Chief Engineer, Water Resources Department, Assam
O/O Chief Engineer Water Resources Department, Basistha, Guwahati 29
Underwater riverbank protection works (Section 1) and above water riverbank protection works (Section 2) in Goalpara subproject (Barpeta, Goalpara and Dhubri Districts) (Lot 1) (Rebid)
2026_WREAP_53000_1
WRD/ADB-P2/OCB-Works/07
Open Tender
Civil Works
1080 days
Barpeta
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹40 L
Yes
GUWAHATI
8 Jul 2026
8 Jul 2026
30 Jul 2026
8 Jul 2026
30 Jul 2026
25 Jul 2026
8 Jul 2026 - 15 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Lot 1: Underwater riverbank protection works (Section 1) and above water riverbank protection works (Section 2) at Barpeta District under Barpeta W.R. Division I. SECTION 1: Underwater works and temporary slope protection works 1 FOR UNDERWATER WORKS: | |||||
| 1.01 | Carriage of Geo Bags of size 1.03 × 0.70 m / 1.0 x 0.7m including loading & unloading, stacking, etc. complete and including hire charge of truck with driver and handyman cost of POL etc. completed as directed.
Distance from Divisional Store to Work Site = 10KM | 0.49 | Each/ Km | 1 | ₹0.49 |
| 1.02 | Excavation of specified silt from flood plain or adjacent chars, within a distance of 2000m of the work site and filling geobags of size 1.03M x 0.70M with silt, Weighing the same, for each silt filled bags to weigh 126 kg after filling, stitching the mouth of the filled bags with polypropylene or polyster thread by power driven double needle machine as per drawing and technical specification, stockpiling the same in batches of 100 for easy counting and carrying the same and unloading in the work site or in the dumping pontoon / barge stationed in the work site by engine boat including all loading and unloading, handling charges and any local carriage within a distance of 250m including all lead and lift etc. complete as directed. (Geo bags and polypropylene thread will be supplied by the Deptt. free of cost.) | 0.49 | Per Bag | 1 | ₹0.49 |
| 1.03 | Filling and laying of Geo bags of size 1.03 m × 0.70 m excluding excavation of sand/silt from flood plain or adjacent chars within a distance of 90 m of the work site, filling geo bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling , double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150 m and laying properly as directed.
(Sand/silt, Geo Bag and Polypropylene thread will be supplied by the department free of cost) With Boat | 0.87 | Per Bag | 1 | ₹0.87 |
| 1.04 | Dumping of sand/silt Geo-bags from properly positioned and anchored flat top pontoop / barge over an area specified by bathymetric survey for uniform area coverage along the bank line upto the designed length towards making a provisional falling apron at the end of the section away from bank line including loading, unloading, sequential stacking on the pontoon / barge including mobilisation of all necessary equipment etc. complete as per technical specification and approved design and contractor's method statement, the pontoon (minimum length-30m) position shall be monitored by RTK-GPS or Total Station upto a accuracy of + 10cm and a minimum 30m long barge / pontoon and should cover at least an area of 30m x 20m per working day including the provisional falling apron as per design and technical specification and direction of engineer-in-charge, as per the Specification. | 0.32 | Per Bag | 1 | ₹0.32 |
| 2FOR TEMPORARY PROTECTION OF SLOPE | |||||
| 2.01 | Carriage of 300 gsm Geo sheet of including loading & unloading, stacking cost of P.O.L. etc. complete and including hire charge of truck with driver and handyman, etc. completed as directed. (Distance to be calculated from Divisional Store)
Distance from Divisional Store to Work Site = 10KM | - | Sqm/Km | 1 | - |
| 2.02 | Labour charge for laying Geo fabric sheet as filter bellow pitching including carrying, lapping, wrapping & stitching as directed by the Engineer-in-Charge. | - | Sqm | 1 | - |
| 2.03 | Carriage of Geo Bags of size 1.03 × 0.70 m / 1.0 x 0.7m including loading & unloading, stacking, etc. complete and including hire charge of truck with driver and handyman cost of POL etc. completed as directed.
Distance from Divisional Store to Work Site = 10KM | 0.29 | Bag/Km | 1 | ₹0.29 |
| 2.04 | Filling and laying of Geo bags of size 1.03 m × 0.70 m excluding excavation of sand/silt from flood plain or adjacent chars within a distance of 90 m of the work site, filling geo bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling , double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150 m and laying properly as directed. (Sand/silt, Geo Bag and Polypropylene thread will be supplied by the department free of cost)
Without Boat | 0.29 | Per Bag | 1 | ₹0.29 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.15 MB
tech_bid_goalpara_barpeta_Lot_1_rebid.pdf
Tender Documents • 2.52 MB
BOQ_83548.xls
BOQ • 0.33 MB
Price_Bid_Glpra_Barpeta_Lot_1_rbid_final.pdf
Additional Documents • 0.19 MB
Annexure_A_EMP_EMoP_Barpeta_Lot_1.pdf
Additional Documents • 0.38 MB
Annexure_B_Bio_Diversity_Plan.pdf
Additional Documents • 1.76 MB
EHSMP_Format_Bidders.pdf
Additional Documents • 0.10 MB
Download all tender documents and submit your bid