Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical BQR satisfied |
| 2 | Accepted-Technical | Accepted-Technical BQR satisfied |
Tender Value
Refer Docs
EMD Value
₹13,300
Closing Date
18 Feb 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE NCTPS II
Office of Chief Engineer NCTPS II CHENNAI 120
NCTPS II MI Circle Boiler Maintenance Division Unit I II Up keeping routine maintenance and breakdown maintenance
2026_EB_651081_1
CE NCTPS II SE M I O M 259 2025 26
Open Tender
Miscellaneous Works
Works
365 days
SE MI NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹13,300
Yes
3 Mar 2026
4 Feb 2026
19 Feb 2026
4 Feb 2026
18 Feb 2026
4 Feb 2026
Charges for up keeping, routine maintenance of Boiler Fill Pumps, Condensate Transfer Pump and its accessories in 600MW unit such as thorough cleaning of pump house, cleaning of equipment, arresting of water leaks, lubricating, checking of coupling stability, free rotation of pump shaft, cooling water flow, changing of flange gaskets, damaged Bolt & Nuts, ensuring trouble free operation of pumps round the clock including T&Ps, consumables, lead, lift and transportation etc., complete.
Boiler Fill pump (Horizontal multi stage pump): Decoupling the motor & Pump This work involves removing coupling guard and all the bolts and freeing the flanges from rubber bushes so that the pump and motor can be rotated separately. Charges including T&p's and consumables.
Boiler Fill pump (Horizontal multi stage pump): Removing & connecting the Pump inlet & out let flanges. This work involves removing all the bolts and freeing the inlet & out let flanges so that the pump can be moved from the bed. Coupling the Pump inlet & out let flanges after completion of the work by providing gasket between the flanges. Charges including T&p's and consumables.
Boiler Fill pump (Horizontal multi stage pump): Dismantling the Pump and Assembling the Pump. This work involves removing the body bolts and five stages of the pump, inspection, cleaning of casing & impeller etc., rectifying minor defects and assembling the all the stages of the pump and bearing & seals.
Boiler Fill pump (Horizontal multi stage pump): Rectification of Mechanical seal: This work involves removal of damaged carbon material from mechanical seal and made new casting in mechanical seal and machining the seal. Charges including T&p's and consumables.
Boiler Fill pump (Horizontal multi stage pump): Placing the Pump on bed & alignment This work involves placing the pump on bed, alignment with the pump and coupling the motor & pump flanges with bolts. Charges including T&p's and consumables.
Condensate transfer pump (Horizontal split case pump): Decoupling the motor & Pump This work involves removing coupling guard and all the bolts and freeing the flanges from rubber bushes so that the pump and motor can be rotated separately. Charges including T&p's and consumables
Condensate transfer pump (Horizontal split case pump):Removing & connecting the Pump inlet & out let flanges.This work involves removing all the bolts and freeing the inlet & out let flanges so that the pump can be moved from the bed. Coupling the Pump inlet & out let flanges after completion of the work by providing gasket between the flanges. Charges including T&p's and consumables.
ndensate transfer pump (Horizontal split case pump): Dismantling the Pump and Assembling the Pump. This work involves removing the body bolts and removing bearing of both ends and dismantling of Horizontal split case pump, inspection, cleaning of casing & impeller etc., rectifying minor defects and assembling the pump and bearing & seals. Charges including T&p's and consumables.
Condensate transfer pump (Horizontal split case pump): Placing the Pump on bed & alignment This work involves placing the pump on bed , alignment with the pump and coupling the motor & pump flanges with bolts. Charges including T&p's and consumables.
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_780699.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .