Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 CrAccepted-AOC PLOT NO 13 THIRD FLOOR BANSAL PLAZA SECTOR 6 COMMERCIAL COMPLEX DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹14.4 Cr+₹42.8 L (3.06%)Rejected-AOC 20 SC BOSE COLONY GALI NO 2 DEFENCE LAB ROAD RATNADA JODHPUR 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | L2 | Rejected-AOC Other than lowest bidder | |
| 3 | L3₹16.0 Cr+₹2.0 Cr (14.4%)Rejected-AOC 101 VRAJ APARTMENT OPP POLICE HEAD QUARTERS SARU SECTION ROAD JAMNAGAR 381008 | JAMNAGAR | 381008 | L3 | Rejected-AOC Other than lowest bidder | |
| 4 | L4₹19.1 Cr+₹5.1 Cr (36.8%)Rejected-AOC | L4 | Rejected-AOC Other than lowest bidder | |
| 5 | Rejected-Technical M 11 22 BADLI IND ESTATE DELHI 110042 | DELHI | NORTH DELHI | DELHI | 110042 | - | Rejected-Technical Does not fulfil eligibility criteria |
| Sl No | Description | Qty | Unit | M/s SK Traders H2 | M K ENGINEERS CO. H3 | M/S RADIUS SYNERGIES INTERNATIONAL PVT LTD H4 | Satnam Global Infraprojects Ltd. H1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Site survey, Designing, supply, installation, testing and commissioning of Advanced Metering infrastructure (AMI) to integrete smart meters, communication network and data management systems to enable real-time monitoring and management of Single Phase Smart meters comprising the followings:-
(i) Single phase smart meters suitable for operation on 230 V, 50 hz AC supply, classs 1.0 accuracy of range 10A-60A confirming to BIS-16444 (Revised 2020) & relevant IEC standard with inbuilt cellular/RF communication facility, including the sufficient memory for data storage with suitable display etc.
(ii) The smart meters shall be of different makes (Not more than 33% of individual make at each station as mentioned at Para 2 of Sch 'A' Notes). The meter shall be provided with DCU & repeater (if applicable) of suitable specifications & Nos as per the requirement.
(iii) Designing, Supply, installation, testing and commissioning of communication infrastructure (RF/ cellular as per the requirements) to meet the performance requirements of handling minimum 20,000 Nos of meters(Single Phase / Three Phase) of different makes with feasibility for incorporation of 25% future requirement.
(iv) Designing, supply, installation, testing and commissioning of Meter Data Management (MDM)System.
(v) Designing, supply, installation, testing and commissioning of Head End System.
(vi) The smart meter shall support open communication protocol DLMS with the software.
(vii) Integration of different charges like water charges, rent and allied fee etc for generation of common bills.
(viii) Integration / interface of the AMI system with application systems like metering /billing/ collection. Interface has to be provided in the proposed solution to upload and process meter data from these systems.
(viii) Including all necessary equipment and softwares for functional requirement of the AMI.
(ix) Including all the recurring charges of telecom operator softwares etc from installations till the completion of the project (Phase-I).
(x) Planning, development & tuning of communication system including cellular network (if required) to meet the performance requirements.
(xi) Business Intelligence, analytics and Reporting. | 17,571 | Each Meter | 5,192 ₹9,12,28,632 | 5,000 ₹8,78,55,000 | 3,894 ₹6,84,21,474 Lowest | 6,120 ₹10,75,34,520 |
| 2.00 | All as Srl Item No.1.00 here-in-before but comprising three phase smart meters suitable for operation on 415 V, 50 Hz AC supply complete all as specified and directed. | 1,896 | Each Meter | 7,246 ₹1,37,38,416 | 7,700 ₹1,45,99,200 | 6,372 ₹1,20,81,312 Lowest | 10,000 ₹1,89,60,000 |
| 2.01Notes for Srl Item Nos 1.00 and 2.00 here-in-before : (i) The meter shall be compatible with communication technology GPRS/RF/Hybrid (RF+GPRS)/ or any other advanced technology as per CEA/TRAI regulations. (ii) It should be possible to integrate meter and DCU of any make as approved by GE with software as being provided. (iii) It shall be possible to run the meter in both prepaid and postpaid mode. (iv) The meters should carry 10 year guarantee. (v) The quantity of communication instruments (RF meter/cellular meter/DCU/Gateway/Repeater) shall be worked out by contractor after field survey and the same shall be approved by GE before execution. (vi) The meter cost shall include the cost of DCU and repeaters of suitable capacity and Nos as required. (vii) The necessary Cyber clearance/ Audit shall be carried out from authorised agency/firm by the contractor as per E-IN-C's policy no- 12/2023. Cost of the same deemed to be included in overall cost. (viii) Firm supplying smart meter should have BIS license as per 16444 at the time of supply. (ix) Contractor shall share through OEM the BIS certification/authentication/enscription keys/passwords of the meters alongwith all the necessry relavant details with GE. (x) The contractor shall be responsible for removing the existing meter, noting down the reading and depositing it with the GE as directed. (xi) Audit of software for smart meter will be done by cert India empanelled firm or cert auditor of armed forces. The cost of audit will be borne by the contractor. Cert Audit of smart metering system at the time of commissioning shall be carried out. | |||||||
| 2.02(xii) All RF meters shall be based on self healing "MESH TECHNOLOGY". (xiii) 1% extra meter of different makes (Not more than 33% of individual make at each station as mentioned at Para 2 of Sch 'A' Notes) shall be supplied to GE as "SPARE" within overall cost quoted. The contractor shall supply this additional 1% of the total number of meter prior to release of payment for the installed meters. (xiv) 8 No. DCU and 04 No. repeater shall be supplied as "SPARE" within overall cost quoted. (xv) DCU shall have folllowing features:- (a) DCU shall be with IP-67 protection. (b) It shall be compatible for remote Automatic Metering Infrastructure (AMI) solution and capable of communicating with the smart energy Meter in the corresponding frequency band and with the data server through GPRS/Ethernet. (c) It would have internal memory to store data of at least 200 modules. (d) It shall have inbuilt battery back-up. (e) It shall support auto discovery of the meters and self healing mechanism for the breaks in the RF network. (b) It shall be able to configure the communication with underlying nodes / meters (c) It shall be able to pull data at configurable frequency from the nodes / meters. It shall be able to prioritize control commands. (d) It shall support on demand data from nodes. (e) It shall support data transfer via cellular / optical fibre communication. In case of cellular communication, it would support dynamic IP sim from any telecom service provider (minimum 5G and fallback to 2G). (f) It shall be able to communicate to the nearest meters directly. For farther meters, it would allow communication through existing meters via mesh or other formation. (xvi) The meters shall be compatible for integration with third party software. (xvii) The contractor shall provide training and guidance to MES Staff. (xviii) The work shall be executed in commensuration with relevent Particular Specifications as given in Tender documents. (xix) Prior to release of payment, the contractor shall satisfy the GE that all installed meters of which payment is being done are fully functional and operating satisfactorily. | |||||||
| 3.00 | Supply and installation of the following for Network Operation and Monitoring Centre (NOMS) with basic training :-
(a) PC and Monitor Specification
Processor : Intel Core Ultra 5 225
Memory : 16GB (2 x 8GB) DDR5-RAM 5600 MT/s
Storage : 1TB M.2 PCle Gen 4 NVMe SSD
Display : 31.5-inch 4K UHD IPS display
Graphics Card : Integrated Graphics
Operating System : Windows 11 Home 64 with lattest update
Microsoft Productivity Software : Microsoft Office Home 2024
Networking : 2.5G Ethernet Adapter
Wireless : Wifi 6E 2x2 AX & Bluetooth 5.3
Mouse & Keyboard : USB Wired
Optical Drive : Slim DVD ROM 9.0mm
(b) Minimum 100Mbps Fibre to the Home (FTTH) broadband charges upto completion of Phase-I (cost is deemed to be included in this).
(c) LaserJet All-in-One Printer Specification.
• Print Speed: Up to 29 pages per minute (PPM) in black and white
• Scan Resolution: 1200 x 1200 dpi
• Copy Resolution: 600 x 600 dpi
• Paper Capacity: 500-sheet input tray, 100-sheet output tray
• Duplex Printing: Automatic duplex printing
• Wireless Printing: Yes
(d) UPS 1 KVA with Lithium Ion Battery (48V/12AH)
(e) work to be executed in different pockets/locations under AOR of HQ CE Chandigarh Zone as mentioned at Para 2 of Sch 'A' Notes. | 4 | Each | 1,53,999.14 ₹6,15,996.56 | 3,50,000 ₹14,00,000 | 3,04,440 ₹12,17,760 | 1,00,000 ₹4,00,000 Lowest |
| 4.00 | Taking down old submain wiring of 6 Sqmm/10 Sqmm and taking away from the site and making good surface as per existing surface specifications complete all as specified and directed. | 28,222 | RM | 25 ₹7,05,550 | 10 ₹2,82,220 Lowest | 28.32 ₹7,99,247.04 | 25 ₹7,05,550 |
| 5.00 | Material and labour for concealed submain wiring with two single core FRLSH PVC insulated unsheathed copper conductor cable 6 sqmm drawn in and including rigid non metallic PVC medium grade 25mm dia concealed conduit with accessories on wall or ceiling with one additional PVC insulated, stranded copper conductor FRLSH of 6 sqmm, green colour for earth continuity conductor for connection of meter from DB complete all as specified and directed.
Note : 3 run of cable and 1 run of conduit shall be measured as 1 unit.
(ii) The quoted rates shall be deemed to be inclusive for cutting chasses in walls/pillars/columns etc. of any description for concealing the conduits to required depth & making good the disturbed surface in cement mortar 1:4 including finishing the surface to match with the existing surface.
(iii) The portion of submain wiring at ceiling shall be in surface conduit fixed on ceiling surface with using necessary accessories/fittings. Rates of the same is deemed to be included. | 19,921 | RM | 450 ₹89,64,450 Lowest | 500 ₹99,60,500 | 567.81 ₹1,13,11,343.01 | 450 ₹89,64,450 Lowest |
| 6.00 | Material and labour for concealed submain wiring with four single core FRLSH PVC insulated unsheathed copper conductor cable 10 sqmm drawn in and including rigid non metallic PVC medium grade 32 mm dia concealed conduit with accessories on wall or ceiling with one additional PVC insulated, stranded copper conductor FRLSH of 10 sqmm, green colour for earth continuity conductor for connection of meter from DB complete all as specified and directed.
Note : 5 run of cable and 1 run of conduit shall be measured as 1 unit.
(ii) The quoted rates shall be deemed to be inclusive for cutting chasses in walls/pillars/columns etc. of any description for concealing the conduits to required depth & making good the disturbed surface in cement mortar 1:4 including finishing the surface to match with the existing surface.
(iii) The portion of submain wiring at ceiling shall be in surface conduit fixed on ceiling surface with using necessary accessories/fittings. Rates of the same is deemed to be included. | 7,210 | RM | 1,000 ₹72,10,000 | 1,170 ₹84,35,700 | 1,418.83 ₹1,02,29,764.3 | 800 ₹57,68,000 Lowest |
| 7.00 | Taking down of old sheet metal enclosures DB 8 Way SPN including MCBs etc after disconnecting electrical connections safely and make good to disturbed surfaces as per the existing specifications complete all as specified and directed. | 358 | Each | 150 ₹53,700 | 100 ₹35,800 Lowest | 708 ₹2,53,464 | 1,701 ₹6,08,958 |
| 8.00 | S& F TPN 6 Way DB Double door, 3 phase 415 volts , IP-43 for MCB, comprising 3 phase 4 wire copper strip, 200 Amps Bus bar of capacity and proper connection with Aluminium lugs, earth wire complete on walls complete all as specified and directed. | 358 | Each | 1,600 ₹5,72,800 Lowest | 3,000 ₹10,74,000 | 9,947.4 ₹35,61,169.2 | 4,300 ₹15,39,400 |
Tender Value
₹23.3 Cr
EMD Value
₹15 L
Closing Date
14 Apr 2026, 6:00 pmClosed
Chief Engineer Chd Zone
HQ CE Chandigarh Zone N Area, Airport Road Chandigarh-160003
PROVISION OF SMART METERS AT CHANDIGARH MIL STATIONS
2026_MES_754806_1
CE CHZ/CHM/T-25/2025-26
Open Tender
Electrical and Maintenance Works
Item Rate
744 days
Chandigarh
As per tender documents
9 documents required · 9 mandatory
₹3,000
GE Chandimandir
₹15 L
Yes
6 Aug 2026
10 Mar 2026
16 Apr 2026
10 Mar 2026
14 Apr 2026
7 Apr 2026
10 Mar 2026 - 22 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site survey, Designing, supply, installation, testing, commissioning of Advanced Metering infrastructure (AMI) to integrete smart meters, communication network and data management systems to enable real-time monitoring and management of Single Phase Smart meters comprising the following:-
(i) Single phase smart meters suitable for operation on 230 V, 50 hz AC supply, classs 1.0 accuracy of range 10A-60A confirming to BIS-16444 (Revised 2020) & relevant IEC standard with inbuilt cellular/RF communication facility, including the sufficient memory for data storage with suitable display etc.
(ii) The smart meter shall be of different makes (Not more than 33% of individual make). The meter shall be provided with DCU & repeater (if applicable) of suitable specifications & Nos as per the requirement.
(iii) Designing, Supply, installation, testing and commissioning of communication infrastructure (RF/ cellular as per the requirements) to meet the performance requirements of handling minimum 21,000 Nos of meters(Single Phase / Three Phase) of different makes with feasibility for incorporation of 25% future requirement.
(iv) Designing, supply, installation, testing and commissioning of Meter Data Management (MDM)System.
(v) Designing, supply, installation, testing and commissioning of Head End System.
(vi) The smart meter shall support open communication protocol DLMS with the software.
(vii) Integration of different charges like water charges, rent and allied fee etc for generation of common bills.
(viii) Integration / interface of the AMI system with application systems like metering /billing/ collection. Interface has to be provided in the proposed solution to upload and process meter data from these systems.
(viii) Including all necessary equipment and softwares for functional requirement of the AMI.
(ix) Including all the recurring charges of telecom operator softwares etc from installations till the completion of the project.
(x) Planning, development & tuning of communication system including cellular network (if required) to meet the performance requirements.
(xi) Business Intelligence, analytics and Reporting. | 18,592 | Each Meter | - | - |
| 1.01 | (xii) Single phase polycarbonate meter box of suitable size for fixing of new prepaid meter alongwith all fixing accessories having IP-65 protection including fixing the box in wall front opening door alongwith locking system all as specified and as directed.
Note:-
(a) blank
(b) Box shall be suitable for IP-65 protection. It shall be made from polycarbonate with glass fibre reinforced material.
(c) Degree of protection for mechnical load shall be IK08 as per EN50298.
(d) Box shall be fire retardant and self extinguishing. It shall have internally embedded extruded silicon gasket.
(e) Color code of Box shall be as per Ral 9011/7035.
(f) Any make as per specification given can be supplied.
(g) Clamp for fixing of Box shall be of SS-304. Screws to be used shall also be of SS-304. | - | - | - | - |
| 2 | All as Srl Item No.-01 here-in-before but comprising three phase smart meters suitable for operation on 415 V, 50 Hz AC supply, including the suitable size polycarbonate Meter Box. | 1,932 | Each Meter | - | - |
| 2.02 | (xi) All RF meters shall be based on self healing "MESH TECHNOLOGY". (xii) Blank
(xiii) 8 No. DCU and 04 No. repeater shall be supplied as "SPARE" within overall cost quoted.
(xiv) DCU shall have folllowing features:-
(a) DCU shall be with IP-67 protection.
(b) It shall be compatible for remote Automatic Metering Infrastructure (AMI) solution and capable of communicating with the smart energy Meter in the corresponding frequency band and with the data server through GPRS/Ethernet.
(c) It would have internal memory to store data of at least 200 modules.
(d) It shall have inbuilt battery back-up.
(e) It shall support auto discovery of the meters and self healing mechanism for the breaks in the RF network.
(b) It shall be able to configure the communication with underlying nodes / meters
(c) It shall be able to pull data at configurable frequency from the nodes / meters. It shall be able to prioritize control commands.
(d) It shall support on demand data from nodes.
(e) It shall support data transfer via cellular / optical fibre communication. In case of cellular communication, it would support dynamic IP sim from any telecom service provider (minimum 5G and fallback to 2G).
(f) It shall be able to communicate to the nearest meters directly. For farther meters, it would allow communication through existing meters via mesh or other formation.
(xv) The meters shall be compatible for integration with third party software.
(xvii) The contractor shall provide training and guidance to MES Staff. | - | - | - | - |
| 3 | Supply and installation of the following for Network Operation and Monitoring Centre (NOMS) with basic training:-
(a) PC and Monitor Specification
Processor : Intel Core Ultra 5 225
Memory : 16GB (2 x 8GB) DDR5-RAM 5600 MT/s
Storage : 1TB M.2 PCle Gen 4 NVMe SSD
Display : 31.5-inch 4K UHD IPS display
Graphics Card : Integrated Graphics
Operating System : Windows 11 Home 64
Microsoft Productivity Software : Microsoft Office Home 2024
Networking : 2.5G Ethernet Adapter
Wireless : Wifi 6E 2x2 AX & Bluetooth 5.3
Mouse & Keyboard : USB Wired
Optical Drive : Slim DVD ROM 9.0mm
(b) Fibre to the Home (FTTH) Broadband Connection: Minimum 100Mbps Fibre to the Home (FTTH) broadband for 02 years (cost is deemed to be included in this).
(c) LaserJet All-in-One Printer Specification.
• Print Speed: Up to 29 pages per minute (PPM) in black and white
• Scan Resolution: 1200 x 1200 dpi
• Copy Resolution: 600 x 600 dpi
• Paper Capacity: 500-sheet input tray, 100-sheet output tray
• Duplex Printing: Automatic duplex printing
• Wireless Printing: Yes
(d) UPS 1 KVA with Lithium Ion Battery (48V/12AH)
(e) work to be executed in different pockets/locations under AOR of HQ CE Chandigarh Zone. | 4 | Each | - | - |
| 4 | Taking down old submain wiring of 6 Sqmm/10 Sqmm and mtaking away from the site and making good surface complete all as specified and directed. | 16,419 | RM | - | - |
| 5 | Material and labour for concealed submain wiring with two single core FRLSH PVC insulated unsheathed copper conductor cable 6 sqmm drawn in and including rigid non metallic PVC medium grade 25mm dia concealed conduit with accessories on wall or ceiling with one additional PVC insulated, stranded copper conductor FRLSH of 6 sqmm, green colour for earth continuity conductor including taking down old unserviceable submain wiring and making good the disturbed surface for connection of meter from DB complete all as specified and directed.
Note : 3 run of cable and 1 run of conduit shall be measured as 1 unit.
(ii) The quoted rates shall be deemed to be inclusive for cutting chasses in walls/pillars/columns etc. of any description for concealing the conduits to required depth & making good the disturbed surface in cement mortar 1:4 including finishing the surface to match with the existing surface.
(iii) The portion of submain wiring at ceiling shall be in surface conduit fixed on ceiling surface with using necessary accessories/fittings. | 14,874 | RM | - | - |
| 6 | Material and labour for concealed submain wiring with four single core FRLSH PVC insulated unsheathed copper conductor cable 10 sqmm drawn in and including rigid non metallic PVC medium grade 32 mm dia concealed conduit with accessories on wall or ceiling with one additional PVC insulated, stranded copper conductor FRLSH of 10 sqmm, green colour for earth continuity conductor including taking down old unserviceable submain wiring and making good the disturbed surface for connection of meter from DB complete all as specified and directed.
Note : 5 run of cable and 1 run of conduit shall be measured as 1 unit.
(ii) The quoted rates shall be deemed to be inclusive for cutting chasses in walls/pillars/columns etc. of any description for concealing the conduits to required depth & making good the disturbed surface in cement mortar 1:4 including finishing the surface to match with the existing surface.
(iii) The portion of submain wiring at ceiling shall be in surface conduit fixed on ceiling surface with using necessary accessories/fittings. | 1,545 | RM | - | - |
| 7 | Supply and Configuration of the Web based Software with following features:
(i) Meter Data Management Module :-
The meter data management module would be responsible for collecting the data from the concentrator and make the data available to the billing system. The meter data management system would capture and provide the following data:
(a) 30 min instantaneous data from all the meters for seven parameters – Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency
(b) Monthly billing survey data for cumulative energy and max demand
(ii) Postpaid /Prepaid Billing Module :-
The billing module would collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data / billing data available to admin and end users. The billing module would include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. It would allow postpaid and prepaid functionality as required.
(iii) Occupation and Vacation Module:-
The system would support occupation / vacation and billing reports. The software would be collecting data from DCU. The software would provide access to staff as well as the occupants for the data.
(iv) Web site :-
There would be a dedicated website to view all the data and information. Designated users shall have the admin access to the application. Designated user shall also have the access of the key information on an iOS / android mobiles app (for admin use). | 41,048 | per meter per year | - | - |
| 7.01 | (v) Customer Portal :-
The system would include a customer portal for the resident /occupant to log in and view their own energy / billing data. There would be Android / iOS mobile apps for the user to monitor its own data and balance on regular basis.
(vi) Energy Accounting Module:-
The system would include features of energy accounting.
(vii) Communication Module :-
The system would provide communication of energy data and bills via print, email and sms methods.
(viii) Meter Master Data :-
The system would support meter master data repository. The system would support meter replacement process.
(ix) Excel Export :-
The system would support export of metering and billing data in excel format.
(x) Customer Care Module : -
The software would include a customer care module where the user shall log in any complaints. The service provider would monitor the complaints and carry out the necessary activities for the complaints resolution.
(xi) Meter Installation Module : -
The software would include a meter installation module where the meter installation or changes can be captured and the readings may be demonstrated to the user if required.
(xii) Activities Communication :-
The software support communication of the various activities such as occupation, vacation, meter change. personal detail change etc. with the user as well as the department on email. | - | - | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
tender.pdf
Tender Documents • 1.52 MB
BOQ_846483.xls
BOQ • 0.87 MB
Corrig05.pdf
PDF • 0.15 MB
CORRIGENDUM03.pdf
PDF • 0.10 MB
CORRIGENDUM02.pdf
PDF • 0.10 MB
CORRIGENDUM01.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .