Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹14.7 L+₹8,928.36 (0.61%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹14.7 L+₹16,368.66 (1.12%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-uploaded documents is not as per e_Nit specifications | ||
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-uploaded documents is not as per e_Nit specifications |
Tender Value
₹14.9 L
EMD Value
₹29,760
Closing Date
2 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI ROOM
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Construction of TOlLET complex at PS Lower Seela Zone and BlockMAH0REDistt. REASl for the year 2025-26.
2026_RDPR_329376_1
e-NIT No. 301 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
REASl
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
MH 0515
₹29,760
21 Nov 2026
27 Oct 2026
3 Nov 2026
27 Oct 2026
2 Nov 2026
27 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :1 meter from cutting edge | 14.05 | cum | 592.9 | ₹8,330.25 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :1 meter from cutting edge | - | cum | 479.3 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) including all leads, lift and carriage complete | - | Cum | 4,828.5 | - |
| 4 | Providing & Laying in position cement concrete 1:3:6 (1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size) excluding the cost of centring and shuttering all works upto Plinth level Concrete 80% | - | Cum | 5,733.6 | - |
| 5 | Providing & Laying in position cement concrete 1:3:6 (1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size) excluding the cost of centring and shuttering all works upto Plinth level Boulders 20% | 3.3 | Cum | 937 | ₹3,092.1 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) including all leads, lift and carriage complete | - | Cum | 7,571.55 | - |
| 7 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | - | Cum | 1,455.65 | - |
| 8 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 7.71 | Cum | 2,793.8 | ₹21,540.2 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all leads, lift and carriage complete | - | Cum | 9,821.85 | - |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete including all leads, lift and carriage complete with TMT bars | - | KG | 123.2 | - |
stage.html
html • 0.04 MB
finance_1116215.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_1116215.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .