Loading…
Loading…
Tender Value
₹26.5 L
EMD Value
₹53,080
Closing Date
6 Jun 2026, 6:00 pmDue tomorrow
EE PWD DN SHAHPURA
EE PWD DN SHAHPURA
Construction of Additional 2 Class Room in GUPS Samel ka Bhata and Construction of Additional 1 Class Room in GPS Ganeshpura (Bharat Khera) GP Sarsiya (Jahazpur) Package No. RJ07-23/DMFT /2025-26/GC12/Shahpura
2026_CEPWD_563050_4
Online NIT No 05/2026-27 EE PWD DN SHAHPURA
Open Tender
Civil Works
180 days
Jahazpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
5776 EE PWD DN SHAHPURA
₹53,080
Yes
28 May 2026
28 May 2026
8 Jun 2026
28 May 2026
6 Jun 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Part A Construction of Additional 2 Class Room in GUPS Samel ka Bhata
Earth work in excavation by mechanical means (Hydraulic Excavator
)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50
meter. All kinds of soils | 98.17 | CUM | 178 | ₹17,474.26 | BI01010001010000000000000515BI0100001113 |
| 2 | Providing and laying in position cement concrete including curing compaction etc. complete in spcified grade excluding the cost of centering and shuttering all work upto plinth level 1:4:8(1 cement:4
Coarse sand :8 graded stone aggregate 40 mm nominal size). | 24.75 | CUM | 3,302 | ₹81,724.5 | BI01010001010000000000000515BI0100001114 |
| 3 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for foundation, footings, strap beam, raft, base of column etc | 51.15 | SQM | 157 | ₹8,030.55 | BI01010001010000000000000515BI0100001115 |
| 4 | Steel Reinforcement:-P/F reinforcement for RCC work including straightening,cutting, bending, placing in position and binding (including cost of binding wire) all complete upto floor five level ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo- mechanically Treated bars (Conforming of relevent IS code) | 5,396.79 | KG. | 77 | ₹4,15,552.83 | BI01010001010000000000000515BI0100001116 |
| 5 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.
M20 grade Nominal Mix / Design Mix | 21.27 | CUM | 4,934 | ₹1,04,946.18 | BI01010001010000000000000515BI0100001117 |
| 6 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement
Mortar 1:6 ( 1-Cement : 6-Sand). | 65.05 | CUM | 2,838 | ₹1,84,611.9 | BI01010001010000000000000515BI0100001118 |
| 7 | Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc.Good soil of earth Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50
meter and with all lift. | 41.91 | CUM | 304 | ₹12,740.64 | BI01010001010000000000000515BI0100001119 |
| 8 | Random rubble dry stone Kharanja under floor. | 21.42 | CUM | 932 | ₹19,963.44 | BI01010001010000000000000515BI0100001120 |
| 9 | Brick work with clay flyash F.P.S. brick (IS 13757- 1993 ) of class designation 75 in superstructure above plinth level upto floor five level in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 31.57 | CUM | 4,832 | ₹1,52,546.24 | BI01010001010000000000000515BI0100001121 |
| 10 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. | 152.86 | SQM | 340 | ₹51,972.4 | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 5.21 MB
Tendernotice_2.pdf
PDF • 1.42 MB
Tendernotice_3.pdf
PDF • 2.39 MB
Tendernotice_4.pdf
PDF • 5.64 MB
Tendernotice_5.pdf
PDF • 15.81 MB
Tendernotice_6.pdf
PDF • 2.90 MB
Tendernotice_7.pdf
PDF • 0.22 MB
Tendernotice_8.pdf
PDF • 0.57 MB
BOQ_1002155.xls
BOQ • 0.45 MB
4.pdf
Tender Documents • 0.22 MB
Download all tender documents and submit your bid