| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-Finance | ₹1.9 L | L1 | Accepted-Finance First Lowest |
| 2 | L2₹1.9 L+₹3,433.95 (1.84%)Accepted-Finance | ₹1.9 L+₹3,433.95 (1.84%) | L2 | Accepted-Finance Second Lowest |
| Sl No | Description | Qty | Unit | ASAN JAFFER ALI L2 | MJD BUILDERS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. | 0.4 | M3 | 366 ₹146.4 | 360 ₹144 Lowest |
| 2.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means | 0.2 | M3 | 5,383 ₹1,076.6 | 5,276 ₹1,055.2 Lowest |
| 3.00Brick work in following Cement Mortar 1:5 using best quality Burnt Clay Brick of size 8 3/4” x 4 1/4” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 3.01 | In Foundation and basement | 0.47 | M3 | 6,467 ₹3,039.49 | 6,338 ₹2,978.86 Lowest |
| 4.00 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used curing etc. complete complying with standard specification and as directed by the departmental officers. | 1.7 | M2 | 287 ₹487.9 | 282 ₹479.4 Lowest |
| 5.00 | Supplying and laying of Interlocking Paver block stone 63mm thick over a base layer of crushed stone sand filling including cost of materials laying and labour charges etc., complete and as directed by the departmental officer | 104.7 | M2 | 1,444 ₹1,51,186.8 | 1,418 ₹1,48,464.6 Lowest |
| 6.00 | Providing Name board arrangements. The surface shall be prepared properly and painted with a background colour, over which the Name of work, Name of school, and scheme shall be written with paint legibly, The rate includes cost of material, cost of labour and scaffolding charges if necessary etc., complete and as directed by the departmental officers. | 1 | No. | 4,800 ₹4,800 | 4,705 ₹4,705 Lowest |
| 7.00 | GST | 1 | Nos | 28,932.69 ₹28,932.69 | 28,408.87 ₹28,408.87 Lowest |
Tender Value
₹1.9 L
EMD Value
₹1,900
Closing Date
20 Aug 2026, 3:00 pmClosed
Executive Engineer
O/o.Executive Engineer, PWD., Buildings (C and M) Division, Tirunelveli
Providing Name board and other amenities for the work of Construction of 4 Class room building in Periyar Government Higher Secondary School at Cheranmahadevi in Tirunelveli District
2026_PWD_689815_1
3(6) EE/2026-27 Dated 29.07.2026
Open Tender
Civil Works - Buildings
Lump-sum
60 days
Cheranmahadevi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1,900
31 Aug 2026
31 Jul 2026
21 Aug 2026
31 Jul 2026
20 Aug 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. | 0.4 | M3 | - | - |
| 2 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means | 0.2 | M3 | - | - |
| 3Brick work in following Cement Mortar 1:5 using best quality Burnt Clay Brick of size 8 3/4” x 4 1/4” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 3.01 | In Foundation and basement | 0.47 | M3 | - | - |
| 4 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used curing etc. complete complying with standard specification and as directed by the departmental officers. | 1.7 | M2 | - | - |
| 5 | Supplying and laying of Interlocking Paver block stone 63mm thick over a base layer of crushed stone sand filling including cost of materials laying and labour charges etc., complete and as directed by the departmental officer | 104.7 | M2 | - | - |
| 6 | Providing Name board arrangements. The surface shall be prepared properly and painted with a background colour, over which the Name of work, Name of school, and scheme shall be written with paint legibly, The rate includes cost of material, cost of labour and scaffolding charges if necessary etc., complete and as directed by the departmental officers. | 1 | No. | - | - |
| 7 | GST | 1 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
Tenderconditioncherai.pdf
Tender Documents • 1.06 MB
BOQ_829212.xls
BOQ • 0.26 MB
corrigendum4.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .