Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.2 LAccepted-AOC | ₹33.2 L | L1 | Accepted-AOC L1 Tenderer |
| 2 | L2₹34.5 L+₹1.3 L (3.92%)Rejected-Finance | ₹34.5 L+₹1.3 L (3.92%) | L2 | Rejected-Finance L2 Tenderer |
Tender Value
₹33.6 L
Closing Date
12 Mar 2024, 3:00 pmClosed
The Additional Collector ( DEV) DRDA Chengalpa
o/o The Additional Collector ( DEV) DRDA Chengalpattu
Providing Cement Concrete Road 2 Nos in Thaiyur village Habitation at Thaiyur Village Panchayat of Thiruporur Panchayat Union of Chengalpattu District under Local Authority Fund Package No 43
2024_RDTN_442900_1
RC.No.0745/2024/A14, dt 05.03.2024
Open Tender
Civil Works - Roads
Item Rate
90 days
Thiruporur
Please refer Tender documents.
8 documents required · 8 mandatory
₹34,000
Exempted
2 Sept 2024
6 Mar 2024
12 Mar 2024
6 Mar 2024
12 Mar 2024
6 Mar 2024
Amount
Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B
Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. complete.
Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete.
Cement concrete 1:3:6 mix using 20mm HBG metal for foundation and basement etc. complete.
Providing GSB Grade III from approved quarry and staking them at site to dept. gauge for pre-measurement including cost and conveyance of all materials to site and all labour charges at site including watering and compaction etc complete as per standard specification.
Cement concrete 1:2:4 mix using 20mm HBG metal for foundation and basement etc. complete.
Providing surface vibrator charges including all labour charges etc complete
Painting with core wall including all labour charges etc complete
Filling with US Gravel Including Cost and Conveyance of all charges etc.
Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B
Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. complete.
Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete.
Cement concrete 1:3:6 mix using 20mm HBG metal for foundation and basement etc. complete.
Providing GSB Grade III from approved quarry and staking them at site to dept. gauge for pre-measurement including cost and conveyance of all materials to site and all labour charges at site including watering and compaction etc complete as per standard specification.
Cement concrete 1:2:4 mix using 20mm HBG metal for foundation and basement etc. complete.
Providing surface vibrator charges including all labour charges etc complete
Painting with core wall including all labour charges etc complete
Filling with US Gravel Including Cost and Conveyance of all charges etc.
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A.AKBAR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .