equipment(s). This performance guarantee shall be in addition to contract performance guarantee to be submitted by the bidder.
In case bidder is a holding company, the technical experience referred to in para 1.1 above shall be of that holding company only (i.e. excluding its subsidiary/group companies). In case bidder is a subsidiary of a holding company, the technical experience referred to in para 1.1 above shall be of that subsidiary company only (i.e. excluding its holding company).
Using the following formats, each Bidder is requested to list the experience as detailed above, on the basis of which the Bidder wishes to qualify. The information is to be summarised using following format for each experience of the Bidder
(The bidder shall attach documentary evidence, such as copies of utility certificates for completed contracts and copies of award letters etc. for ongoing contracts in support of his experience as listed in the following proforma for each Contract with the help of "Attach" Buttons provided in table given below).
Format-A: (ROUTE-1)
Format for the Bidder/ Collaborator/ Parent/Principal Company of the bidder who must have designed, manufactured, tested & supplied 715kV or Higher Voltage class Reactor in support of meeting the Technical experience requirement of 1.1 of Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
Bidder’s Name : 0 0
Single Firm : 0
1 Name of Contract Undertaken 0
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility for whom the Contract was executed by the firm
4(a)(i) Voltage Level of Reactors supplied under the Contract (Indicate 715kV or above class only)
No. of Reactor(s) under the contract
(Indicate nos. of 1 phase Reactors with rating not less than 110 MVAR OR no. of Reactors in Banks of 3 single phase units of at least 36.7 MVAR each)
MVAR capacity of the above mentioned three phase/single phase units
Name of the substation or switchyard
(a)(ii) No. of years, the above Reactor(s) are in operation as on the date of bid opening.
Type of cooling in the above Reactor
Scope of work involved under the Contract executed by Bidder
(Tick whichever is/are applicable)
of Reactors of Reactors
of Reactors of Reactors
Details of documents uploaded in support of the above stated experience
4(b)(i) Voltage Level of Transformers supplied under the Contract (Indicate 715kV or above class only)
No. of Transformer(s) under the contract
(Indicate nos. of 1 phase Transformer with rating not less than 500 MVA OR no. of Transformer in Banks of 3 single phase units of at least 166 MVA each)
MVA capacity of the above mentioned three phase/single phase units
Name of the substation or switchyard
Type of cooling in the above Transformer
Scope of work involved under the Contract executed by Bidder
(Tick whichever is/are applicable)
of Transformers of Transformers
of Transformers of Transformers
Details of documents uploaded in support of the above stated experience
4(b)(ii) Voltage Level of Reactors supplied under the Contract (Indicate 345kV or above class only)
No. of Reactor(s) under the contract
(Indicate nos. of 3 phase Reactors with rating not less than 50 MVAR OR no. of Reactor(s) in Banks of 3 single phase units of at least 16.7 MVAR each)
MVAR capacity of the above mentioned three phase/single phase units
Name of the substation or switchyard
Type of cooling in the above Reactor
Scope of work involved under the Contract executed by Bidder
(Tick whichever is/are applicable)
of Reactors of Reactors
of Reactors of Reactors
Details of documents uploaded in support of the above stated experience
4(b)(iii) No. of years, the above transformer(s) and reactor(s) indicated at 4(b)(i) & 4(b)(ii) respctively, are in operation as on the date of bid opening.
Details of documents uploaded in support of the above stated experience
Format-B: (ROUTE-2)
Format for Bidder(s) [who have established production line and testing facilities in India for 715kV or above class Reactor based on Technology Support of Collaborator(s)], in support of meeting the requirement of 1.2 (Route-2), Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents
Name of the Reactor Manufacturer 0 0
1 Name of Contract Undertaken 0
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility for whom the Contract was executed by the firm
4 Voltage Level of Reactors manufactured under the Contract (Indicate 715kV or above class only)
No. of Reactor(s) under the contract
(Indicate nos. of 1 phase Reactors with rating not less than 80 MVAR)
MVAR capacity of the above mentioned three phase/single phase units
Name of the substation or switchyard
whether the above Reactors are in operation as on the date of bid opening.(Yes/No)
No. of years, the above Reactors are in operation as on the date of bid opening.
Scope of work involved under the Contract
(Tick whichever is/are applicable)
Voltage Level of Transformer supplied under the Contract
No. of Transformer(s) under the contract
(Indicate nos. of 1 phase Transformer with rating not less than 166 MVA)
MVA capacity of the above mentioned three phase/single phase units
Name of the substation or switchyard
Whether the above Transformer are in operation as on the date of bid opening.
No. of years, the above Transformer are in operation as on the date of bid opening.
Scope of work involved under the Contract
(Tick whichever is/are applicable)
Details of documents uploaded in support of the above stated experience
Format-C: (ROUTE-3)
Format for Bidder (Indian entity) established as Subsidiary/ JVC/ Group Company by its Parent/ Principal, who have established production line and testing facilities in India for 715kV or above class Reactor, in support of meeting the requirement of 1.3 (Route-3), Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
Name of the Bidder 0
Name of the Parent Company/Collaborator/Subsidiary for the 765kV Reactor {The qualifying data for the parent company or collaborator for the equipment is furnished in Format-A above) 0
1 Name of Contract Undertaken
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility for whom the Contract was executed by the Bidder
4 Voltage Level of Reactor supplied under the Contract (Indicate 715kV or above class only)
No. of Reactor(s) under the contract
(Indicate nos. of 1 phase Reactor with rating not less than 80 MVAR)
MVAR capacity of the above mentioned three phase/single phase units
Name of the substation or switchyard
Date as on which the above mentioned Reactors are supplied based on technological support of parent company / collaborator(s) / subsidiary.
Type of cooling in the above Reactor
Scope of work involved under the Contract executed by bidder
(Tick whichever is/are applicable)
Voltage Level of Transformer supplied under the Contract
No. of Transformer(s) under the contract
(Indicate nos. of 1 phase Transformer with rating not less than 166 MVA)
Name of the substation or switchyard
(b)(ii) Whether the above Transformer are in operation as on the date of bid opening.
No. of years, the above Transformer are in operation as on the date of bid opening.
Scope of work involved under the Contract
(Tick whichever is/are applicable)
5 Whether Parent/Principal company(s) meets the technical experience criteria stipulated at 2.1.1 above, and the details of which is mentioned at Format-A above. (Applicable for the Bidder/Manufacturer(s) wish/proposes to qualify through Route-3 of Annexure-A(BDS))
6 Whether legally enforceable undertaking jointly by Bidder and the Parent/Pricipal company(s) (as per enclosed format in Section-VI: Sample Forms and Procedures of bidding document) is furnished along with the bid. (Applicable for the Bidder/Manufacturer(s) wish/proposes to qualify through Route-3 of Annexure-A(BDS))
7 Confirmation letter from the Parent/Principal Company along with the bid stating that Parent/Principal Company shall furnish performance guarantee, in addition to contract performance guarantee to be submitted by the bidder, for an amount of 10% of the cost of equipment(s) to be manufactured and supplied from the works in India. (Applicable for the Bidder wish/proposes to qualify through Route-3 of Annexure-A(BDS))
8 Details of documents uploaded in support of the above stated experience Annex-XXX Annex-YYY Annex-ZZZ
2.0 FINANCIAL REQUIREMENTS :
Financial Position {Reference para 1.2 of Annexure-A (BDS)} For the purpose of this particular bid, bidders shall meet the following minimum criteria:
(a)Minimum Average Annual Turnover @ (MAAT) for best 3 financial years out of last 5 financial years of the bidder should not be less than INR 2,45,07,835
b Minimum Average Annual Turnover^ (MAAT) for best three (3) years i.e. 36 months out of last five (5) financial years of the bidder should be Rs. 1233.18 million or equivalent for Reactor Package RT-08 ^ Annual gross revenue from operations/gross operating income as incorporated in the profit & loss account excluding other income.
c Bidder shall have liquid assets (L.A.) or/and evidence of access to or availability of credit facilities of not less than Rs. 205.53 million or equivalent for Reactor Package RT-08
Note: (i) In case bidder is a holding company, the Financial Position criteria referred to in para 2.0 above shall be that of holding company only (i.e. excluding its subsidiary / group companies). In case bidder is a subsidiary of a holding company, the Financial Position criteria referred to in para 2.0 above shall be that of subsidiary company only (i.e. excluding its holding company). (ii) In case bidder has established manufacturing facility in India and yet to complete three (3) financial years, the Net Worth and average of the turnover as per financial statement for completed financial years shall be considered for the purpose of compliance to the specified Net Worth and MAAT requirements. (iii) In case of bidder qualifying through Route-3 but not meeting the Financial Position requirement as per note (i) read along with note (ii) above, the following shall be applicable: In case bidder is yet to complete five (5) years from the date of commercial production of such equipment(s) but no later than seven (7) years from the date of incorporation of the said company as on the originally scheduled date of bid opening as above, the financial position requirement as per para 2.0 (b) & (c) of parent/principal company providing collaboration for technological support shall be considered. However, once he meets the turnover requirement on their own or completes five (5) years from the date of commercial production of such equipment(s) in India but no later than seven (7) years from the date of incorporation as on the originally scheduled date of bid opening as above, the financial position requirements as specified at 2.0 (b) and (c) above shall also be required to be met by such bidder on their own as per note (i) above and not based on their parent/principal company. Further, in case the bidder is yet to complete one (1) financial year, the Net worth requirement as per para 2.0 (a) above of parent/principal shall be considered.
(iv) Relaxation for Start-Ups^/ MSEs Start-Ups^/MSEs, meeting the specified requirements at Para 2 (a) above in Financial Position shall also be considered qualified if they meet Eighty (80) % of the requirement specified at Para 2 (b) & 2 (c) above in Financial Position. ^ Start-Ups as defined by DIPP, applicable as on the originally scheduled date of bid opening.
Note: MSE/START-UPs^^ meeting the specified requirements at para 2.0 above, shall also be considered qualified if they meet 80% (Eighty percent) of the requirements specified at para 2.0 above
{In support of its ‘Financial Position’, in line with the above, the Bidder (in case of bidding by single firm ) or Company/Constituents must provide the relevant information in support of the same, along with documentary evidence, in the following format}
4.0 Financial Qualification Data for Bidder: 2 or more
Name of the Bidder
Whether the complete Annual Reports together with Audited Financial Statement of accounts/equivalent documents of the company for the FY of immediately preceding the date of submission of bid are available?
Financial year Networth (in Rs. Millions) Details of documentary evidence submitted in support of Qualification Data
A Turnover details:
Sl No Financial year Turnover (in Rs. Millions) Details of documentary evidence submitted in support of Qualification Data
Average Annual Turnover for best Three Years is
C Liquid Assets
LA (in Rs. Millions) Details of documentary evidence submitted in support of Qualification Data
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
5.0 Financial Qualification Data for Parent/Principal Company/Collabrator (If Applicable): 0
Name of Parent/Principal Company/Collabrator
Whether the complete Annual Reports together with Audited Financial Statement of accounts/equivalent documents of the company for the FY of immediately preceding the date of submission of bid are available?
Financial year Networth (in Rs. Millions) Details of documentary evidence submitted in support of Qualification Data
B Turnover details:
Sl No Financial year Turnover (in Rs. Millions) Details of documentary evidence submitted in support of Qualification Data
Average Annual Turnover for best Three Years is
C Liquid Assets
LA (in Rs. Millions) Details of documentary evidence submitted in support of Qualification Data
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
6 The Bidder shall also furnish following documents/details with its bid. {Reference ITB clause 9.3 (c)}
6.1 The complete annual reports together with Audited statement of accounts of the company for last five years of its own (separate) immediately preceding the date of submission of bid.
Note I. In the event the bidder is not able to furnish the information of its own (i.e separate), being a subsidiary company and its accounts are being consolidated with its group/holding/parent company, the bidder should submit the audited balance sheets, income statements, other information pertaining to it only (not of its group/Holding/Parent Company) duly certified by any one of the authority [ (i) Statutory Auditor of the bidder /(ii) Company Secretary of the bidder or (iii) A certified Public Accountant] certifying that such information/documents are based on the audited accounts as the case may be.
II. Similarly, if the bidder happens to be a Group/Holding/Parent Company, the bidder should submit the above documents/information of its own (i.e. exclusive of its subsidiaries) duly certified by any one of the authority mentioned in Note-I above certifying that these information/documents are based on the audited accounts, as the case may be.
6.2 Technical Credentials: List of work regarding past experience indicating the execution of similar work successfully, schedule time of completion and actual time of completion, the present status of projects in hand along with presently envisaged completion dates, qualification and experience of key personnel proposed for carrying out the subject work. List of available T & P and Manpower available with the bidder is also to be enclosed. Litigation History: The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder may result in rejection of Bid.
6.3 The Bidder should accordingly also provide the following information/documents
Audited balance sheet and income statements for the last five years as per the following:
A Years preceding to the bid opening Audited Balance Sheet and Income Statements enclosed
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-3(QR)
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Qualifying Requirement Data)
Bidder’s Name and Address (Lead Partner of) : To:
Contract Services
Address: 0 "Saudamini", Plot No. 2, Sector 29
0 Gurgaon (Haryana) - 122001
In support of the Qualification Requirements (QR) for bidders, stipulated in Annexure-A (BDS) of the Section - III (BDS), Volume-I & Additional Information required as per ITB clause 9.3(c) of the Bidding Documents, we furnish herewith our QR data/details along with other information, as follows herewith our stipulations have been reproduced in italics for ready reference, however, in case of any discrepancy the QR as given in BDS shall prevail).
* We have submitted bid as individual firm.
* We have submitted bid as joint venture of following firms :
(ii) 0 2 or more
(* Strike-off whichever is not applicable)
[For details regarding Qualification Requirements of a Joint Venture, please refer para 4.0 below.]
We are furnishing the following details/document in support of Qualifying requirement for the subject package.
A Attached copies of original documents defining :
a) The constitution or legal status;
b) The principal place of business;
c) The place of incorporation (for bidders who are corporations); or the place of registration and the nationality of the Owners (for applicants who are partnerships or individually-owned firms).
B Attached original & copies of the following documents :
a) Written power of attorney of the signatory of the Bid to commit the bidder.
b) Joint Venture Agreement.
1.0 GENERAL INFORMATION
Bidder is required to provide general information as per the following format.
[Where the Bidder proposes to use named subcontractor(s) for critical components of the works or for work contents in excess of ten (10) percent of the bid price, the following information should also be supplied for the subcontractor(s)].
S No. Particulars Name of the Bidder
1 Name of the Firm
2 Head Office/ Registered Office Address
5 Contact Person
6 Place of Incorporation/ Registration
7 Year of Incorporation/ Registration
8 Nationality of
9 Whether the bidder is an MSE (Micro & Small Enterprise). If Yes, attach Documentary Evidence with the Bid.
10 Whether the Bidder is a Start-Ups Company (as defined by DIPP). If Yes, attach Documentary evidence with the Bid.
2.0 TECHNICAL REQUIREMENTS {Reference para 1.0 of Annexure-A (BDS)}
2.1 TECHNICAL EXPERIENCE
2.1.1 The bidder must have designed, manufactured, tested, supplied, installed and commissioned 345kV or above class 3-phase transformers of at least 200 MVA or at least three (3) nos. 1-phase Transformers each having capacity of at least 66.7 MVA and the same Transformer(s) must have been in satisfactory operation* for atleast two (2) years on the originally scheduled date of bid opening i.e. 19.02.2019.
*Satisfactory operation means certificate issued by the Employer certifying the operation without any adverse remark.
2.1.2 The 345 kV or above class transformer manufacturer(s) who have established production line in India for these equipment(s) based on technological support of a parent company or collaborator for the respective equipment(s) can also be considered provided i) such manufacturer has designed, manufactured, tested, supplied, installed and commissioned 220KV or above class transformers. ii) the parent company (Principals) or collaborator meets qualifying requirements stipulated at para 2.1.1 above; and iii) The 345 kV or above class transformer manufacturer(s) furnishes a) a legally enforceable undertaking (jointly with the parent company or collaborator) to guarantee quality, timely supply, performance and warranty obligations as specified for the equipment(s); and b) a confirmation letter from the parent company or collaborator alongwith the bid stating that parent company or collaborator shall furnish performance guarantee for an amount of 10 % of the cost of such equipment (s). This performance guarantee shall be in addition to Contract Performance Guarantee to be submitted by the Bidder. Note-1: In case bidder is a holding company, the technical experience referred to in clause 2.1.1 and 2.1.2 above as the case may be shall be of that holding company only (i.e. excluding its subsidiary/group companies). In case bidder is a subsidiary of a holding company, the technical experience referred to in clause 2.1.1 and 2.1.2 above as the case may be shall be of that subsidiary company only (i.e. excluding its holding company).
2.1.3 Using the following format, each Bidder (individual firms or partners of a joint venture) is requested to list the experience as detailed above, on the basis of which the Bidder wishes to qualify. The information is to be summarised using following format for each experience of the Bidder
(The bidder shall attach documentary evidence, such as copies of utility certificates for completed contracts and copies of award letters etc. for ongoing contracts in support of his experience as listed in the following proforma for each Contract with the help of "Attach" Buttons provided in table given below).
Format for the Bidder OR Parent Company / Collaborator(s)/ Subsidiary (meeting para 1.1.1, Annexure-A to BDS) in support of meeting the requirement of para 1.1.1, Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
Bidder’s Name : 0 0
1 Name of Contract Undertaken (for 345kV or above class Transformers) 0
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility for whom the Contract was executed by the firm
4 Voltage Level of Transformer erected under the Contract (Indicate 345kV or above class only)
5 No. of Transformer (s) under the contract (Indicate nos. of 345kV or above voltage class Transformer not less than 200MVA or equivalent capacity in banks of 3 single phase units each having capacity of at least 66.7 MVA, during the last Two (2) years)
6 MVA capacity of above mentioned 3-phase/1-phase units
7 Name of the substation or switchyard
8 No. of years, the above Transformer are in operation as on the date of bid opening. (Originally Scheduled)
9 Scope of work involved under the Contract
(Tick whichever is/are applicable)
of Transformer of Transformer of Transformer
10 Details of documents uploaded in support of the above stated experience
Format for the Bidder in support of meeting the requirement of para 1.1.2, Annexure-A to BDS, Section-III, Volume-I of the Bidding Documents)
a Name of the Bidder
b Whether Bidder/Manufaturer established production line in India for 345kV or above class transformer
c Name of the Parent Company/Collaborator for the 345kV Transformer {The qualifying data for the parent company or collaborator for the equipment is furnished in Format-A above)
1 Name of Contract Undertaken
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility for whom the Contract was executed by the Bidder
4 Indicate details below in case Contract executed for Transformer
(i) Voltage Level of Transformer erected under the Contract (Indicate 220kV or above class only)
(ii) No. of Transformer (s) under the contract (Indicate nos. of 220kV or above voltage class Transformer only)
(iii) Name of the substation or switchyard
(iv) No. of years, the above Transformer are in operation as on the date of bid opening.
(v) Scope of work involved under the Contract
(Tick whichever is/are applicable)
of Transformer of Transformer of Transformer
5 Whether parent company / collaborator(s) meets the technical experience criteria stipulated at 2.1.1 , and the details of which is mentioned at Format-A above. (Choose whichever is applicable from the drop down menu) Yes
6 Whether legally enforceable undertaking jointly by Bidder and the parent company / collaborator(s) (as per enclosed format in Section-VI: Sample forms and Procedures of the bidding documents) is furnished along with the bid. (Choose whichever is applicable from the drop down menu)
7 Confirmation letter from the Parent Company / Collaborator along with the bid stating that Parent Company / Collaborator shall furnish performance guarantee, in addition to contract performance guarantee to be submitted by the bidder, for an amount of 10% of the cost of equipment(s). (Choose whichever is applicable from the drop down menu)
8 Details of documents uploaded in support of the above stated experience
3.0 FINANCIAL REQUIREMENTS :
Financial Position {Reference para 1.2 of Annexure-A (BDS)} For the purpose of this particular bid, bidders shall meet the following minimum criteria:
a) Net Worth for last 3 financial years should be positive b) Minimum Average Annual Turnover* (MAAT) for best three years i.e. 36 months out of last five financial years of the bidder should be INR 1075.90 million. * Note- “Annual gross revenue from operations/gross operating income as incorporated in the profit & loss account excluding other income”. c) Bidder shall have Liquid Assets (LA) and/or evidence of access to or availability of credit facilities of not less than INR 179.32 million. Note 1:- In case bidder is a holding company, the Financial Position criteria referred to in clause 3.0 above shall be that of holding company only (i.e. excluding its subsidiary / group companies). In case bidder is a subsidiary of a holding company, the Financial Position criteria referred to in clause 3.0 above shall be that of subsidiary company only (i.e. excluding its holding company).
Note 2:- Relaxation for Start-Ups^/ MSEs Start-Ups^/MSEs, meeting the specified requirements at Para 3.0 (a) above in Financial Position shall also be considered qualified if they meet Eighty (80) % of the requirement specified at Para 3.0 (b) & 3.0 (c) above in Financial Position. ^ Start-Ups as defined by DIPP, applicable as on the originally scheduled date of bid opening.
{In support of its ‘Financial Position’, in line with the above, the Bidder (in case of bidding by single firm ) or Company/Constituents must provide the relevant information in support of the same, along with documentary evidence, in the following format}
4.0 Financial Qualification Data: 2 or more
Name of the Bidder 0
Details of documentary evidence submitted in support of Qualification Data
Networth (in Rs. Millions)
Sl No Financial year
For the FY of immediately preceding the date of submission of bid.
B Turnover details:
Details of documentary evidence submitted in support of Qualification Data
Turnover (in Rs. Millions)
Sl No Financial year
For the FY of immediately preceding the date of submission of bid.
Average Annual Turnover for best Three Years is
C Liquid Assets
LA (in Rs. Millions) Details of documentary evidence submitted in support of Qualification Data
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
Name of Other Partner-1 of JV 0
Equivalent US$ (in Million) exchange rate* Details of documentary evidence submitted in support of Qualification Data
Networth (in Millions)
Sl No Financial year
Do you have audited results for FY 2016-17 Yes
*(Indicate the rate(s) of exchnage against US Dollar at the end of each year, which have been used for arriving the amount at equivalent US Dollar.)
B Turnover details:
Equivalent US$ (in Million) exchange rate* Details of documentary evidence submitted in support of Qualification Data
Turnover (in Millions)
Sl No Financial year
Do you have audited results for FY 2016-17 Yes
*(Indicate the rate(s) of exchnage against US Dollar at the end of each year, which have been used for arriving the amount at equivalent US Dollar.)
C Liquid Assets
LA Equivalent US$ (in Million)
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
Name of Other Partner-2 of JV 0
Equivalent US$ (in Million) exchange rate* Details of documentary evidence submitted in support of Qualification Data
Networth (in Millions)
Sl No Financial year
Do you have audited results for FY 2016-17 Yes
*(Indicate the rate(s) of exchnage against US Dollar at the end of each year, which have been used for arriving the amount at equivalent US Dollar.)
B Turnover details:
Equivalent US$ (in Million) exchange rate* Details of documentary evidence submitted in support of Qualification Data
Turnover (in Millions)
Sl No Financial year
Do you have audited results for FY 2016-17 Yes
Average Annual Turnover for best Three Years is
*(Indicate the rate(s) of exchnage against US Dollar at the end of each year, which have been used for arriving the amount at equivalent US Dollar.)
C Liquid Assets
LA Equivalent US$ (in Million)
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
4.0 Joint Venture (JV) Firms {Reference para 3.0 of Annexure-A (BDS)}
In case a bid is submitted by a Joint Venture (JV) of two or more firms as partners, all the partners of Joint Venture shall meet collectively requirements stipulated at clauses 3.0 (b) & 3.0 (c) above. The figure of average annual turnover and liquid assets/credit facilities for each of the partners of the JV shall be added together to determine the JV’s compliance with the minimum qualifying criteria set out in Para 3.0 (b) & (c) above.
However, for a JV to be qualified, the partner(s) of JV must also meet the following minimum criteria: i. All the partners of the JV shall meet individually the Financial Position criteria given at 3.0 (a) above. ii. The Lead Partner shall meet, not less than 40% of the minimum criteria given at clause 3.0 (b) & (c) and 100 % of the criteria given above at clause 2.1 iii. The other partner(s) shall meet not less than 25% of the criteria given at clause 3.0 (b) & (c) above and 100 % of the criteria given above at clause 2.1 or 2.2 Failure to comply with this requirement will result in rejection of the joint venture’s bid.
In case of Joint venture, the following conditions shall also apply:
(a) the bid, and in case of successful bid, the specified Form of Agreement shall be signed so as to be legally binding on all partners (as per enclosed format in Section-VI, Vol.-I of bidding document).
(b) one of the partners shall be nominated as Lead Partner, and the Lead Partner shall be authorized to incur liabilities and receive instructions for and on behalf of any and all partners of the Joint Venture, and the entire execution of the Contract shall be done with the Lead Partner and payment under the contract shall be received by the Lead Partner on behalf of the Joint Venture as per power conferred to him in the Power of Attorney. The authorization shall be evidenced by submitting a Power of Attorney signed by legally authorized signatory of all the partners as per Performa in in Section-VI, Vol.-I of bidding documents. The payment under the Contract can also be received by other partner(s) based on authorization of Lead Partner.
(c) All partners of the joint venture shall be liable jointly and severally for the execution of the Contract in accordance with the Contract terms and a statement to this effect shall be included in the authorisation mentioned under (b) above as well as in the Bid Form and in the Contract Form (in case of a successful bid);
(d) Agreement entered into by the Joint Venture partners shall be submitted with the bid.
The bidder shall furnish documentary evidence in support of the qualifying requirement stipulated as above.
4.1 In accordance with the above, in case of JV bidders, it should be ensured that necessary details including those pertaining to each JV partner are furnished and the documents are submitted alongwith the bid. Further, the JV bidders should also ensure that other requirements are complied with. The lists of documents furnished are to be indicated below :
A For Name of the Bidder
B For Name of Other Partner-1 of JV
C For Name of Other Partner-2 of JV
5.0 The Bidder shall also furnish following documents/details with its bid. {Reference ITB clause 9.3 (c)}
5.1 The complete annual reports together with Audited statement of accounts of the company for last five years of its own (separate) immediately preceding the date of submission of bid.
Note I. In the event the bidder is not able to furnish the information of its own (i.e separate), being a subsidiary company and its accounts are being consolidated with its group/holding/parent company, the bidder should submit the audited balance sheets, income statements, other information pertaining to it only (not of its group/Holding/Parent Company) duly certified by any one of the authority [ (i) Statutory Auditor of the bidder /(ii) Company Secretary of the bidder or (iii) A certified Public Accountant] certifying that such information/documents are based on the audited accounts as the case may be.
II. Similarly, if the bidder happens to be a Group/Holding/Parent Company, the bidder should submit the above documents/information of its own (i.e. exclusive of its subsidiaries) duly certified by any one of the authority mentioned in Note-I above certifying that these information/documents are based on the audited accounts, as the case may be.
5.2 The Bidder should accordingly also provide the following information/documents
Audited balance sheet and income statements for the last five years as per the following:
A Years preceding to the bid opening Audited Balance Sheet and Income Statements enclosed
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-3(QR)
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Qualifying Requirement Data)
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
For our Qualifying Requirements Data, please refer Schedule-QR of this volume.
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-4
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Form of Certificate of Origin and Eligibility)
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
We hereby certify that equipment and materials to be supplied are produced in [Name of Countries], eligible source country. Equipments & Materials produced in [Name of countries] Company incorporated & registered in [Name of countries]
We hereby certify that our company is incorporated and registered in [Name of Countries], eligible source country. [Name of Countries] [Name of Countries] [Name of Countries], [Name of Countries],
Date : -- Printed Name :
Place : Designation :
country. country. [Name of Countries], [Name of Countries],
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-4(A)
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
0 Faridabad-121002
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles are included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
S.No. For Equipment Item Description Unit Quantity
Notwithstanding what is stated above, we further confirm that any additional special maintenance tools and tackles, required for the equipment under this package shall be furnished by us at no extra cost to the employer.
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-4(B)
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles which are to be taken back after the completion of the work by us are not included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-5
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Bought-out & Sub-contracted Items)
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
We hereby furnish the details of the items/ sub-assemblies, we propose to buy for the purpose of furnishing and installation of the subject Package:
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
Name Nationality
We hereby declare that, we would not subcontract the erection portion of the contract without the prior approval of Employer.
We hereby furnish the details of the items/ sub-assemblies propose to supply from our own works (i.e. as direct transactions) in additiona to the supplies the same from other vendors (i.e. as Bought-out transactions) as detailed in the table given above.
Sl. No. Item Description Quantity proposed to be supplied Details of the plant from where supplies are proposed.
Name of Plant Address
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Annexure I to Attachment-5
(Bought-out & Sub-contracted Items)
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
Name Nationality
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Annexure I to Attachment-5
(Bought-out & Sub-contracted Items)
Sl. No. Item Description Details of the proposed sub-contractor/sub-vendor Details of the proposed sub-contractor/sub-vendor
Name Nationality
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-5A
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises)
Bidder's Name and Address: To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 B9, Qutab Institutional Area, Katwaria Sarai
0 New Delhi-110016
1 We hereby furnish the details of the items, components, raw material, services which we propose to buy/avail from Micro and Small Enterprises (MSEs) for the purpose of completion of works under the subject package:
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Name of Micro and Small Enterprises (MSEs)
Name Category (Micro or Small)
2 2. The above is a list of items we propose to procure from MSEs. However, based on the situations during the execution of the contract, the above list may undergo changes. We hereby confirm that the details regarding actual procurement from MSEs carried out by us, as per the format provided at Section VI, Forms and Procedures, Volume-I of bidding documents, shall be submitted along with the bills for payment against supplies made/works done during execution of contract.
We hereby furnish the details of the items/ sub-assemblies propose to supply from our own works (i.e. as direct transactions) in additiona to the supplies the same from other vendors (i.e. as Bought-out transactions) as detailed in the table given above.
Sl. No. Item Description Quantity proposed to be supplied Details of the plant from where supplies are proposed.
Name of Plant Address
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-5A
(Bought-out & Sub-contracted Items)
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Name of Micro and Small Enterprises (MSEs)
Name Category (Micro or Small)
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-6
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Alternative, Deviations and Exceptions to the Provisions)
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Annexure I toAttachment-6
(Alternative, Deviations and Exceptions to the Provisions)
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-7
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Details of Alternative Bid)
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
No Alternative Bid
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-9
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Work Completion Schedule)
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 B9, Qutab Institutional Area, Katwaria Sarai
0 New Delhi-110016
We hereby declare that the following Work Completion Schedule shall be followed by us in furnishing and completion of works i.e., “Construction of balance work of Transit camp at POWERGRID Jaipur south substation" for the period commencing from the effective date of Contract to us :
Sl. No. Description of Work- Activity “Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
Breakup of Completion Schedule in Months (Bidder must fill break-up Schedule)
1 Handing over of site to agency/ Mobilization at site
a Establishment of site office
b Kick off meeting
2 Completing statuory requirement of contract such as labour license, Insurance policies- Workmen Compensation Insurance Policy, Contractor All Risk Insurance Policy, etc
3 Sampling and source approval of construction materials including design mix for RCC concrete or as per BPS
4 Excavation of basement
5 RCC structure work below Plinth level
6 RCC structure work above Plinth level
7 All ancillary Civil works including Brick Work, Plaster, Painting, Doors, Windows, Flooring, Water Proofing, Building. Septic tank/ Soak pit, etc
8 Internal & External electrification
10 Fire Fighting work
11 Plumbing & Sewerage work
12 Road, drain, water harvesting, swimming pool work, etc
13 Development of Horticulture work
14 Balance- Internal, external finishing as per requirement of site
15 Handing/ taking over of facilities including submission of "As BUILT DRAWING" and relevant NOCs (if required)
Date : -- Printed Name :
Place : Designation :
Note : Bidders to enclose a detailed network covering all the activities to be undertaken for completion of the project indicating key dates for various milestones for each phase constituent-wise.
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-10
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Guarantee Declaration)
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
Dear Sir, We declare that the ratings, performance figures and availability of the system furnished by us for subject Package covered under this specification are guaranteed by us. We further declare that in the event of any deficiencies in meeting the guarantees in respect of the characteristics mentioned below as established after conducting the factory test, you may at your discretion, reject or accept the equipment after assessing the liquidated damages as specified in the relevant clauses of Bid document. We note that in case we take any deviation regarding the maximum losses, as mentioned above, anywhere in the bid including Attachment-6 (Alternative, Deviations and Exceptions to Provisions), our bid shall be considered non –responsive in line with ITB clause 24.1(b) as modified in Section BDS.
Date -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-11
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Information regarding Ex-employees of POWERGRID in our Organisation)
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
We declare that we are aware of and have gone through the “Code of Business Conduct and Ethics for Senior Management Personnel”1 and “Code of Business Conduct and Ethics for Board Members”1 of POWERGRID (hereinafter referred to as the “Code of Conduct”). We further understand that as per the “Code of Conduct”, Senior Management Personnel including Board Members, who have retired/resigned from POWERGRID, shall not accept any appointment or post, as detailed in the referred “Code of Conduct”, within 1 year from the date of cessation of service/directorship unless approved by the Competent Authority. Accordingly, we hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation*
*In case the date of joining in the bidder’s organization of such ex-employee is within 1 year from the date of retirement/resignation from POWERGRID, No Objection Certificate/ approval from the Competent Authority must be furnished along with the bid or subsequent through clarification pursuant to ITB Clause 21.
In case of non-submission of No Objection Certificate/approval of the Competent Authority, as required, We understand that POWERGRID shall deal with such cases as per its Policy and procedures in vogue, which may also result in rejection of our bid. We also confirm that POWERGRID shall be the sole judge in this regard. We further declare that any misrepresentation or submission of false/forged documents/information in this regard shall be dealt with as per the provisions of the Integrity Pact and/or the Bidding Documents and/or POWERGRID’s policy and procedures.
Date : -- Printed Name :
Place : Designation :
Note: 1. “Code of Business Conduct and Ethics for Senior Management Personnel” and “Code of Business Conduct and Ethics for Board Members” are available on POWERGRID’s website https://www.powergridindia.com. 2. The information in similar format should be furnished for each partner of joint venture in case of joint venture bid. 3. In case bidder has furnished no details on ex-employees of POWERGRID or has left blank or has indicated ‘-‘ against the same, it shall be deemed that they have not employed any such person in their organization.
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-11
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract & Materials
Name : Ram Lal Power Grid Corporation of India Ltd.,
Address : G5 Northern Region-I, Reagional Headquarter
Gurgaon SCO Bay No. 5 to 10, Sector- 16 A
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-11
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract & Materials
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region-I, Reagional Headquarter
SCO Bay No. 5 to 10, Sector- 16 A
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 ATTACHMENT-12
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Price Adjustment Data)
Bidder’s Name and Address (Sole Bidder) : To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
0 Faridabad-121002
We hereby furnish the relevant details pertaining to the price adjustment provisions for your specifications and documents . The necessary documentary evidence is enclosed.
Sl. No. Name of Materials/Labour Value of co-efficient Name of the published index Value of index as 30 days prior to date set for opening of bids
In accordance with Clause 2, Appendix-2, Form of Contract Agreement, Section-VI; Forms. Volume-I
PV Price Component
I. Supply and Placement of Reinforcement Steel:
i) A- WPI-HSD 0.10 Wholesale Price Index Number for `HSD’(Individual Commodity) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) B-WPI-Baic Metals 0.65 Wholesale Price Index Number for `Manufacture of Basic Metals’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
iii) LabourL= 0.05 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
i) A- WPI-HSD 0.20 Wholesale Price Index Number for `HSD’(Individual Commodity) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) B-WPI-Cement,Lime and Plaster 0.3 Wholesale Price Index Number for `Manufacture of cement, lime and plaster’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in
C-WPI-Cutting ,Shaping and finishing Stone 0.2 Wholesale Price Index Number for `Cutting, shaping and finishing of stone’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
iii) LabourL= 0.1 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2001= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The Bidders are required to estimate and indicate the values of different coefficients for each of the items in the price variation formulae within the specified range such that their summation is as specified in the Bidding Documents. Where no value or ‘-’ or ‘shall be furnished later’ is specified against the coefficient, the same will be deemed to be zero and the fixed component would be suitably adjusted. If the values of all coefficients in price variation formulae indicated by the Bidder are within the specified range but their sum exceeds the summation specified in the Bidding Documents, the values of the coefficients shall be pro-rata adjusted such that the summation remains as per the provisions of the Bidding Documents. If the values of all coefficients indicated by the Bidder are within the specified range but their summation is less than the value specified in the Bidding Documents, the values of the coefficients as indicated by the Bidder shall be considered as such and the fixed component in the price variation formulae would be suitably adjusted. Further, if any of values of the coefficients indicated by the Bidder is out of the range specified in the Bidding Documents, the lower of the values, as indicated by the Bidder vis-à-vis lower value of the range for that coefficient specified in the Bidding Documents, shall be considered and the fixed component would be suitably adjusted.
Prices are firm & Fixed
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-13
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Declaration regarding Social Accountability)
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-14
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
Integrity Pact is annexed herewith this Volume.
Date : -- Printed Name :
Place : Designation :
Instruction for printing & submitting Integrity Pact
1. The requisite format of Integrity Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Integrity Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (o).
Power Grid Corporation of India Limited
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai,New Delhi – 110016 hereinafter referred to as
having its Registered Office at
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for “Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 1 of 8
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation" Package and Specification Number NR1/NT/W-MISC/DOM/I00/23/12566 POWERGRID values full compliance with all relevant laws and regulations, and the principles of economical use of resources, and of fairness and transparency in its relations with its Bidders/ Contractors.
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Integrity Pact' which will form a part of the bid.
It is hereby agreed by and between the parties as unde r:
Section I - Commitments of POWERGRID
(1) POWERGRID commits itself to take all measures necessary to prevent corruption and to observe the following principles :
a) No employee of POWERGRID, personally or through family members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for him/herself or third person, any material or other benefit which he/she is not legally entitled to.
b) POWERGRID will, during the tender process treat all Bidder(s) with equity and fairness. POWERGRID will in particular, before and during the tender process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/ additional information through which the Bidder(s) could obtain an advantage in relation to the tender process or the contract execution.
c) POWERGRID will exclude from evaluation of Bids its such employee(s) who has any personnel interest in the Companies/Agencies participating in the Bidding/Tendering process.
(2) If Chairman and Managing Director obtains information on the conduct of any employee of POWERGRID which is a criminal offence under the relevant Anti-Corruption Laws of India, or if there be a substantive suspicion in this regard, he will inform its Chief Vigilance Officer and in addition can initiate disciplinary actions under its Rules.
Section II - Commitments of the Bidder/Contractor
(1) The Bidder/Contractor commits himself to take all measures necessary to prevent corruption. He commits himself to observe the following principles during his participation in the tender process and during the contract execution :
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 2 of 8
a) The Bidder/Contractor will not, directly or through any other person or firm, offer, promise or give to POWERGRID, or to any of POWERGRID's employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which he/she is not legally entitled to, in order to obtain in exchange an advantage during the tender process or the execution of the contract.
b) The Bidder/Contractor will not enter into any illegal agreement or understanding, whether formal or informal with other Bidders/Contractors. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or actions to restrict competitiveness or to introduce cartelization in the bidding process.
c) The Bidder/Contractor will not commit any criminal offence under the relevant Anti-corruption Laws of India; further, the Bidder/Contractor will not use for illegitimate purposes or for purposes of restrictive competition or personal gain, or pass on to others, any information provided by POWERGRID as part of the business relationship, regarding plans, technical proposals and business details, including information contained or transmitted electronically.
d) The Bidder/Contractor of foreign origin shall disclose the name and address of the Agents/representatives in India, if any, involved directly or indirectly in the Bidding. Similarly, the Bidder/Contractor of Indian Nationality shall furnish the name and address of the foreign principals, if any, involved directly or indirectly in the Bidding.
e) The Bidder/Contractor will, when presenting his bid, disclose any and all payments he has made, or committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract and/or with the execution of the contract.
f) The Bidder/Contractor will not misrepresent facts or furnish false/forged documents/informations in order to influence the bidding process or the execution of the contract to the detriment of POWERGRID.
(2) The Bidder/Contractor will not instigate third persons to commit offences outlined above or be an accessory to such offences.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 3 of 8
Section III- Disqualification from tender process and exclusion from future contracts
(1) If the Bidder, before contract award, has committed a serious transgression through a violation of Section II or in any other form such as to put his reliability or credibility as Bidder into question, POWERGRID may disqualify the Bidder from the tender process or terminate the contract, if already signed, for such reason.
(2) If the Bidder/Contractor has committed a serious transgression through a violation of Section II such as to put his reliability or credibility into question, POWERGRID may after following due procedures also exclude the Bidder/Contractor from future contract award processes. The imposition and duration of the exclusion will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder/Contractor and the amount of the damage. The exclusion will be imposed for a minimum of 12 months and maximum of 3 years.
(3) If the Bidder/Contractor can prove that he has restored/recouped the damage caused by him and has installed a suitable corruption prevention system, POWERGRID may revoke the exclusion prematurely.
Section IV - Liability for violation of Integrity Pact
(1) If POWERGRID has disqualified the Bidder from the tender process prior to the award under Section III, POWERGRID may forfeit the Bid Guarantee under the Bid.
(2) If POWERGRID has terminated the contract under Section III, POWERGRID may forfeit the Contract Performance Guarantee of this contract besides resorting to other remedies under the contract.
Section V- Previous Transgression
(1) The Bidder shall declare in his Bid that no previous transgressions occurred in the last 3 years with any other Public Sector Undertaking or Government Department that could justify his exclusion from the tender process.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 4 of 8
(2) If the Bidder makes incorrect statement on this subject, he can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason.
Section VI - Equal treatment to all Bidders / Contractors
(1) POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
(2) POWERGRID will disqualify from the tender process any bidder who does not sign this Pact or violate its provisions.
Section VII - Punitive Action against violating Bidders / Contractors
If POWERGRID obtains knowledge of conduct of a Bidder or a Contractor or his subcontractor or of an employee or a representative or an associate of a Bidder or Contractor or his Subcontractor which constitutes corruption, or if POWERGRID has substantive suspicion in this regard, POWERGRID will inform the Chief Vigilance Officer (CVO).
(*)Section VIII - Independent External Monitor/Monitors
(1) POWERGRID has appointed a panel of Independent External Monitors (IEMs) for this Pact with the approval of Central Vigilance Commission (CVC), Government of India, out of which one of the IEMs has been indicated in the NIT/IFB.
(2) The IEM is to review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement. He has right of access to all project documentation. The IEM may examine any complaint received by him and submit a report to Chairman-cum-Managing Director, POWERGRID, at the earliest. He may also submit a report directly to the CVO and the CVC, in case of suspicion of serious irregularities attracting the provisions of the PC Act. However, for ensuring the desired transparency and objectivity in dealing with the complaints arising out of any tendering process, the matter shall be referred to the full panel of IEMs, who would examine the records, conduct the investigations and submit report to Chairman-cum-Managing Director, POWERGRID, giving joint findings.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 5 of 8
(3) The IEM is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He reports to the Chairman-cum-Managing Director, POWERGRID.
(4) The Bidder(s)/Contractor(s) accepts that the IEM has the right to access without restriction to all documentation of POWERGRID related to this contract including that provided by the Contractor/Bidder. The Bidder/Contractor will also grant the IEM, upon his request and demonstration of a valid interest, unrestricted and unconditional access to his documentation. The same is applicable to Subcontractors. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.
(5) POWERGRID will provide to the IEM information as sought by him which could have an impact on the contractual relations between POWERGRID and the Bidder/Contractor related to this contract.
(6) As soon as the IEM notices, or believes to notice, a violation of this agreement, he will so inform the Chairman-cum-Managing Director, POWERGRID and request the Chairman-cum-Managing Director, POWERGRID to discontinue or take corrective action, or to take other relevant action. The IEM can in this regard submit non-binding recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. However, the IEM shall give an opportunity to POWERGRID and the Bidder/Contractor, as deemed fit, to present its case before making its recommendations to POWERGRID.
(7) The IEM will submit a written report to the Chairman-cum-Managing Director, POWERGRID within 8 to 10 weeks from the date of reference or intimation to him by POWERGRID and, should the occasion arise, submit proposals for correcting problematic situations.
(8) If the IEM has reported to the Chairman-cum-Managing Director, POWERGRID, a substantiated suspicion of an offence under relevant Anti-Corruption Laws of India, and the Chairman-cum-Managing Director, POWERGRID has not, within the reasonable time taken visible action to proceed against such offence or reported it to the CVO, the Monitor may also transmit this information directly to the CVC, Government of India.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 6 of 8
(9) The word ‘IEM’ would include both singular and plural.
(*) This Section shall be applicable for only those packages wherein the IEMs have been identified in Section – I : Invitation for Bids and/or Clause ITB 9.3 in Section – III: Bid Data Sheets of Conditions of Contract, Volume-I of the Bidding Documents.
Section IX - Pact Duration
This Pact begins when both parties have legally signed it. It expires for the Contractor after the closure of the contract and for all other Bidder's six month after the contract has been awarded.
Section X - Other Provisions
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact.
(2) Changes and supplements as well as termination notices need to be made in writing.
(3) If the Contractor is a partnership firm or a consortium or Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venture partners.
(4) Nothing in this agreement shall affect the rights of the parties available under the General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
(5) Views expressed or suggestions/submissions made by the parties and the recommendations of the CVO/IEM# in respect of the violation of this agreement, shall not be relied on or introduced as evidence in the arbitral or judicial proceedings (arising out of the arbitral proceedings) by the parties in connection with the disputes/differences arising out of the subject contract.
# CVO shall be applicable for packages wherein IEM are not identified in Section IFB/BDS of Condition of Contract, Volume-I. IEM shall be applicable for packages wherein IEM are identified in Section IFB/BDS of Condition of Contract, Volume-I.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Integrity Pact Page 7 of 8
(6) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 2 : Witness 2 :
Designation : Designation :
Integrity Pact Page 8 of 8
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-15
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
Option for Initial Advance (either Interest Bearing Initial Advance or No Initial Advance) and Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
I We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1. Name of the Supplier/ Contractor in whose favour payment is to be made 0
2. Address with PIN Code and State
Registered Office:
Correspondence Address:
3. (a) Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
3. (b) Are you a MSE owned by SC/ST* entrepreneurs in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012 including subsequent amendment/notification/order (Indicate Yes/No) Note: Documentary evidence is to be attached. Please refer remarks at the end of the attachment. Yes
3. (c ) If 3(b) is ‘Yes’ please mention whether you are (Proprietary MSE/ Partnership MSE/ Private Limited Company) owned by SC/ST entrepreneurs
3. (d ) Are you a MSE owned by women in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012, Public Procurement Policy for Micro and Small Enterprises (MSEs) Amendment order 2018 including subsequent amendment/notification/order (Indicate Yes/No) Note: Documentary evidence is to be attached.
4. Permanent Account (PAN) No.
5. GSTIN Numbers
I. GSTIN in the Sates/UT from where the supply of goods take place
Name of the States/UT GSTIN number
II. GSTIN in the States/UT where the supply for services take place (states where sites under the subject package is situated)
Name of the States/UT GSTIN number
6 PF Registration No. of the Company
7 PF Regional Office covered (with Address)
8 Name of Contact Person
9 Contact Details
10 Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account:
Type of Account: Current Account
11 9 digit MICR code printed at bottom in middle, next to cheque no.
12 IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
*The definition of MSEs owned by SC/ST is as given under:
a. In case of proprietary MSE, proprietor(s) shall be SC /ST.
b. In case of partnership MSE, the SC/ST partners shall be holding at least 51% shares in the unit.
c. In case of Private Limited companies, at least 51% share shall be held by SC/ST promoters.
Documentary evidence: Please provide scanned copy(ies) of the SC/ST certificate(s) issued by District Authority as applicable for SC/ST MSE category as per (a), (b) or (c) above.
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-16
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Additional Information)
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
In support of the additional information required as per ITB Sub-Clause 9.3 (p) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):
1.0 The Bidder shall furnish
A certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3(p)(i)]
1.1 In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of the Bidder (Sole Bidder) 0
Name of the Banker by whom certificate issued
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
1.2 The Bidder should accordingly also provide the following information/documents
(i) Details of Banker:
Address of Banker
Contact Name and Title
(ii) As per para 1.0, Authorization Letter(s) from the bidder (in case of JV bidder, from all the partners) addressed to the Banker(s), authorizing POWERGRID to seek queries about the bidder with the Banker(s) and advising the Banker(s) to reply the same promptly, is/are enclosed as per following details:
Sl. No. Letter Ref. Date Addressed to (name of the Bank)
2.0 Litigation History
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid. [Reference ITB clause 9.3(p)(ii)]
2.1 Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
3.0 Details regarding previous transgressions of Integrity Pact
The bidder should provide detailed information on any transgression of Integrity Pact that occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country.
3.1 Details regarding previous transgressions of Integrity Pact that occurred in the last 10 years
Year Name of client Details of Transgression of Integrity Pact by the bidder
4.0 OTHER INFORMATION
4.1 Current Contract Commitments of works in progress
Bidders (individual firms or each partners of JV) should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
4.2 Financial Data:
Details Actual (Previous five years) Projection for next five years
Total Liability
Current Liability
Profit before taxes
Profit after taxes
5.0 Details of Provident Fund Code Number of the Bidder [ref. ITB9.3(q)]
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-17
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Declaration for tax exemptions, reductions, allowances or benefits)
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 B9, Qutab Institutional Area, Katwaria Sarai
0 New Delhi-110016
1 We confirm that we are solely responsible for obtaining following tax exemptions, reductions, allowances or benefits in respect of supplies under the subject package, in case of award. We further confirm that we have considered the same in our bid thereby passing on the benefit to POWERGRID while quoting our prices. In case of our failure to receive such benefits, partly or fully, for any reason whatsoever, the Employer will not compensate us.
2 We are furnishing the following information required by the Employer for issue of requisite certificate if and as permitted in terms of the applicable Govt. of India policies/procedures (in case of award):
Applicable Act, Notification No. and Clause Ref. No. Sl. No. Description of item on which applicable Country of origin Remarks, if any
(The requirements listed above are as per current Notification of Govt. of India indicated above. These may be modified, if necessary, in terms of the Notifications.)
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-17
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract & Materials
Name : …… ……. …….. …… ……. …….. Power Grid Corporation of India Ltd.,
Address : …… ……. …….. …… ……. …….. B9, Qutab Institutional Area, Katwaria Sarai
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-17
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract & Materials
Name : Power Grid Corporation of India Ltd.,
Address : B9, Qutab Institutional Area, Katwaria Sarai
New Delhi-110016
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-18
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
Safety Pact is attached herewith this Volume
Date : -- Printed Name :
Place : Designation :
Instruction for printing & submitting Safety Pact
1. The requisite format of Safety Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other six pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Safety Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (s).
Between #REF! #REF!
Power Grid Corporation of India Limited #REF! #REF!
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as #REF! #REF!
"POWERGRID", #REF! #REF!
0 1 having its Registered Office at ,
having its Registered Office at ,, 1 AND
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for “Construction of balance work of Transit camp at POWERGRID Jaipur south substation" Specification Number:NR1/NT/W-MISC/DOM/I00/23/12566
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Safety Pact Page 1 of 6
POWERGRID values full compliance with all relevant laws and regulations and the principles of Safety, Health& Environment in its relations with its Bidders/ Contractors.
In order to achieve these goals, POWERGRID and the above named Bidder / Contractor enter into this agreement called “Safety Pact” which will form part of the Bid.
It is hereby agreed by and between the parties as under:
Section I - Commitments of POWERGRID
POWERGRID commits itself to take all measures necessary to prevent accidents duringConstruction and Operation of the Transmission Assets and to observe the following:
1. POWERGRID recognizes and accepts its statutory responsibilities for ensuring construction, operation and maintenance of equipments and for the provision of safe methods of work and safe working conditions.
2. POWERGRID recognizes and accepts its statutory responsibilities for ensuring safety of not only its employees but also that of the Contracting Agencies as Principal Employer.
3. POWERGRID shall review the accidents in a structured manner and take necessary actions to ensure that the safety criteria are strengthened for safe construction as well as Operation & Maintenance of the Transmission Assets.
4. POWERGRID shall conduct necessary awareness and training programmes to its Employees to augment the various safety requirements to be followed during Construction and Operation & Maintenance of the Transmission Assets from time to time.
5. POWERGRID shall, from time to time, issue necessary guidelines,instructions and deterrents to its employees as well as to the Contracting Agencies, to update them to take necessary preventive measures to avoid repetition of similar accident attributes.
6. POWERGRID shall review and provide necessary guidanceto the Contracting Agencies, as and when, any abnormality / special situations are brought to its notice by the Contracting Agencies during execution of the Transmission Projects being executed by them.
7. POWERGRID shall conduct periodical surveillance site inspections / audits to identify the unsafe conditions and unsafe actions, and bring them to the knowledge of the Contracting Agencies for taking timely corrective actions.
8. POWERGRIDshall investigate all accidents, fatal as well as non-fatal, to identify the lapses, the reason for the accident / incident and suggest measures for prevention of recurrence of such accidents, and fix responsibility for the lapses leading to the accident.
9. POWERGRID shall augment the training to the workers and supervising personnel of the Contracting Agencies, as per schedules, upon nomination by the Contracting Agencies in reasonable time frame.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Safety Pact Page 2 of 6
10. POWERGRID shall exercise the right to claim and recover compensation from the Contracting Agencies in case of any violation of the safety requirements / provisions during execution of the Transmission Projects, as built in the applicable Laws and contractual specifications / guidelines in vogue / issued by POWERGRID from time to time.
Section II – Commitments of the Bidder / Contractor:
The Bidder / Contractor commits himself to take all measures necessary to prevent / minimise accidents at their construction / erection sites and to observe the following:
1. The Bidder / Contractor recognizes and acceptsthe statutory and comprehensive responsibility for ensuring safe construction and Testing & Commissioning in the Transmission Projects being executed by thembyproviding safe methods of work, working conditions and Tools & Plants for human safety.
2. The Bidder / Contractor recognizes and accepts the responsibilities for ensuring safety of not only their employees but also that of the Sub-contractors, Principal Employer and the general public during execution of the Transmission Projects / works.
3. The Bidder / Contractor shall review the accidents in a structured manner and take necessary actions to ensure that the safety criteria are strengthened for safe construction of the Transmission Assets.
4. The Bidder / Contractor shall endeavour continuous development of safe methods of work to ensure that the effect of risks and perils are minimised to the extent possible and implement the same at their worksites.
5. The Bidder / Contractor shall conduct periodical Training to their Employees as well as to that of theirSub-contractors for safety awareness during construction works being executed by them.
6. The Bidder / Contractor shall provide all requisite Tools & Plants required for the work and ensure their healthiness by periodical inspections / testing as required. Unhealthy and sub-standard Tools & Plants will be immediately removed from site as and when they are identified.
7. The Bidder / Contractor shall,at their cost, provide all necessary Personal Protective Equipments such as Double Lanyard Safety Belts, Appropriate Fall Arrest Systems, Safety Helmets, Foot Wear, Hand Gloves, etc., as required for various activities pertaining to execution of the Projects / works, confirming to relevant Indian Standards.
8. The Bidder / Contractor shall ensure that dedicated qualified Safety Officers are posted in the construction projects being executed by them and ensure that the Safety Officer visits each and every gang periodically and conducts audits / inspections to identify the unsafe conditions and unsafe actions, to be rectified by the site supervising personnel promptly.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Safety Pact Page 3 of 6
9. The Bidder / Contractor shall conduct appropriate medical checks-up for the workers before deploying them at their construction sites to ensure that only those who are medically fit are deployed in the Projects / works to be executed by them. The copy of the Medical Reports shall be provided by the Bidder / Contractor to POWERGRID, whenever requested by POWERGRID.
10. The Bidder / Contractor shall screen the workers before deploying them at their construction sites to ensure that only those with the skills, experience and competence to work at heightand also medically fitfor work at height are deployed for work at height in the Projects executed by them.
11. The Bidder / Contractor shall ensure daily before starting the work thattheir site Supervising Personnel / Safety Officer briefs the workers about the work for the day and the safety measures / precautions required to be taken by them.
12. The Bidder / Contractor shall investigate all the accidents at their working sites to ascertain the lapses leading to the incident and the precautionary / corrective measures required to be taken to avoid recurrence of such accidents. These accidents will be reviewed at the Board Management level of the Agencies and the findings / recommendations will be put up to POWERGRID Apex Safety Board within the stipulated period.
13. The Bidder / Contractor shall ensure that all accidents, whether fatal or non-fatal in nature, will be informed to POWERGRID, in writing, immediately on the occurrence of the same,and in any case, within not more than 24 hours of occurrence of the same.
14. The Bidder / Contractor shall ensure that in case of any accident, all necessary medical help / supportshall be provided to the victims / injured till they are completely fit to return to work.
15. The Bidder / Contractorshall ensure that in case of fatal accidents, all statutory Authorities, including Police, concerned Labour Dept. Officials, concerned Workmen Compensation Commissioner, etc., will be intimated in writing as required by the statutory Law, and followed up for compliance of all statutory obligations. The Bidder / Contractor shall own full responsibility of timely accident reporting to various authorities, including POWERGRID.
16. The Bidder / Contractor shall ensure that in case of fatality or serious injury leading to permanent disablement of the victims, the compensation amount will be deposited with the concerned authorities, as required by the Laws, and followed up for early disbursement to the beneficiaries of the victims.
17. The Bidder / Contractor assures that they shall co-operate to the fullest extent for carrying out any investigation of the accidents at their work sites by POWERGRID to identify the lapses, the reason for the accident / incident and suggest measures for prevention of recurrence of such accidents. All factual details of the occurrence of the accident will be provided to POWERGRID, as and when required.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Safety Pact Page 4 of 6
18. The Bidder / Contractor assures that they take full responsibility of meeting the statutory obligations in case of accidents, and in case of any reference by any Statutory Body at a later date also, they shall provide all information to POWERGRID and meet all the statutory obligations, including payment of additional compensation, if any.
19. The Bidder / Contractor assures that in case of any inspection of their work site or Notice by any Statutory Authority, they shall comply promptly and inform POWERGRID Site Officials of the same, and also provide all necessary information and assistance for smooth compliance of the observations / instructions of such Authorities.
20. The Bidder / Contractor accepts the provisions regarding safety, including payment of compensation to POWERGRID, in case of any violation of the safety requirements / provisions during execution of the Transmission Projects, as built in the Contractual Conditions, Safety Planand the Safety Pact, and confirm to abide by the same.
Section III – Equal treatment to all Bidders / Contractors:
1. POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
2. POWERGRID will disqualify, from the tender process, any bidder/ take punitive actions on the bidder, who does not sign this Pact or violate its provisions.
Section IV – Pact Duration:
This Pact begins when both parties have legally signed it. It expires for the successful Bidder / Contractor after closure of the contract and, for all other Bidders, after the contract has been awarded.
Section V – Other Provisions:
1. This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under the Safety Pact.
2. Changes and supplements need to be made in writing, which shall come into force only upon mutual agreement / acceptance.
3. If the Contractor is a partnership firm or consortium of Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venue partners, as applicable as per the Tender Specifications.
4. Nothing in this agreement shall affect the rights of the parties available under General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
5. Should one or several provisions of this agreement turn out to be invalid, the reminder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
Safety Pact Page 5 of 6
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Partner(s) of Joint Venture/ Contractor)
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 2 : Witness 2 :
Designation : Designation :
Safety Pact Page 6 of 6
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Attachment-19
“Construction of balance work of Transit camp at POWERGRID Jaipur south substation"
Bidder’s Name and Address To:
Contract & Materials
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Northern Region-I, Reagional Headquarter
0 SCO Bay No. 5 to 10, Sector- 16 A
Further, we hereby confirm that except as mentioned in the Attachment – 6 (Alternative, Deviations and Exceptions to the Provisions) hereof forming part of our First Envelope :
Date : -- Printed Name :
Place : Designation :
Specification No. :NR1/NT/W-MISC/DOM/I00/23/12566 Bid Form 1st Envelope 1 one 1 st 1 January
2 two 2 nd 2 February
BID FORM (First Envelope) 3 three 3 rd 3 March
4 four 4 th 4 April
Bid Proposal Ref. No. 5 five 5 th 5 May
Date : -- 6 six 6 th #VALUE! 6 June
7 seven 7 th #VALUE! 7 July
To: 8 eight 8 th #VALUE! 8 August
Contract & Materials 9 nine 9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 ten 10 th 10 October
Northern Region-I, Reagional Headquarter 11 eleven 11 th 11 November
SCO Bay No. 5 to 10, Sector- 16 A 12 twelve 12 th 12 December
13 thirteen 13 th
14 fourteen 14 th
Name of Contract : “Construction of balance work of Transit camp at POWERGRID Jaipur south substation" 15 fifteen 15 th
Dear Ladies and/or Gentlemen, Enter details here. 16 sixteen 16 th
1.0 Having examined the Bidding Documents, including Amendment Nos. ...[Enter the Amendment]… dated …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). ...[Enter the Amendment]… …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). 17 seventeen 17 th
1.1 We meet the eligibility requirements and have no conflict of interest in accordance with ITB Clause 2.
2.0 Attachments to the Bid Form (First Envelope) Bank Draft 18 eighteen 18 th
In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments: Enter details here. Pay Order 19 nineteen 19 th
or documentary evidence in support of exemption of Bid Security, in separate envelope in accordance with clause 21 of ITB, Section-II." Please note that if bid validity is less than 06 (six) months, your bid may be rejected
(b) Attachment 2() : A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. Bank Guarantee (0) 21 st
*Further the requisite deed of Joint Undertaking as per stipulated qualification requirement in Annexure-A (BDS) has also been furnished as per your format.
* Delete if not applicable
(c) Attachment 3() : The documentary evidence that we are eligible to bid in accordance with ITB Clause 2. Further, in terms of ITB Clause 9.3(c) & (e), the qualification data has been furnished as per your format enclosed with the bidding documents [Attachment – 3(QR)]. 22 th
Further, the required Joint Venture Agreement signed by us and our Partners has also been furnished as per your format Attachment-3(JV). #REF! Applicable 23 th
Further the required deed of Joint Undertaking signed by us and Tower Manufacturer has also been furnished as per your format. 0 #REF! Not Applicable 24 th
(d) Attachment 4() : The documentary evidence establishing in accordance with ITB Clause 3, Vol.-I of the Bidding Documents that the facilities offered by us are eligible facilities and conform to the Bidding Documents has been furnished as Attachment 4. A list of Special Tools & Tackles to be used by us for erection, testing & Commissioning and to be handed over to Employer, the cost of which is included is our Bid Price, is also enclosed as per your format as Attachment 4A. A list of Special Tools & Tackles to be brought by the contractor for erection, testing & Commissioning and to be taken back after completion of work, whose cost in not included in our bid price, is enclosed as per your format as Attachment 4B. 25 th
(e) Attachment 5() : The details of all major items of services or supply which we propose subletting in case of award, giving details of the name and nationality of the proposed subcontractor/sub-vendor for each item. 26 th
(f) Attachment 5A() : Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises. 26 th
(g) Attachment 6() : The variation and deviations from the requirements of the Conditions of Contract, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter alia, the cost of withdrawal of the variations and deviations indicated therein. 27 th
(h) Attachment 7() : The details of Alternative Bids made by us indicating the complete Technical Specifications and the deviation to contractual and commercial conditions. (Not Applicable) 28 th
(i) Attachment 8() : Manufacturer’s Authorisation Forms. 29 th
(j) Attachment 9() : Work Completion Schedule. 30 th
(k) Attachment 10() : Guarantee Declaration. 31 st
(l) Attachment 11() : Information regarding ex-employees of Employer in our firm.
(m) Attachment 12() : Filled up information regarding Price Adjustment Data as per the format enclosed in the bidding documents.
(n) Attachment 13() : Declaration regarding Social Accountability.
(o) Attachment 14() : Integrity Pact, in a separate envelope, duly signed on each page by the person signing the bid.
(p) Attachment 15() : Option for Initial Advance (either Interest Bearing Initial Advance or No Initial Advance) and Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
(q) Attachment 16() : Additional Information.
(r) Attachment 17() : Declaration for tax exemptions, reductions, allowances or benefits
(s) Attachment 18() : Safety Pact
(t) Attachment 19() : Declaration.
(u) Attachment 20() : Declaration of Key Managerial Person jointly with Power of Attorney holder
(v) Attachment 21() : Self certification regarding Minimum Local Content in line with PPP-MII order and MoP Order December 2018, if applicable
(w) Attachment 22() : Certificate from statutory auditor or cost auditor of the company (in the case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of Local Content, in line with PPP-MII order, and MoP Order December 2018, if applicable
(x) Attachment 23() : Declaration by the bidder regarding events encountered pursuant to ITB Clause 2.1
3.0 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
4.0 We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST, which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
4.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
5.0 Construction of the Contract
5.1 We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders
6.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) ITB 13 Bid Security
(b) GCC 2.14 Governing Law
(d) GCC 55 Terms of Payment
(e) GCC 8.3 Performance Security
(f) GCC 6 Taxes and Duties
(g) GCC 38 Liquidated Damages for Delay by Contractor
(h) GCC 40 Defect Liability
(i) GCC 39 Guarantee
(j) GCC 20.5 Patent & Royalties
(k) GCC 61 Limitation of Liability
(l) GCC 57 Settlement of Disputes
(m) GCC 59 Arbitration
(n) Appendix 2 to Form of Contract Agreement Price Adjustment
Further we understand that deviation taken in any of the above clauses by us may make our bid non-responsive as per provision of bidding documents and be rejected by you.
7.0 We undertake, if our bid is accepted, to commence the work immediately upon your Notification of Award to us, and to achieve the delivery of goods and related services within the time stated in the Bidding Documents.
8.0 If our bid is accepted, we undertake to provide a Performance Security in the form and amounts, and within the times specified in the Bidding Documents.
9.0 We agree to abide by this bid for a period of six (06) months from the date fixed for opening of bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
10.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
11.0 We understand that you are not bound to accept the lowest or any bid you may receive.
12.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions. 2
13.0 We are a Micro and Small Enterprise (MSE) registered with , a designated Authority of GoI under the Public Procurement Policy for MSEs order 2012. 2
14.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of 0
Date : -- Printed Name :
Place : Designation :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him
#REF! Printed Name :
#REF! Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
PRICE_SCHEDULE.xlsx
xlsx • 1.58 MB
~$ Section - II ITB SSTE civil(Feb 2019).docx
docx • 0.00 MB
~$-GCC-civil works(Feb 2019).doc
doc • 0.00 MB
~$-Section - I IFB SSTE Vol-I.docx
docx • 0.00 MB
~$-Section - III_BDS.docx
docx • 0.00 MB
~$-Section - VI Forms and Proceedures Vol-I.doc
doc • 0.00 MB
01-Section - I IFB SSTE Vol-I.docx
docx • 0.04 MB
02 Section - II ITB SSTE civil(Feb 2019).docx
docx • 0.11 MB
03-Section - III_BDS.docx
docx • 0.06 MB
04-Annexure-A(BDS)-QR.docx
docx • 0.02 MB
05-GCC-civil works(Feb 2019).doc
doc • 0.37 MB
06 Section - V SCC Civil Vol-I.docx
docx • 0.06 MB
07-Appendix -I to SCC.doc
doc • 0.17 MB
08-Appendix-II SCC.docx
docx • 0.04 MB
09-Section - VI Forms and Proceedures Vol-I.doc
doc • 0.29 MB
Thumbs.db
db • 0.02 MB
ARCHITECTURAL.pdf
pdf • 1.43 MB
SFQP.pdf
pdf • 2.22 MB
STRUCTURAL.pdf
pdf • 2.18 MB
01_1st Envelope-attachment.xlsx
xlsx • 1.43 MB
02-Attachment-14-IP.doc
doc • 0.07 MB
03_Attachment 12-KMP Declaration.doc
doc • 0.03 MB
04-Attachment-21- Affidavit for Self Certifictaion.docx
docx • 0.02 MB
06-Attachment -24_Declaration regarding events encountered.docx
docx • 0.03 MB
08 Attachment 21-Affidavit for correctness of information.docx
docx • 0.02 MB
09-Legends.pdf
pdf • 0.03 MB
Thumbs_1.db
db • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .