Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
22 Apr 2025, 3:00 pmClosed
Block Development Officer (V.P)
Block Development Officer (V.P) Theni
Providing CC Pavement from Kauppasamy Koil to Karuppiah house in Karuppasamy Koil North Street in Upparpatty AGAMT 2025-2026
2025_RDTN_545816_1
1130/2025/P.3
Open Tender
Civil Works
Works
90 days
THENI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
Yes
7 Jun 2025
15 Apr 2025
22 Apr 2025
15 Apr 2025
22 Apr 2025
15 Apr 2025
Amount
Earth work excavation and depositing on bank with an initial lead of 10m initial lift of 2m in hard stiff clay, stiff block cotton soil and hard red earth shales, murram, ground stony earth and earth mixed with small bounders and hard gravely soil as per SS20B
Cement Concrete 1:4:8 Using 40 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification.
Supplying and erecting Centering including cost and conveyance of all other labour charges etc., complete.
Plain Cement Concrete 1:3:6 using 20 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges etc.,
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
RCC 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Plastering in CEMENT MORTAR 1:5 12mm thick in Including cost and conveyance of materials to site and all other labour charges including etc., as per standard specification.
Cement concrete 1:2:4 using 20mm HBG metal including cost and conveyance and all other labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S.Renganathan (BID ID -1306691)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .