Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | -39.00% | ₹2.7 L | L1 | Admitted-Finance |
| 2 | L2₹2.7 L+₹6,247.91 (2.34%)Admitted-Finance | -37.57% | ₹2.7 L+₹6,247.91 (2.34%) | L2 | Admitted-Finance |
| 3 | L3₹3.9 L+₹1.2 L (44.6%)Admitted-Finance | -11.80% | ₹3.9 L+₹1.2 L (44.6%) | L3 | Admitted-Finance |
| 4 | L4₹3.9 L+₹1.2 L (45.9%)Admitted-Finance | -11.00% | ₹3.9 L+₹1.2 L (45.9%) | L4 | Admitted-Finance |
| 5 | L5₹4.0 L+₹1.3 L (49.2%)Admitted-Finance | -9.00% | ₹4.0 L+₹1.3 L (49.2%) | L5 | Admitted-Finance |
Tender Value
₹4.4 L
EMD Value
₹8,760
Closing Date
10 Aug 2026, 10:00 amClosed
XEN REW JAMMU
XEN REW JAMMU
Balance work Const.of Lane and drain from the h/0 Ramesh singh to Joginder house in wno.7 Pyt Keren YEAR 2026-27(2nd call)
2026_RDPR_319094_3
e-NIT No. 338 REW J of 2026-27 dated 31-07-2026
Open Tender
Civil Works
Percentage
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹8,760
18 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of labour for prepration of site etc | 4 | NO | 553 | ₹2,212 |
| 2 | Earthwork in excavation my nanual means in trenches for found drains etc | 12.74 | cum | 479.3 | ₹6,106.28 |
| 3 | Providing and Laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering all work upto plinth level 1:5:10 (1 Cement:5 coarse sand:10 Graded stone aggregate 40mm nominal size) | 23.01 | cum | 4,826.5 | ₹1,11,057.77 |
| 4 | Providing and laying 60mm thick factory made cement concrete interlocking tile | 234 | sqm | 816.15 | ₹1,90,979.1 |
| 5 | Providing and Laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering all work upto plinth level 1:3:6 (1 Cement:3 coarse sand:6 Graded stone aggregate 20mm nominal size) | 12.94 | cum | 5,733.6 | ₹74,192.78 |
| 6 | supply of stone percent qty vide item no 3 | 3.24 | cum | 700 | ₹2,268 |
| 7 | P/L 1:2:4 cc Mix Drain Bed | 11.62 | sqm | 416 | ₹4,833.92 |
| 8 | Centering and shuttering including strutting,propping etc and removal of form | 66.54 | sqm | 286.35 | ₹19,053.73 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but exckuding the cost of centering shuttering finishing and reinforcement.all works upto plinth level 1:1.5:3 conc mix | 0.59 | cum | 9,821.85 | ₹5,794.89 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in | 50 | kg | 123.2 | ₹6,160 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1055415.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .