Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹65.7 LAdmitted-Fee/PreQual/Technical/Finance | -37.85% | ₹65.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹67.0 L+₹1.3 L (2.01%)Admitted-Fee/PreQual/Technical/Finance | -36.60% | ₹67.0 L+₹1.3 L (2.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹67.1 L+₹1.4 L (2.16%)Admitted-Fee/PreQual/Technical/Finance | -36.51% | ₹67.1 L+₹1.4 L (2.16%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹73.0 L+₹7.4 L (11.2%)Admitted-Fee/PreQual/Technical/Finance | -30.86% | ₹73.0 L+₹7.4 L (11.2%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹73.2 L+₹7.5 L (11.5%)Admitted-Fee/PreQual/Technical/Finance | -30.73% | ₹73.2 L+₹7.5 L (11.5%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
22 May 2026, 2:30 pmClosed
AS PER THE NIT
AS PER THE NIT
Upgradation of existing Hostel Block in Abhedananda Home Solina Srinagar (Balance Work)
2026_PWDJK_309989_1
NIT NO 10/RNB/RAJ OF 2026-27 DATED 14.05.2026.
Open Tender
Civil Works
Percentage
160 days
SRINAGAR
AS PER THE NIT
2 documents required · 2 mandatory
₹2,600
AS PER THE NIT
₹2.5 L
3 Jun 2026
14 May 2026
22 May 2026
15 May 2026
22 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part A | |||||
| 1.01 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles above 25 mm and upto 40 mm. | 8.36 | Sqm | - | - |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix) | 1.68 | Cum | - | - |
| 3 | Dismantling of wash basin including Pedestal of all types (C.I/ PVC/ Vitreous china) including stacking of useful materials near the sit and disposal of unserviceable materials within 50 metres lead as per the directions of Engineer-in-charge at site complete. | 2 | No. | - | - |
| 4 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) including carriage of all materials upto site of work complete. | 24.16 | Sqm | - | - |
| 5 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate including cost and carriage of material upto site of work complete job. | 8.36 | Sqm | - | - |
| 6 | Providing and laying vitrified tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622 of approved make, in all colours and shades, in walls, skirting, riser of steps, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS: 15477, in average 6mm thickness, including grouting of joints (payment for grouting of joints to be made separately). Size of tile 600 x 1200 mm. | 23.33 | Sqm | - | - |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand) including carriage of all materials upto site of work complete. | 0.56 | Cum | - | - |
| 8 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 0.56 | Cum | - | - |
| 9 | 15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 4 ( 1 cement : 4 fine sand) including carriage of all materials upto site of work complete. | 6.04 | Sqm | - | - |
stage.html
html • 0.04 MB
finance_1003146.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_1003146.xls
BOQ • 0.30 MB
Corrigendum.pdf
PDF • 0.79 MB
eNIT.pdf
PDF • 1.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .