Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L Quoted ₹3.5 L | L1 | Accepted-AOC Accepted as L1 basis |
| 2 | L2₹4.4 L+₹88,216 (25.4%)Rejected-Finance CIRCUIT HOUSE ROAD SINGRAULI MADHYAPRADESH 486889 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486889 | ₹4.4 L+₹88,216 (25.4%) | L2 | Rejected-Finance Rejected as not L1 |
| 3 | Rejected-Technical MAIN ROAD SINGRAULI P O SINGRAULI DISTT SINGRAULI M P 486889 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486889 | - | - | Rejected-Technical Technocommercially disqualified |
| Sl No | Description | Qty | Unit | Alfa Engineering And Trading Co. L2 | United Engineering L1 |
|---|---|---|---|---|---|
| 1.00Name and scope of work : Repairing of 04 Nos. Travel Motors of REL750E Drill Machine at Nigahi Project. Maximum likely manpower to be deployed per day : 06 Nos. (02 Nos. Skilled, 02 Nos. Semi-Skilled and 02nos Un-skilled). | |||||
| 2.00 | Cost / charges for repairing and rebuilding of inner and outer thrust bearing plate to get original micro finishing including labour charges contractor profit etc. ( required Skilled, Semi-Skilled and Un-skilled manpower to be deployed as per job requirement) (1No. for each Travel Motors ) (Total 04 Nos. Travel Motors ) | 4 | nos. | 20,560 ₹82,240 | 16,570 ₹66,280 Lowest |
| 3.00 | Cost / charges for repairing and rebuilding of all piston sub-assembly to ge original equal size finishing including labour charges contractor profit etc. ( required Skilled, Semi-Skilled and Un-skilled manpower to be deployed as per job requirement) (1No. for each Travel Motors ) (Total 04 Nos. Travel Motors ) | 4 | nos. | 19,875 ₹79,500 | 12,427 ₹49,708 Lowest |
| 3.01 | Cost/charges for lathe machineing , material and tools tackles ( 20 Hrs. each motor) (Total 04 Nos. Travel Motors ) job at Sl No. 03 | 80 | Hrs | 525 ₹42,000 | 472 ₹37,760 Lowest |
| 4.00 | Cost / charges for repairing and rebuilding of all piston sub-assembly bore to ge original equal size finishing including labour charges contractor profit etc. ( required Skilled, Semi-Skilled and Un-skilled manpower to be deployed as per job requirement) (1No. for each Travel Motors ) (Total 04 Nos. Travel Motors ) | 4 | nos. | 21,200 ₹84,800 | 16,570 ₹66,280 Lowest |
| 4.01 | Cost/charges for lathe machineing , material and tools tackles ( 20 Hrs. each motor) (Total 04 Nos. Travel Motors ) job at Sl No. 04 | 80 | Hrs | 525 ₹42,000 | 472 ₹37,760 Lowest |
| 5.00 | Cost / charges for repairing and rebuilding of by pass sleeve to get original equal size finishing including including labour charges contractor profit etc. ( required Skilled, Semi-Skilled and Un-skilled manpower to be deployed as per job requirement) (1No. for each Travel Motors ) (Total 04 Nos. Travel Motors ) | 4 | nos. | 13,125 ₹52,500 | 11,044 ₹44,176 Lowest |
| 5.01 | Cost/charges for lathe machineing , material and tools tackles ( 18 Hrs. each motor) (Total 04 Nos. Travel Motors ) job at Sl No.05 | 72 | Hrs | 525 ₹37,800 | 472 ₹33,984 Lowest |
| 6.00 | Cost / charges for replacement of seal kit ( to be provided by NCL) and dismantling , assembling and testing of motor including labour charges contractor profit etc. ( required Skilled and Un-skilled manpower to be deployed as per job requirement) (1No. for each Travel Motors ) (Total 04 Nos. Travel Motors ) | 4 | nos. | 3,600 ₹14,400 | 2,769 ₹11,076 Lowest |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tender Value
₹4.1 L
EMD Value
₹5,200
Closing Date
31 Mar 2026, 11:00 amClosed
GM(EXCV)NCL, NIGAHI PROJECT
OFFICE OF GENERAL MANAGER (EXCV)NCL NIGAHI PROJECT, PO-NIGAHI , DISTT-SINGRAULI (MP)
Repairing of 04 Nos. Travel Motors of REL750E Drill Machine at Nigahi Project.
2026_NCL_357074_1
NGH/EXCV/TENDERS/25-26/106
Open Tender
Excavation Department Work
Item Rate
15 days
NCL NIGAHI PROJECT
AS PER NIT
4 documents required · 4 mandatory
₹5,200
25 Jul 2026
18 Mar 2026
1 Apr 2026
18 Mar 2026
31 Mar 2026
19 Mar 2026
18 Mar 2026 - 25 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Name and scope of work : Repairing of 04 Nos. Travel Motors of REL750E Drill Machine at Nigahi Project. Maximum likely manpower to be deployed per day : 06 Nos. (02 Nos. Skilled, 02 Nos. Semi-Skilled and 02nos Un-skilled). | |||||
| 2Cost / charges for repairing and rebuilding of inner and outer thrust bearing plate to get original micro finishing including labour charges contractor profit etc. ( required Skilled, Semi-Skilled and Un-skilled manpower to be deployed as per job requirement) (1No. for each Travel Motors ) (Total 04 Nos. Travel Motors ) | |||||
| 3Cost / charges for repairing and rebuilding of all piston sub-assembly to ge original equal size finishing including labour charges contractor profit etc. ( required Skilled, Semi-Skilled and Un-skilled manpower to be deployed as per job requirement) (1No. for each Travel Motors ) (Total 04 Nos. Travel Motors ) | |||||
| 3.01 | Cost/charges for lathe machineing , material and tools tackles ( 20 Hrs. each motor) (Total 04 Nos. Travel Motors ) job at Sl No. 03 | - | Hrs | - | - |
| 4Cost / charges for repairing and rebuilding of all piston sub-assembly bore to ge original equal size finishing including labour charges contractor profit etc. ( required Skilled, Semi-Skilled and Un-skilled manpower to be deployed as per job requirement) (1No. for each Travel Motors ) (Total 04 Nos. Travel Motors ) | |||||
| 4.01 | Cost/charges for lathe machineing , material and tools tackles ( 20 Hrs. each motor) (Total 04 Nos. Travel Motors ) job at Sl No. 04 | - | Hrs | - | - |
| 5Cost / charges for repairing and rebuilding of by pass sleeve to get original equal size finishing including including labour charges contractor profit etc. ( required Skilled, Semi-Skilled and Un-skilled manpower to be deployed as per job requirement) (1No. for each Travel Motors ) (Total 04 Nos. Travel Motors ) | |||||
| 5.01 | Cost/charges for lathe machineing , material and tools tackles ( 18 Hrs. each motor) (Total 04 Nos. Travel Motors ) job at Sl No.05 | - | Hrs | - | - |
| 6Cost / charges for replacement of seal kit ( to be provided by NCL) and dismantling , assembling and testing of motor including labour charges contractor profit etc. ( required Skilled and Un-skilled manpower to be deployed as per job requirement) (1No. for each Travel Motors ) (Total 04 Nos. Travel Motors ) | |||||
| 7Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.94 MB
UNDERTAKINGASPERANNEXURE-II.pdf
Tender Documents • 0.08 MB
BOQ_369938.xls
BOQ • 0.23 MB
ANNEXURESANDOTHERIMPORTENTDOCUMENT.pdf
Tender Documents • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .