Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.4 LAccepted-AOC | ₹19.4 L | L1 | Accepted-AOC L1 |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Original EMD not received |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance NEDUNGULAM | THIRUVALLUR | TAMIL NADU | 600019 | - | - | Not Admitted-Fee/PreQual/Technical/Finance Original EMD not received |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Original EMD not received |
| 5 | Rejected-Technical | - | - | Rejected-Technical Evaluation Rejected |
| Sl No | Description | Qty | Unit | KRISHNAMOORTHI K L1 | MANIKANDAN M L2 |
|---|---|---|---|---|---|
| 1.00Part-I Renewal of the road from Urakudi-Pudukudi road to Vinoba Nagar Road 0/0 - 1/610 | |||||
| 1.01 | Clearing the Light Jungle with out uprooting including all labour charges | 594 | sqm | 6 ₹3,564 | 10 ₹5,940 |
| 1.02 | Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., complete. | 611.33 | Cum | 140 ₹85,586.20 | 150 ₹91,699.50 |
| 1.03Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | |||||
| 1.04 | Km 0/0-1/0 | 119.65 | Cum | 801 ₹95,839.65 | 850 ₹1.0 L |
| 1.05 | Km 1/0-1/610 | 16.2 | Cum | 801 ₹12,976.20 | 850 ₹13,770 |
| 1.06Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | |||||
| 1.07 | KM 0/0 – 1/610 | 4,256.25 | sqm | 34.49 ₹1.5 L | 40 ₹1.7 L |
| 1.08BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | |||||
| 1.09 | KM 0/0 – 1/610 | 106.41 | Cum | 12,182 ₹13.0 L | 12,500 ₹13.3 L |
Tender Value
Refer Docs
EMD Value
₹39,280
Closing Date
27 Feb 2026, 3:00 pmClosed
THE BLOCK DEVELOPMENT OFFICER (B.PT)
PANCHAYAT UNION OFFICE PARAMAKUDI
Renewal of the Road from urakudi puthukudi road to vinoba nagar road
2026_RDTN_665836_1
A2/4355/2025- RRM -2025-26
Open Tender
Civil Works
120 days
PANCHAYAT UNION OFFICE PARAMAKUDI
Please Refer Tender Dcouments
2 documents required · 2 mandatory
₹0
₹39,280
6 May 2026
25 Feb 2026
27 Feb 2026
25 Feb 2026
27 Feb 2026
25 Feb 2026
Part-I Renewal of the road from Urakudi-Pudukudi road to Vinoba Nagar Road 0/0 - 1/610
Clearing the Light Jungle with out uprooting including all labour charges
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., complete.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Hecta metre stone
KM Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_799750.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
VINOBANAGAR.pdf
Tender Documents • 0.32 MB
BOQ_799750.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid