| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹19.9 L+₹20,347.55 (1.03%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L2₹19.9 L+₹20,347.55 (1.03%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹19.9 L
EMD Value
₹20,000
Closing Date
6 Nov 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AREA MANAGER UPSIC MORADABAD
AREA MANAGER UPSIC MORADABAD
Work For Construction of Special Repair of a Dilapidated Marriage Hall in Mohalla Laudhian Kachari wlla Bagh aaaunder Municipal CouncilChandausi of Sambhal and Construction of a Dall on The First Floor at Sambhal District Sambhal
2026_MSME_1203130_1
2067/UPSIC/MOR/2026-27
Open Tender
Civil Works
Percentage
120 days
MORADABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
AREA MANAGER UPSIC MORADABAD
₹20,000
18 Nov 2026
30 Oct 2026
6 Nov 2026
30 Oct 2026
6 Nov 2026
30 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Dismentling doors and window leaves excluding chawkhats including disposal of refuse as directed by Engineer-in-charge with in a distance of 60 mts. DSR No-5.12.2 | 19.23 | Sqm | 387.72 | ₹7,455.86 |
| 3 | Dismantling Reinforcement cement concrete including disposal of refuse as directed by Engineer-in-charge with in a distance of 60 mts. DSR No-15.3 | 16.8 | CUM | 2,738.73 | ₹46,010.66 |
| 4 | Dismentling B/W and and Stacking of dismanteld materials as directed by Engineer incharg with distance 60 mts ..complete item DSR-15.7.4 | 2.09 | CUM | 1,588.83 | ₹3,320.65 |
| 5 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubish to the dumping ground with in 50 mtr lead. | 390.08 | Sqm | 42.15 | ₹16,441.87 |
| 6 | E/W in excavation in foundation in ordinary soil lift upto 1.50 mt……….complete item.D.S.R No2.2.1 | 27 | CUM | 304.85 | ₹8,230.95 |
| 7 | Cement Concrete with 4 cm. Gauge approved stone aggregate ,fine sand &cement in proportion of 8:4:1 ……………..complete item. D.S.R No-4.1.8 | 1.44 | CUM | 5,253.42 | ₹7,564.92 |
| 8 | R.C.C Work with cement, approved coarse sand & 2cm gauge approved stone grit in proportion of 1:2:4 in Foundation work , but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centring and shuttering etc. and supply of all materials, labour,Tools & Plants etc. required for proper completion of the work including cost of binding ,DSRNo-5.1.3A | 6.08 | Cum | 6,481.21 | ₹39,405.76 |
| 9 | R.C.C Work with cement, approved coarse sand & 2cm gauge approved stone grit in proportion of 1:1.5:3 in Beam work , but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centring and shuttering etc. and supply of all materials, labour,Tools & Plants etc. required for proper completion of the work including cost of binding ,DSR No-5.1.3 | 17.77 | Cum | 6,619.52 | ₹1,17,628.87 |
| 10 | R.C.C Work with cement, approved coarse sand & 2cm gauge approved stone grit in proportion of 1:1.5:3 in Column , but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centring and shuttering etc. and supply of all materials, labour,Tools & Plants etc. required for proper completion of the work including cost of binding wire.DSRNo-5.1.2 | 5.68 | Cum | 6,976.09 | ₹39,624.19 |
| 11 | M.S (Tor steel or plain ) in plain work such as R.C.C or R.B work including cutting / bending for proper shape as necessary including supply of all steel & wastage ,bend ,hook & authorised overlapping shall be measured … complete item. DSRNo-5.22.1 | 28.99 | Qtl. | 8,259.56 | ₹2,39,444.64 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_2277644.xls
BOQ • 0.30 MB
2067.pdf
Additional Documents • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .