Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-Finance | ₹20.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹20.0 LRejected-Finance 3RD MILE SEVOKE ROAD SILIGURI 734001 | JALPAIGURI | WEST BENGAL | 734001 | ₹20.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹20.1 LRejected-Finance KOLBONG DARJEELING | JALPAIGURI | WEST BENGAL | 734001 | ₹20.1 L | L3 | Rejected-Finance L3 |
| 4 | L4₹20.3 LRejected-Finance LOWER KAFFER KALIMPONG | KALIMPONG | ₹20.3 L | L4 | Rejected-Finance L4 |
| 5 | L5₹20.4 LRejected-Finance | ₹20.4 L | L5 | Rejected-Finance L5 |
Tender Value
₹20.0 L
EMD Value
₹39,990
Closing Date
17 Jan 2026, 6:00 pmClosed
Executive Engineer, Kalimpong Engineering Division
Executive Engineer, Kalimpong Engineering Division
Emergent construction of protection wall below Pala Haat Shed under 42nd Constituency, Kalimpong Block I.
2025_GTA_981624_1
52/EE/KED/KPG/GTA/2025-26
Open Tender
CIVIL WORKS
90 days
Kalimpong
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,000
₹39,990
2 Mar 2026
1 Jan 2026
21 Jan 2026
2 Jan 2026
17 Jan 2026
2 Jan 2026
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
(II) Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety In ground floor
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.
Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge. [Rate provided is exclusive of the cost of stone boulders and sausage crate]
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.64 MB
Tendernotice_2.pdf
PDF • 2.02 MB
BOQ_2394207.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid