| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC PLOT NO 46 SUGANDHA VIHAR NEAR NEW ERA PROGRASSIVE SCHOOL RAMPUR DIST KORBA 495677 | KORBA | CHHATTISGARH | 495677 | L1 | Accepted-AOC Techno-commercially accepted by TC and approved by GM |
Tender Value
₹7.0 L
EMD Value
₹8,800
Closing Date
11 Sept 2023, 11:00 amClosed
STAFF OFFICER (EandM),SECL KUSMUNDA AREA
OFFICE OF THE STAFF OFFICER (EandM),SECL KUSMUNDA AREA P.O.KUSMUNDA COLLIERY 495454 DISTT. KORBA (CG)
Renovation work of 145KV SF6 circuit breaker, CGL- make with dismantling, providing, replacement of spare parts and installation, testing, commissioning of the said breaker at 132/33 KV Central Substation under Kusmunda Area
2023_SECL_286949_1
SECL/GM/KSM/EnM/ eTender/23-24/21
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
132KV Central Substation KUSMUNDA AREA
Please refer Tender documents.
7 documents required · 7 mandatory
₹8,800
21 Nov 2023
25 Aug 2023
12 Sept 2023
25 Aug 2023
11 Sept 2023
26 Aug 2023
26 Aug 2023 - 30 Aug 2023
Amount
Description of Work
145 KV SF6 Gas circuit breaker, CGL-make all three pole dismantling and renovation work due to SF6 gas leakage and erection work of Bus coupler bay at 132/33KV Central Substation under Kusmunsa Area. The job includes the following: Supplying of mandatory spare parts and required tools for renovation work of 145KV, CGL- make SF6 Gas Circuit breaker to stop the gas leakage by Service Engineer complete job as required. Supply of spares include: ETNA seal set- 03 nos., O-Ring P-105- 12 nos, O-Ring G-240/G-220- 06 nos., Absorbent - 3 Kg Micro Carbon Grease 1pkt - 50 gms Anabond 680 or Silastic (1080- 100 gms) - 8 Tubes Jointal-Z 1 packet- 10 gms SF6 as filling device with complete accessories - 1 no. SF6 gas leakage detector - 1 no. SF6 GAS cylinder, 50 KG- 1 no.
Assistance of manpower to support the said job. Assistance of 02 skilled, 04 semi-skilled and 04 unskilled manpower per day (08 hrs) is required for handling insulator at the time of dismantling and laid on the wooden silly, unscrew poles, fitting/replacing them, after fitting spares again tightening nutbolt ad erection of poles, etc. complete job as required to support the service engineer for completing the work.
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .