| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.9 LAdmitted-Fee/PreQual/Technical/Finance BHARATPUR | RAJASTHAN | 321001 | -33.16% | ₹32.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹37.9 LAdmitted-Fee/PreQual/Technical/Finance | -23.01% | ₹37.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹45.5 LAdmitted-Fee/PreQual/Technical/Finance | -7.50% | ₹45.5 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹49.2 L
EMD Value
₹98,333
Closing Date
5 Aug 2026, 6:00 pmClosed
EE WRD I BHILWARA
EE WRD I BHILWARA
Renovation Work of Bihada Anicut G.P. - Bihada Teh Jahazpur Dist. Bhilwara
2026_WRDAS_578419_1
NIT-03/26-27/1428/WRD-I/BHL
Open Tender
Civil Works
Percentage
180 days
BHILWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
AS NIT CONDITIONS
₹98,333
Yes
6 Aug 2026
28 Jul 2026
6 Aug 2026
28 Jul 2026
5 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.(b) Thick | 3,000 | sqm | 2.5 | ₹7,500 |
| 2 | Dismantling old plaster or skirting, racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 m lead, inclusive of de-watering wherever required.(poor Quality) | 506 | sqm | 20 | ₹10,120 |
| 3 | Demolishing stone rubble masonry including stacking of useable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required. (Poor Quality) | 16.49 | Cum | 489 | ₹8,063.61 |
| 4 | Dismantling cement concrete including disposal of material within50 m lead, inclusive of de-watering wherever required. | 40.01 | Cum | 646 | ₹25,846.46 |
| 5 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect (b)Hard/Dense soil | 85.57 | cum | 79 | ₹6,760.03 |
| 6 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect (c) Hard soil mixed with Kankar/ boulders, morrum | 128.36 | cum | 99 | ₹12,707.64 |
| 7 | Excavation including loading, unloading, disposal and dressing of excavated rock within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect ( a) Soft/ Disinegrated rock | 71.31 | cum | 134 | ₹9,555.54 |
| 8 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto (d) 20 mm | 74.52 | cum | 4,818 | ₹3,59,037.36 |
| 9 | Random rubble stone masonry (using R.R. stones where 75% stones to be not less than 15cm in size in any direction and weighing not less than 23Kg) for foundation including curing all leads of construction materials, & all taxes and with initial lift / delift of 5m from ground level etc. complete. In Cement Sand Mortar 1:6 | 17.55 | cum | 4,357 | ₹76,465.35 |
| 10 | Random rubble stone masonry (using R.R. stones where 75% stones to be not less than 15cm in size in any direction and weighing not less than 23Kg) for foundation including curing all leads of construction materials, & all taxes and with initial lift / delift of 5m from ground level etc. complete. for super structure In Cement Sand Mortar 1:6 | 12.69 | cum | 4,547 | ₹57,701.43 |
stage.html
html • 0.02 MB
finance_1027973.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.47 MB
Tendernotice_2.pdf
PDF • 0.67 MB
BOQ_1027973.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].