| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.7 LAccepted-Finance 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 1 | Accepted-Finance satisfied | |
| 2 | 2₹7.1 L+₹44,056 (6.60%)Accepted-Finance PLOT NO 41 T H ROAD KESAVAPURAM MINJUR 601 203 | THIRUVALLUR | TAMIL NADU | 601203 | 2 | Accepted-Finance satisfied | |
| 3 | 3₹19.1 L+₹12.4 L (185.7%)Accepted-Finance 7TH FLOOR FLAT NO 02 UNITY ENCLAVE BLOCK C MEDAVAKKAM ROAD MAMBAKKAM 600 127 | CHENGALPATTU | TAMIL NADU | 600127 | 3 | Accepted-Finance satisfied |
| Sl No | Description | Qty | Unit | SRI V M A ENTERPRISES L1 | SHARTHI TECKMA CONTRACTS L2 | AGARTHI ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Overhauling of Turbine Lub Oil Cooler Booster Pump
Decoupling the pump, disconnection of the pump from suction and discharge pipe flanges ,dismantling of bearing housings &bearing at DE & NDE and their inspection & changing the bearings if necessary (Bearing will be supplied by TNPGCL) | 2 | Nos | 13,486 ₹26,972 Lowest | 14,080 ₹28,160 | 38,532 ₹77,064 |
| 2.00 | Dismantling of Glands from DE & NDE stuffing box, inspection of gland sleeves and replacing if necessary. Opening of top cover of split casing, dismantling of rotor, inspection and measurement of wear rings, renewal of parts if required. Renewal of Gaskets & Gland ropes. Reassembling and positioning of the rotor and closing of top casing . (Necessary spares will be provided by the TANPGCL) | 2 | Nos | 13,486 ₹26,972 Lowest | 14,080 ₹28,160 | 38,532 ₹77,064 |
| 3.00 | Reconditioning of Pump Top, Bottom Casing & Casing Rings etc., grinding the eroded portions of the casing ring assembly seating areas and other eroded areas in the top & Bottom casings, and casing wear rings and Welding with suitable special electrodes after preheating the casing and rings as per requirement. Dismantling the Suction Strainer from the strainer well, cleaning the strainer, reconditioning the strainer basket if required & renewal of strainer well top cover ‘O’ ring. (Welding Electrodes will be provided by the BOARD) | 2 | Nos | 11,117 ₹22,234 Lowest | 11,660 ₹23,320 | 31,764 ₹63,528 |
| 4.00 | Checking and correcting the pump alignment with motor and rechecking of pump alignment after connecting the suction & discharge flanges with renewed gaskets. Inspection of couplings, coupling pads and replacing if necessary, Coupling the pump with motor, connecting the pump from suction and discharge pipe flanges, and other such works required for efficient operation of the pump and commissioning. Cleaning & painting the complete pump assembly & Base structure, Painting inside the pump casings and suction strainer well inside area, also the connected pipelines and painting of the pump base concrete structure with Oil Distemper. | 2 | Nos | 15,141 ₹30,282 Lowest | 15,939 ₹31,878 | 43,260 ₹86,520 |
| 5.00 | Overhauling of Hydrogen Cooler Booster Pump
Decoupling the pump, disconnection of the pump from suction and discharge pipe flanges, draining the lub oil from the sump, Dismantling of Suction strainer top cover and the strainer. | 2 | Nos | 6,154 ₹12,308 Lowest | 6,490 ₹12,980 | 17,583 ₹35,166 |
| 6.00 | Dismantling of the Bearing Covers, Bearing Bracket, Bearing Bracket Lantern, splash ring, Dismantling of mechanical Seal, shaft sleeve and dismantling of the casing cover from the volute casing etc., | 2 | Nos | 9,603 ₹19,206 Lowest | 10,120 ₹20,240 | 27,438 ₹54,876 |
| 7.00 | Dismantling the impeller Assembly from the Volute Casing, Inspection and reconditioning the eroded portions of the casings if required, Inspection, Checking measurements and tolerances of the impeller, shaft, impeller wearing ring, casing ring and neck ring and replace all the above if necessary including machining of the wearing rings to the required size and assembling with the impeller suitably | 2 | Nos | 9,953 ₹19,906 Lowest | 10,890 ₹21,780 | 28,437 ₹56,874 |
| 8.00 | Reassembling and positioning of the rotor assembly and closing of casing cover, reassembling the mechanical seals after inspection and replacement of the spares & sleeves, Assembling the splash ring, Bearing Bracket Lantern, Bearing Bracket, Bearings, Bearing Covers and assembling the half coupling in shaft | 2 | Nos | 9,603 ₹19,206 Lowest | 10,560 ₹21,120 | 27,438 ₹54,876 |
| 9.00 | Checking and correcting the pump alignment with motor and connecting of pump flanges with renewed gaskets. Inspection of couplings, coupling pads and replacing if necessary, coupling the pump with motor, connecting the pump from suction and discharge pipe flanges, and other such works required for efficient operation of the pump and commissioning. Cleaning & painting the complete pump assembly & Base structure, Painting inside the pump casings and suction strainer well inside area, also the connected pipelines and painting of the pump base concrete structure with Oil Distemper (paint under Contractor Scope) | 2 | Nos | 20,051 ₹40,102 Lowest | 21,516 ₹43,032 | 57,288 ₹1,14,576 |
| 10.00 | Overhauling of Hydrazine Dozing Pump
Decoupling the motor and the liquid well assembly, Draining the oil from the pump, dismantling the speed reduction assembly, dismantling the plunger and the pump bodies and connected flanges. | 2 | Nos | 2,402 ₹4,804 Lowest | 2,728 ₹5,456 | 6,864 ₹13,728 |
Tender Value
Refer Docs
EMD Value
₹6,500
Closing Date
9 Sept 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I TM Unit III Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps Phosphate Dozing Pumps and Heater drip Pumps during AOH of 2026 27
2026_EB_701037_1
CE / MTPS-I / SE / M-I / TM /OT.29 / 2026-27
Open Tender
Power/Energy Projects/Products
Works
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹6,500
Yes
18 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
9 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Overhauling of Turbine Lub Oil Cooler Booster Pump
Decoupling the pump, disconnection of the pump from suction and discharge pipe flanges ,dismantling of bearing housings &bearing at DE & NDE and their inspection & changing the bearings if necessary (Bearing will be supplied by TNPGCL) | 2 | Nos | - | - |
| 2 | Dismantling of Glands from DE & NDE stuffing box, inspection of gland sleeves and replacing if necessary. Opening of top cover of split casing, dismantling of rotor, inspection and measurement of wear rings, renewal of parts if required. Renewal of Gaskets & Gland ropes. Reassembling and positioning of the rotor and closing of top casing . (Necessary spares will be provided by the TANPGCL) | 2 | Nos | - | - |
| 3 | Reconditioning of Pump Top, Bottom Casing & Casing Rings etc., grinding the eroded portions of the casing ring assembly seating areas and other eroded areas in the top & Bottom casings, and casing wear rings and Welding with suitable special electrodes after preheating the casing and rings as per requirement. Dismantling the Suction Strainer from the strainer well, cleaning the strainer, reconditioning the strainer basket if required & renewal of strainer well top cover ‘O’ ring. (Welding Electrodes will be provided by the BOARD) | 2 | Nos | - | - |
| 4 | Checking and correcting the pump alignment with motor and rechecking of pump alignment after connecting the suction & discharge flanges with renewed gaskets. Inspection of couplings, coupling pads and replacing if necessary, Coupling the pump with motor, connecting the pump from suction and discharge pipe flanges, and other such works required for efficient operation of the pump and commissioning. Cleaning & painting the complete pump assembly & Base structure, Painting inside the pump casings and suction strainer well inside area, also the connected pipelines and painting of the pump base concrete structure with Oil Distemper. | 2 | Nos | - | - |
| 5 | Overhauling of Hydrogen Cooler Booster Pump
Decoupling the pump, disconnection of the pump from suction and discharge pipe flanges, draining the lub oil from the sump, Dismantling of Suction strainer top cover and the strainer. | 2 | Nos | - | - |
| 6 | Dismantling of the Bearing Covers, Bearing Bracket, Bearing Bracket Lantern, splash ring, Dismantling of mechanical Seal, shaft sleeve and dismantling of the casing cover from the volute casing etc., | 2 | Nos | - | - |
| 7 | Dismantling the impeller Assembly from the Volute Casing, Inspection and reconditioning the eroded portions of the casings if required, Inspection, Checking measurements and tolerances of the impeller, shaft, impeller wearing ring, casing ring and neck ring and replace all the above if necessary including machining of the wearing rings to the required size and assembling with the impeller suitably | 2 | Nos | - | - |
| 8 | Reassembling and positioning of the rotor assembly and closing of casing cover, reassembling the mechanical seals after inspection and replacement of the spares & sleeves, Assembling the splash ring, Bearing Bracket Lantern, Bearing Bracket, Bearings, Bearing Covers and assembling the half coupling in shaft | 2 | Nos | - | - |
| 9 | Checking and correcting the pump alignment with motor and connecting of pump flanges with renewed gaskets. Inspection of couplings, coupling pads and replacing if necessary, coupling the pump with motor, connecting the pump from suction and discharge pipe flanges, and other such works required for efficient operation of the pump and commissioning. Cleaning & painting the complete pump assembly & Base structure, Painting inside the pump casings and suction strainer well inside area, also the connected pipelines and painting of the pump base concrete structure with Oil Distemper (paint under Contractor Scope) | 2 | Nos | - | - |
| 10 | Overhauling of Hydrazine Dozing Pump
Decoupling the motor and the liquid well assembly, Draining the oil from the pump, dismantling the speed reduction assembly, dismantling the plunger and the pump bodies and connected flanges. | 2 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_842602.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .