| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹41.9 LAccepted-AOC | 1 | Accepted-AOC Awarded | |
| 2 | 2₹43.6 L+₹1.7 L (4.07%)Rejected-Finance | 2 | Rejected-Finance Financial rejected |
Tender Value
₹39.8 L
EMD Value
₹80,000
Closing Date
18 Jun 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
XEN PWD Jhajjar
XEN PWD Jhajjar
Widening and strengthening on Chabili to Patasani road in Jhajjar District (Road ID 8472) (Reinvited)
2020_HRY_130236_1
PWD/JJR/Chabili to PAtasani
Open Tender
Civil Works
Works
90 days
Jhajjar
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
Public Work (B and R) Department
₹80,000
Yes
19 Jan 2021
1 Jun 2020
19 Jun 2020
1 Jun 2020
18 Jun 2020
1 Jun 2020
120 days
Amount
Milling of distress bituminous layer upto 20mm depth in a single pass with suitable milling machine (capable of milling @ 200-300 sqm area per Hr.) fitted with loading conveyor for loading the milled material directly on the trucks i/c hauling and stock piling the reclaimed material near the central recycling plant or reclaiming to bring to required specification to reuse with the approval of Engineer-in-Charge for safe disposal with all leads and lifts complete in all respects. Note I:- The unutilized quantity of reclaimed bituminous mix material shall be a recovery item as mention in BOQ item No. 34.
Earth work in excavation in ordinary soil exclusive of compensation of earth. Kassi work undressed involving an average horizontal throw upto 2 meters, and an average vertical lift upto 0.5 meter including breaking of clods. Excavated earth may be reused on berms and disposed off surplus earth with all lead and lift including dressing complete in territorial as per direction of Engineer-in-charge will be incidental to work and nothing will be paid. (NS)
Preparation of sub grade, including trenching, rough dressing of spoil, final dressing of earth, to given levels and camber, watering rolling with road roller, and compacting the bed. (HSR 24.1) Note: - In widening portion sub grade will be prepared with the use of Baby roller (HSR 24.1) or width of excavation should be made sufficient wide to accommodate road roller. Extra width required for compaction of sub grade shall not be paid and its expenditure shall be in incidental to the work
Dismantling Brick Work, Tile Masonry or Tile Lining and Tile Terracing (HSR 8.5i) dry brick work
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -9. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Providing & laying 75 mm thick (Compacted) stone metal (G-I) 63 to 45mm gauge wearing coat to Water Bound Macadam in layer of 75mm each using screening type 'B' compacting with 3 wheeled steel roller/vibratory roller to achieve the desired density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications of road & bridges (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respect. (N.S.) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing & laying 150 mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam in layer of 75mm using screening type ‘B’ compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S.) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing and laying first coat surface dressing, including rolling with road roller etc. complete including cost of bitumen VG-10 grade using aggregate 13mm nominal size 1.00 cum and bitumen VG-10, 0.10 MT per hundred square metre. Clause 509 of MoRT&H specification.(5th edition ) 2013 (NS).
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg. per sqm. On the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No.503 (5th edition) 2013 as per MoRT&H specification (N.S.)
Providing and laying 20mm thick premix carpet (PC) excluding cost of tack coat, with mixed material brought from Hot mix plant and laying with paver finisher and compacting with road roller to achieve specified value of compaction and direction of Engineer including cost of lighting arrangement, sign board and night watch, complete in all respect. i/c cost of Bitumen VG-10 grade as per clause 510 MoRT&H specification (5th edition) 2013 (NS). Note:- Before carrying out bituminous work, coating & Stripping of bitumen aggregate mix is to be performed in accordance with IS-6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti-stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and noting extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-Charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. Note:- Before laying PC on existing black top all cracks shall be sealed as MoRT&H specification (5th edition) clause No. 3004.3. which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2 and 3004.3.3 of MoRT&H specification (5th edition) 2013 respectively. Proper measurement and consumption shall be entered in MB for fog seal/ or crack filling/ or patch work but no payment on this account shall be made as fog seal/ or crack filling/ or patch work is/are incidental to work.
Providing and laying ‘B’ type seal coat with VG-10 grade bitumen excluding cost of tack coat, with mixed material brought from Hot mix plant and laying with paver finisher and compacting with road roller to achieve specified/desirable value of compaction as per direction of Engineer including cost of lighting arrangement, sign board and night watch, complete in all respect as per clause 511 and 510.1.3 of MoRT&H specification (5th edition) 2013 (NS).
Providing & erecting OVERHEAD SIGNS gantry supported M.S. pipe structure complete as per drawings, Technical Specifications and as directed by Engineer-in-Charge including consturction R.C.C. foundation for providing of M.S. Tubular structure for Cantilever signage at given site as per drawing enclosed. The C.C. mix to be in ratio of 1:1½:3 (RCC 1:1½:3) and that of lean to be ratio of 1:3:6 the work will be carried out as per the instructions of Engineer-In-Charge. Note :- Foundation including reinforcement etc. as per drawing. Cantilever over head sign Gantry (r-Type) frame / truss size - 3.05m x 1.525
Providing and fixing sign boards on the gantry size 3.05m x 1.525 m made out of retro-reflective sheeting of high intensity micro prismatic grade conforming to IRC:67 -2012 Type-IV standards fixed on 4mm thick Aluminum Composite Panels (ACP Sheet) as base board with pressure-senstive adhesive having 0.5mm thick Aluminum on both sides. The messages (legends, letters, numerals etc.) and boarders of Recto reflective boards shall be of cut letters made in transparent overlay film pasted over the base sheeting with pressure senstive adhesive or as insturcted by the manufacturers or as directed by the Engineer-in-Charge. Note-1) Work will be carried out as per MoRTH specification for road and bridges works (5th Revision) 2) Recto reflective sheeting of high intensity micro- prismatic grade conforming to IRC 67-2017 Type- IV standards shall be of Avery Dennision / 3M make only. 3.) Warrenty and Durability as per clause 801.3.11 of MoRTH specification 5th Revision will be applicable which is reproduced as under: The contractor shall obtain from the manufacturer a ten year warrenty for satisfactory field performance including stipulated retro-reflectance of the retro- reflective sheeting of micro prismatic sheeting and s seven year warrenty for high intensity grade and submit the same to the Engineer. The warrenty shall be inclusive of the screen printed or cut out letters / legends and their bonding to the recto reflective sheeting. The contractor / supplier shall also furnish the LOT numbers and certifications the the signs and materials supplied against the assigned work meets all the stipulated requirements and carrry the stipulated warrenty and that the contractor / suppliers is the authorized convertor of the particular sheeting. All signs shall be dated during fabrication with indelible marking to indicated the start of warrenty. The warrenty shall also cover the replacement obligation by the sheeting manufacturer as well as contractor for replacement/ repair / restoration of the recto- reflective effeciency. A certificate in original shall be given by the sheeting manufacturer that its offered recto- reflective sheeting has been tested for various paremeters such as co-efficient of retro- reflection, day / night time colour and luminance, shirinkage, flexibility, linear removal, adhesion, impact resistance, specular gloss and fungus resistance; the tests shall be carried out by a Government Laboratory in accordance with various ASTM procedures and the the result must show that the sheeting has passed the requirement for all the above mentioned parameters. A copy of the test reports shall be attached with the certificate.
Supply collection and carriage if First class brick 22.86cm x11.11cmx6.86cm from approved kiln to site of work shall be made from good brick earth conforming to 3.5 of Haryana PWD specification 1990 edition in stacks of 50 bricks length, 2 bricks width and 10 bricks height parallel to the center line of the road Bricks shall be free from saline deposits and shall be sand molded. They shall be thoroughly brunt without vitrified and shall have uniform deep red, cherry or copper colour. They shall be regular and uniform in shape and size with sharp and squares arise and parallel faces. They must be homogeneous in texture and emit a clear ringing sound on being struck. They shall be free flaws, cracks , chops, stones, nodules or lime or kankar and other blemishes complete as per Haryana PWD specification No. 3.5.1990 First Edition.(NS)
Laying brick on end edging length-wise 22.86 cm deep and 6.83 cm wide including excavation of earth and refilling the excavated soil and compacting along brick edging complete in all respect with other than brick soiling. (HSR 24.6 b)
Providing and marking center line / side line 2.5mm thick (minimum) with hot applied thermo-plastic road marking paint 10 Cm wide / 15 cm wide complete in all respect such as frunishing all labour, materials, tools equipment including all incidental costs necessary for carrying out in work at site conforming to the technical specification as caluse No. 803 of MORT&H specification for road and bridge works (5th revision) of 2013 / latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint - Apcomark / Berger - Sigmarc / Prismo. The glass beads shall be sampled and tested in accordance with appropriate ASTM/BS copy of certified test reports from the manufacturer of the thermoplastic material meet all the requirement of the specifications. The reflectorzing glass beads shall meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2.4 shall be exclusive of surface of glass beads the mentod the thickness measurement shall be in accordance with appendix B & C of BS 3262 (part -3) Note- Before start of work the contractor shall given brand, batch No. , manufacturing dated of the material to be used and get approved the same from Engineer-in- Charge before use.
Reinforced cement concrete 1:2:4 village board of standard design, fixed in position, including finishing & painting (HSR 10.130 +16.75b i)
Reinforcement cement concrete 1:2:4 Kilometer Stone on village road of standard design fixed in position including finishing painting and lettering (HSR 10.129 (iii) + 16.75 (b) ii
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected/ welded with 5 mm thick steel plate of 50 mm duly painetd as per cloumn mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect.
Earth work in excavation in foundations, trenches, etc. in all kinds of soils, not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres. (HSR 6.6)
Earth filling under floors with surplus soil, excavated from foundation and taken only from outside the building plinth, in 15 cm layer including ramming, watering and consolidating lead upto 30 metres. (HSR 6.13) (a)
Centring and shuttering for sides and soffits of beams haunchings, griders, bressumers and lintels. (HSR 9.7)
Shuttering for faces of concrete foundations and foundation beams (vertical or battering) (HSR 9.13)
Centring and shuttering for slab culverts. Centring and shuttering for slab culverts (HSR 9.18 a)
Cement concrete1:4:8 with brick ballast 40mm nominal size in foundation and plinth (HSR 10.36).
Design mix cement concrete of grade M-15 with minimum cement contents 240 Kg./cum in foundation and plinth. (HSR 10.64)
Design mix cement concrete of grade M-25 with minimum cement contents 300 Kg./cum in first storey upto 4 meters above plinth level. (HSR 10.73)
First class bricks work laid in cement sand mortar 1:3 in foundation and plinth (HSR 11.5).
First class brickwork laid in cement sand mortar 1:3 in first storey upto 4 meters above plinth level. (HSR 11.10)
Brick-on-edge flooring laid in cement sand mortar 1:4 on 75 mm thick cement 1:8:16 and 100 mm sand filling and cement pointed 1:2 on top. (HSR 14.23)
15 mm thick lime surkhi plaster 2:3 on the rough side of single or half brick wall(HSR 15.40)
Striking of joints in lime per cement on brick walls. (HSR 15.69 (a)).
Fe -500 EQR TMT steel bars for RCC works where not included in the complete rate of RCC including bending , binding and placing in position complete (HSR 18.22) Note:- Reinforcement shall be measured in length including hooks, if any separately for different diameters as actually used in work, excluding overlaps. From the length so measured, the weight of reinforcement shall be calculated in tones on the basis of IS - 1732. Wastage,overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding and placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcements (NS).
Providing, lowering, cutting, jointing and testing 600mm dia RCC pipe Class NP-3 as per IS 458-2003 with Spigot and socketed joints manufactured with ISI marked Sulphate Resistance Cement as per ISI 12330 with rubber rings ISI Marked, antitermite as required at site, into trenches, for all depths and laying out the same to correct alignments, gradients and levels including dressing and trimming and cutting of concrete beds and sides of trenches, if required, jointing with rubber rings in trenches and jointing with 1:1 ½ cement sand mortar and finishing the joints at angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in (HSR item No. 29.38, 29.44, 29.45 & 29.46) including cartage, loading and unloading complete in all respects. Note:- Contractor shall supply bill of manufacture of pipes. Pipes should bear name of manufacturer and ISI mark along with bill duly valid ISI certificate of manufacturer should be supply. Without these bills certificate no payment shall be released.
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- (i) Bitumen Material @ 1255/ Cum
Good Bricks @ 4.50 Each
Brick Bats @ 400/- cum
Milan Joon Construction
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .