| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC First Lowest amount quoted by the bidder is accepted |
| 2 | L2₹1.1 CrRejected-AOC | ₹1.1 Cr | L2 | Rejected-AOC Second Lowest amount quoted by the bidder |
| 3 | L3₹1.1 CrRejected-AOC | ₹1.1 Cr | L3 | Rejected-AOC Third Lowest amount quoted by the bidder |
| Sl No | Description | Qty | Unit | M.AMIRTHARAJ L2 | VMP ASSOCIATES L3 | VARSHA & CO L1 |
|---|---|---|---|---|---|---|
| 1.00 | Clean removal of cement plaster from walls | 3,775 | Sqm | 15 ₹56,625 | 10 ₹37,750 | 10 ₹37,750 |
| 2.00 | Plastering with Cement Mortor 1:4 (One cement and four sand) 20mm thick including all incidental chares such as scaffolding finishing curing for various depth and height below and above ground level etc complete as directed by the Engineer in charge of work complying with the standard specification | 3,775 | Sqm | 650 ₹24.5 L | 627 ₹23.7 L | 590 ₹22.3 L |
| 3.00 | Earth work deploying earth moving machineries for desilting channel and forming bund on either side depositing the earth on banks including jungle clearence ect.complete. Having width 3m to 10m | 1,080 | Cum | 55 ₹59,400 | 49 ₹52,920 | 48 ₹51,840 |
| 4.00 | Earth work deploying earth moving machineries for desilting channel and forming bund on either side depositing the earth on banks including jungle clearence ect.complete. Having width of more than 10m | 20,250 | Cum | 60 ₹12.2 L | 57 ₹11.5 L | 55 ₹11.1 L |
| 5.00 | Earth work excavation for foundation in all kinds of soils and sub soils except hard rock requiring blasting full depth as may be directed and depositing the surplus earth in places shown by the Engineer in - charge of work and leveling the same with all leads and lifts including shoring, strutting, shuttering, baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated etc. complete, complying with technical specifications and drawings as directed by the Engineer in - charge of work. | 57 | Cum | 300 ₹17,100 | 282 ₹16,074 | 265 ₹15,105 |
| 6.00 | Providing and placing in Position of Plain cement concrete of grade M10 using hard broken stone aggregate of maximum nominal size of 40mm to IS specified grading mixing by mixer machine including dewatering the placement site,laying the concrete in layers and in bays ,compacting and finishing the surface with all leads and lifts watering curing to attain the profile and strength as specified for various depth and height and above ground level etc complete as directed by the Engineer in charge of work complying with the standard specification | 15.5 | Cum | 6,000 ₹93,000 | 6,375 ₹98,812.50 | 5,965 ₹92,457.50 |
| 7.00Providing steel centering for sides and soffits including necessary supports and strutting for RCC slabs, beams or plain surface upto 3.00m height and all cross bracings using mild steel “B.G 10” gauge of size 90 x 60cm stiffened with welded mild steel angle of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joists of size 10cmx6.5cm spaced at about 90cm centre tocentre and supported by casurina props of 10 to 13cm dia spaced at 75cm centre to centre etc., complete complying with standard specification and as directed by the Departmental officers (The retrieved materials should be take back by the contractor) The payment for centering shall be given after the concrete is laid | ||||||
| 7.01 | without strutting | 56 | Sqm | 1,050 ₹58,800 | 1,060 ₹59,360 | 999 ₹55,944 |
| 7.02 | with strutting | 132 | Sqm | 1,200 ₹1.6 L | 1,175 ₹1.6 L | 1,100 ₹1.5 L |
| 8.00 | Providing and placing in Position of Plain cement concrete of grade M15 using 60% of 40 mm and 40% of 20mm hard broken stone aggregate of maximum nominal size to IS specified grading mixing by mixer machine including dewatering the placement site,laying the concrete in layers and in bays vibrating,compacting and finishing the surface with all leads and lifts watering curing to attain the profile and strength as specified in the drawing for various depth and height below and above ground level etc complete as directed by the Engineer in charge of work complying with the standard specification | 84 | Cum | 6,500 ₹5.5 L | 7,155 ₹6.0 L | 6,690 ₹5.6 L |
Tender Value
₹1.0 Cr
EMD Value
₹61,000
Closing Date
21 Aug 2025, 3:00 pmClosed
Superintending Engineer,WRD
O/o The Superintending Engineer,WRD Thamiraparani Basin Circle Tirunelveli Bill of Quantities
Rehabilitaiton Of Mylapudur Anicut In Mylapudur Village In Radhapuram Taluk Of Tirunelvlei District
2025_WRD_592103_1
01SE/TBC/TNY/2025-26(4)
Open Tender
Civil Works - Water Works
365 days
Tirunelveli
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹61,000
8 Dec 2025
12 Aug 2025
22 Aug 2025
12 Aug 2025
21 Aug 2025
12 Aug 2025
Amount
Clean removal of cement plaster from walls
Plastering with Cement Mortor 1:4 (One cement and four sand) 20mm thick including all incidental chares such as scaffolding finishing curing for various depth and height below and above ground level etc complete as directed by the Engineer in charge of work complying with the standard specification
Earth work deploying earth moving machineries for desilting channel and forming bund on either side depositing the earth on banks including jungle clearence ect.complete. Having width 3m to 10m
Earth work deploying earth moving machineries for desilting channel and forming bund on either side depositing the earth on banks including jungle clearence ect.complete. Having width of more than 10m
Earth work excavation for foundation in all kinds of soils and sub soils except hard rock requiring blasting full depth as may be directed and depositing the surplus earth in places shown by the Engineer in - charge of work and leveling the same with all leads and lifts including shoring, strutting, shuttering, baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated etc. complete, complying with technical specifications and drawings as directed by the Engineer in - charge of work.
Providing and placing in Position of Plain cement concrete of grade M10 using hard broken stone aggregate of maximum nominal size of 40mm to IS specified grading mixing by mixer machine including dewatering the placement site,laying the concrete in layers and in bays ,compacting and finishing the surface with all leads and lifts watering curing to attain the profile and strength as specified for various depth and height and above ground level etc complete as directed by the Engineer in charge of work complying with the standard specification
Providing steel centering for sides and soffits including necessary supports and strutting for RCC slabs, beams or plain surface upto 3.00m height and all cross bracings using mild steel “B.G 10” gauge of size 90 x 60cm stiffened with welded mild steel angle of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joists of size 10cmx6.5cm spaced at about 90cm centre tocentre and supported by casurina props of 10 to 13cm dia spaced at 75cm centre to centre etc., complete complying with standard specification and as directed by the Departmental officers (The retrieved materials should be take back by the contractor) The payment for centering shall be given after the concrete is laid
without strutting
with strutting
Providing and placing in Position of Plain cement concrete of grade M15 using 60% of 40 mm and 40% of 20mm hard broken stone aggregate of maximum nominal size to IS specified grading mixing by mixer machine including dewatering the placement site,laying the concrete in layers and in bays vibrating,compacting and finishing the surface with all leads and lifts watering curing to attain the profile and strength as specified in the drawing for various depth and height below and above ground level etc complete as directed by the Engineer in charge of work complying with the standard specification
Drilling holes 50mm dia in existing body wall for placing anchor rods etc. complete
Grouting the holes of 50mm dia with w/c ratio of 0.33 in the existing anicut body wall provided at a spacing of 80 cm c/c in a staggered manner in the vertical surface for fixing anchor rod of 16 mm dia RTS of 1m length in a such position that 60 cm length embeded into the masonry wall at a downward inclinations of 5 degree to horizontal and 40 cm length projected and bend out side the wall including cleaning the drilled hole fixing the rod and other incidential charges etc.
Supplying fabricating and placing in position of Ribbed Tor steel bars of Various diameter for all reinforced cement concrete works including cost of rods binding wire labour charges for cutting the rods to the required length , bending ,tying and fixing in position complete for various height and above ground level etc complete as directed by the Engineer in charge of work complying with the standard specification
Providing and placing in Position of Reinforced cement concrete of grade M20 using hard broken stone aggregate of maximum nominal size of 20mm to IS specified grading mixing by mixer machine including dewatering the placement site,laying the concrete in layers and in bays vibrating,compacting and finishing the surface with all leads and lifts watering curing to attain the profile and strength as specified in the drawing for various depth and height below and above ground level etc complete as directed by the Engineer in charge of work complying with the standard specification.
Fabricating, Supplying and erection of Screw gearing steel shutters of size above 2.00 m and upto 3.00m width consist of skin plate made out of 10mm thick mild steel plate and horizontally stiffened with 150x75mm ISMB 150 at an interval not more than 0.50m and vertical stiffeners made out of 100x50mm mild steel channel ISMC at an interval not more than 0.60m and provided with 10mm thick mild steel gusset plateof required size on both sides fastened with rust free bolts and nuts etc.Conveying the fabricated shutter by using lorries including loading, unloading and leading the shutter to the vent. Dismantling the eroded shutter and shuttering arrangements by using necessary gas cutting equipments Erecting the new shutter and the shuttering arrangements in the vent in proper position by using necessary hoisting equipments. The shutter shall be painted with two coats of Anticorrosive black paint over one coat of Red Oxide Primer. The rate including cost of materials consumables, labours power charges, conveyance charges for all equipments required conveying the dismantled materials to the section stores, cost of petty civil works, trial operation of shutter and warranty for 5 years etc..complete.
Providing new 3T capacity worm gear box assembly consist of cast iron top and bottom plates, worm nut made up of pig iron, worm shaft made up of EN8 steel rod and two numbers of thrust bearings. The top and bottom plates machined to suit the worm nut and shaft. The worm nut threaded inside to suit the 63mm dia screw rod and the outer side formed with helical teeth cutting to suit the worm shaft. The worm shaft machined to the required shape and size and provided with helical teeth to suit with the worm nut.The assembly fixed with two numbers of thrust bearing one on top and another on bottom of the worm nut and fastened with required bolt and nuts. The operating key made with 80mm square rod shaping with wire cutting machine and welded with operating handle made up of 32mm dia steel rod for required length. The gear box is to be rest on the top of MS stand made up of 75 x 75 x8mm MS angle and the top covered with 16mm thick MS plate and the stand fixed on the 150x75mm MS channel fixed over top of the beams in platform. The gear box align with the screw rod and fixed with required bolts nuts etc., complete and as directed by the departmental officers. Painting the hoisting arrangements with two coat of aluminium oxide paint over two coat of zinc rich primer The rate including cost of worm gear, cost of all materials required, labour charges, process charges like gas cutting, welding, machining, milling, labour charges for dismantling, loading, lifting, unloading, transport, erection, charges for equipment’s like derrick, chain pulley block, conveyance charges of to and fro of equipment’s and labours to the site including cost of trial operation of the Shutter, inclusive of all taxes, etc., complete and as directed by the departmental officers and warranty for 5years etc., complete .
M.AMIRTHARAJ (BID ID -1435975)
VMP ASSOCIATES (BID ID -1436062)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid