Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC 496665 | RAIGARH | CHHATTISGARH | 496665 | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.2 L+₹3,124 (2.75%)Rejected-Finance | L2 | Rejected-Finance As per BOQ | |
| 3 | L3₹1.2 L+₹6,248.70 (5.50%)Rejected-Finance | L3 | Rejected-Finance As per BOQ |
Tender Value
₹1.2 L
EMD Value
₹1,600
Closing Date
9 Sept 2022, 11:00 amClosed
PE EnM
PE EnM Office, Karo OCP
Dismantalling of old range of 8inch dia pipeline at kargali and its transporting from dismantalling place to KOCP i.r.o. Karo OCP
2022_CCL_254488_1
PE(EnM)/KOCP/etender/22-23/12
Open Tender
Miscellaneous Works
Item Rate
11 days
Karo OCP
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,600
10 May 2023
27 Aug 2022
10 Sept 2022
27 Aug 2022
9 Sept 2022
29 Aug 2022
27 Aug 2022 - 9 Sept 2022
Amount
Dismantalling of old range of 8" dia pipeline at kargali and its transporting from dismantalling place to KOCP i.r.o. Karo OCP
Excavation work by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. in ordinary rock.
Dismentalling of existing 8 " pipeline
Transportation of 8" dia pipe.
Total impact of GST for the purpose of CTC
NATIONAL ELECTRICAL WORKS
CITY ELECTRICALS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .