| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.7 CrAdmitted-Finance INFINITY THINK TANK TOWER II 10TH FLOOR PLOT NO A3 BLOCK G SECTOR V SALT LAKE CITY KOLKATA 700091 WB | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹38.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹39.0 CrAdmitted-Finance | ₹39.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹39.7 CrAdmitted-Finance T 3 PARMESHWARI BLDG CHATRIBARI RD GUWAHATI ASSAM 781001 | KAMRUP METRO | ASSAM | 781001 | ₹39.7 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | TECHNO POWER ENTERPRISES PVT LTD L1 | Shyama Power India Limited L2 | T and T Projects Ltd L3 |
|---|---|---|---|---|---|---|
| 1.00Ukhrul District (Supply) | ||||||
| 2.00New 11 KV line using ACSR Rabbit (13.0 Km) | ||||||
| 3.00 | 9.0 m Steel Tubular Pole (410:SP-31) - (embossing as per design drawing of REC) | 260 | Nos. | 28,094.62 ₹3.9 Cr | 28,567.8 ₹4.0 Cr | 29,196.74 ₹4.1 Cr |
| 4.00 | Galvanised Pole top bracket | 182 | Nos. | 594.72 ₹5.8 L | 665.52 ₹6.5 L | 463.74 ₹4.5 L |
| 5.00 | Galvanised Clamp for Pole top Bracket | 364 | Nos. | 295 ₹5.8 L | 420.08 ₹8.2 L | 394.12 ₹7.7 L |
| 6.00 | Galvanised Cross arm(75X40)mm | 182 | Nos. | 1,529.28 ₹15.0 L | 1,683.86 ₹16.5 L | 2,020.16 ₹19.8 L |
| 7.00 | Galvanised Back clamp for X-arm | 182 | Nos. | 295 ₹2.9 L | 420.08 ₹4.1 L | 394.12 ₹3.9 L |
| 8.00 | Galvanised 2x2.2m D.P. channel X-arm (75X40)mm | 39 | Set | 5,853.98 ₹12.3 L | 6,445.16 ₹13.5 L | 7,096.52 ₹14.9 L |
| 9.00 | 11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware) | 234 | Nos. | 1,473.82 ₹18.6 L | 1,647.28 ₹20.8 L | 2,096.86 ₹26.4 L |
| 10.00 | 11 KV Pin Composite/Polymer Insulator (Complete with Pin ) | 663 | Nos. | 764.64 ₹27.3 L | 855.5 ₹30.5 L | 954.62 ₹34.1 L |
Tender Value
₹3.6 Cr
EMD Value
₹10 L
Closing Date
26 Dec 2020, 3:00 pmClosed
Managing Director, MSPDCL
Secure Office Complex, 3rd Floor, North AOC, A.T. Line Imphal West, Manipur-795001
Implementation of System Strengthening under DDUGJY New Project in Hill Districts of Manipur on turn key basis.
2020_MSPDC_1191_2
2/198(Syst-Strength)2020-MSPDC
Open Tender
Electrical Works
365 days
As per NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹25,000
Managing Director, MSPDCL
₹10 L
MSPDCL
6 Jan 2021
4 Dec 2020
28 Dec 2020
4 Dec 2020
26 Dec 2020
15 Dec 2020
14 Dec 2020
Ukhrul District (Supply)
New 11 KV line using ACSR Rabbit (13.0 Km)
9.0 m Steel Tubular Pole (410:SP-31) - (embossing as per design drawing of REC)
Galvanised Pole top bracket
Galvanised Clamp for Pole top Bracket
Galvanised Cross arm(75X40)mm
Galvanised Back clamp for X-arm
Galvanised 2x2.2m D.P. channel X-arm (75X40)mm
11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware)
11 KV Pin Composite/Polymer Insulator (Complete with Pin )
ACSR Conductor (Rabbit)
11 KV AB Switch/G.O. Switch with Galvanised X-arm etc.
Stay Set complete with stay wire, base plate, stay rod etc.
Galvanised Stay Clamp
Galvanised Bracing for D.P.structure, 50X50X6mm M.S. Angle
Galvanised Clamp for D.P. Bracing
Galvanised Anti climbing device complete
Earthing set complete with G.I. wire
Guarding at crossing with G.I. wire
Nuts, Bolts, MS flat as support for item No. 3 jointing sleeves etc.@7kg/km
Al. Binding wire, UPG clamps etc. @10 kg/km
Sundries like pole painting Danger plate etc.
Installation of Distribution Transformer
Installation of New Distribution Transformer of 63 KVA (15 Nos.)
9.0 m Steel Tubular Pole (410:SP-31) - (embossing as per design drawing of REC)
Galvanised Channel 100X50,@ 7.9 Kg/m 2.8X2 for supporting Transformer
Galvanised Clamp for transformer base channel for M.S. flat [email protected]/m 0.27mX2.
Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for D.P. X-arm
Galvanised Channel 100X50,@7.9 Kg/m 0.46X2 for supporting of item 2
Galvanised Channel 75X40,@5.7Kg/m 2X2.8m for HG fuse unit & A.B. switch
Galvanised Clamp for A.B. switch/HG Fuse/DO Fuse, 50X8mm @ 3.1Kg/m 0.23mX2=0.46m.
Galvanised Channel 75X40,@5.7Kg/m 2X0.5m for supporting H.G. fuse main channel X-arm
Galvanised Angle (50X50X6)mm 2.8X2 @ 4.5 Kg/m transformer belting and Angle (35X35X5),0.46X2 @ 2.6 Kg/m. Transformer belting support.
Galvanised Clamp for transformer belting
Distribution transformer 63 KVA as per IS:1180(2014) level-II
A.B.Switch (set of 3)
Horn gap fuse unit/D.O. fuse, 3 -Ph (set of 3)
DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required.
1.1KV grade, 3½ core 120 Sq.mm PVC insulated aluminium power cable
D.B.box Galvanised cross arm of M.S. Angle 35X35X5mm @ 2.6Kg/m 2.8X2 = 5.6m
Galvanised Clamp for DB Box Cross arm
Sub-Station Earthing (set of 3 Earthing Pipe)
3 phase Tri-vector Energy meter comprising of IS 14697-1999 with Kiosk
Danger board & Sign Board( As per drawing of REC)
11 KV lightening arrestor
11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware)
Bolts,Nuts,clamps etc.@5kg/DTR
Sundries, Pole painting etc.
Installation of New Distribution Transformer of 100 KVA (3 Nos)
9.0 m Steel Tubular Pole (410:SP-31) - (embossing as per design drawing of REC)
Galvanised Channel 100X50,@ 7.9 Kg/m 2.8X2 for supporting Transformer
Galvanised Clamp for transformer base channel for M.S. flat [email protected]/m 0.27mX2.
Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for D.P. X-arm
Galvanised Channel 100X50,@7.9 Kg/m 0.46X2 for supporting of item 2
Galvanised Channel 75X40,@5.7Kg/m 2X2.8m for HG fuse unit & A.B. switch
Galvanised Clamp for A.B. switch/HG Fuse/DO Fuse, 50X8mm @ 3.1Kg/m 0.23mX2=0.46m.
Galvanised Channel 75X40,@5.7Kg/m 2X0.5m for supporting H.G. fuse main channel X-arm
Galvanised Angle (50X50X6)mm 2.8X2 @ 4.5 Kg/m transformer belting and Angle (35X35X5),0.46X2 @ 2.6 Kg/m. Transformer belting support.
Galvanised Clamp for transformer belting
Distribution transformer 100 KVA as per IS:1180(2014) level-II
A.B.Switch (set of 3)
Horn gap fuse unit/D.O. fuse, 3 -Ph (set of 3)
DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required.
1.1KV grade, 3½ core 120 Sq.mm PVC insulated aluminium power cable
D.B.box Galvanised cross arm of M.S. Angle 35X35X5mm @ 2.6Kg/m 2.8X2 = 5.6m
Galvanised Clamp for DB Box Cross arm
Sub-Station Earthing (set of 3 Earthing Pipe)
3 phase Tri-vector Energy meter comprising of IS 14697-1999 with Kiosk
Danger board & Sign Board( As per drawing of REC)
11 KV lightening arrestor
11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware)
Bolts,Nuts,clamps etc.@5kg/DTR
Sundries, Pole painting etc.
Arial Bunched Cable
New LT Line Using 3 phase 4 wire with AB Cable (3x50+1x35)Sq.mm (13.0 Km.)
8.0 m S.T.P.(410:SP-14) (embossing as per drawing of REC)
M.S. cross arm (75X40) mm, 500 mm long
Back clamp for cross arm
Dead end fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
Suspension fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
AB Cable (3x50+1x35)Sq.mm with insulated messenger/Neutral
Insulation piercing connector suitable for AB Cable (50/35 Sq.mm. Main & Branch) as per TS & Construction Standard {Main 16-95 Sq. mm Service: 4-35(50) Sq. mm & Neutral 16-95 Sq. mm Service: 2-15 Sg. Mm)}
Earthing set complete with G.I. wire.
G.I. wire. No 10 S.W.G. (90 Kg. per 1.09Km.)
Stay set complete with stay wire and insulator clamp etc.
Bolts & Nuts with [email protected]/km
Sundaries,Pole painting, Danger plate, Number Plate etc.
New LT Line Using 1 phase 2 wire with AB Cable (1X35+1x25)Sq.mm (23.0 Km.)
8.0 m S.T.P.(410:SP-14) (embossing as per drawing of REC)
M.S. cross arm (75X40) mm, 500 mm long
Back clamp for cross arm
Dead end fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
Suspension fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
AB Cable (1x35+1x25)Sq.mm with insulated messenger/Neutral
Insulation piercing connector suitable for AB Cable (50/35 Sq.mm. Main & Branch) as per TS & Construction Standard {Main 16-95 Sq. mm Service: 4-35(50) Sq. mm & Neutral 16-95 Sq. mm Service: 2-15 Sg. Mm)}
Earthing set complete with G.I. wire.
G.I. wire. No 10 S.W.G. (90 Kg. per 1.09Km.)
Stay set complete with stay wire and insulator clamp etc.
Bolts & Nuts with [email protected]/km
Sundaries,Pole painting, Danger plate, Number Plate etc.
Tamenglong (Supply)
New 11 KV line using ACSR Rabbit (13.0 Km)
9.0 m Steel Tubular Pole (410:SP-31) - (embossing as per design drawing of REC)
Galvanised Pole top bracket
Galvanised Clamp for Pole top Bracket
Galvanised Cross arm(75X40)mm
Galvanised Back clamp for X-arm
Galvanised 2x2.2m D.P. channel X-arm (75X40)mm
11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware)
11 KV Pin Composite/Polymer Insulator (Complete with Pin )
ACSR Conductor (Rabbit)
11 KV AB Switch/G.O. Switch with Galvanised X-arm etc.
Stay Set complete with stay wire, base plate, stay rod etc.
Galvanised Stay Clamp
Galvanised Bracing for D.P.structure, 50X50X6mm M.S. Angle
Galvanised Clamp for D.P. Bracing
Galvanised Anti climbing device complete
Earthing set complete with G.I. wire
Guarding at crossing with G.I. wire
Nuts, Bolts, MS flat as support for item No. 3 jointing sleeves etc.@7kg/km
Al. Binding wire, UPG clamps etc. @10 kg/km
Sundries like pole painting Danger plate etc.
Installation of Distribution Transformer
Installation of New Distribution Transformer of 63 KVA (15 Nos.)
9.0 m Steel Tubular Pole (410:SP-31) - (embossing as per design drawing of REC)
Galvanised Channel 100X50,@ 7.9 Kg/m 2.8X2 for supporting Transformer
Galvanised Clamp for transformer base channel for M.S. flat [email protected]/m 0.27mX2.
Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for D.P. X-arm
Galvanised Channel 100X50,@7.9 Kg/m 0.46X2 for supporting of item 2
Galvanised Channel 75X40,@5.7Kg/m 2X2.8m for HG fuse unit & A.B. switch
Galvanised Clamp for A.B. switch/HG Fuse/DO Fuse, 50X8mm @ 3.1Kg/m 0.23mX2=0.46m.
Galvanised Channel 75X40,@5.7Kg/m 2X0.5m for supporting H.G. fuse main channel X-arm
Galvanised Angle (50X50X6)mm 2.8X2 @ 4.5 Kg/m transformer belting and Angle (35X35X5),0.46X2 @ 2.6 Kg/m. Transformer belting support.
Galvanised Clamp for transformer belting
Distribution transformer 63 KVA as per IS:1180(2014) level-II
A.B.Switch (set of 3)
Horn gap fuse unit/D.O. fuse, 3 -Ph (set of 3)
DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required.
1.1KV grade, 3½ core 120 Sq.mm PVC insulated aluminium power cable
D.B.box Galvanised cross arm of M.S. Angle 35X35X5mm @ 2.6Kg/m 2.8X2 = 5.6m
Galvanised Clamp for DB Box Cross arm
Sub-Station Earthing (set of 3 Earthing Pipe)
3 phase Tri-vector Energy meter comprising of IS 14697-1999 with Kiosk
Danger board & Sign Board( As per drawing of REC)
11 KV lightening arrestor
11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware)
Bolts,Nuts,clamps etc.@5kg/DTR
Sundries, Pole painting etc.
Installation of New Distribution Transformer of 100 KVA (3 Nos)
9.0 m Steel Tubular Pole (410:SP-31) - (embossing as per design drawing of REC)
Galvanised Channel 100X50,@ 7.9 Kg/m 2.8X2 for supporting Transformer
Galvanised Clamp for transformer base channel for M.S. flat [email protected]/m 0.27mX2.
Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for D.P. X-arm
Galvanised Channel 100X50,@7.9 Kg/m 0.46X2 for supporting of item 2
Galvanised Channel 75X40,@5.7Kg/m 2X2.8m for HG fuse unit & A.B. switch
Galvanised Clamp for A.B. switch/HG Fuse/DO Fuse, 50X8mm @ 3.1Kg/m 0.23mX2=0.46m.
Galvanised Channel 75X40,@5.7Kg/m 2X0.5m for supporting H.G. fuse main channel X-arm
Galvanised Angle (50X50X6)mm 2.8X2 @ 4.5 Kg/m transformer belting and Angle (35X35X5),0.46X2 @ 2.6 Kg/m. Transformer belting support.
Galvanised Clamp for transformer belting
Distribution transformer 100 KVA as per IS:1180(2014) level-II
A.B.Switch (set of 3)
Horn gap fuse unit/D.O. fuse, 3 -Ph (set of 3)
DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required.
1.1KV grade, 3½ core 120 Sq.mm PVC insulated aluminium power cable
D.B.box Galvanised cross arm of M.S. Angle 35X35X5mm @ 2.6Kg/m 2.8X2 = 5.6m
Galvanised Clamp for DB Box Cross arm
Sub-Station Earthing (set of 3 Earthing Pipe)
3 phase Tri-vector Energy meter comprising of IS 14697-1999 with Kiosk
Danger board & Sign Board( As per drawing of REC)
11 KV lightening arrestor
11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware)
Bolts,Nuts,clamps etc.@5kg/DTR
Sundries, Pole painting etc.
Arial Bunched Cable
New LT Line Using 3 phase 4 wire with AB Cable (3x50+1x35)Sq.mm (12.0 Km.)
8.0 m S.T.P.(410:SP-14) (embossing as per drawing of REC)
M.S. cross arm (75X40) mm, 500 mm long
Back clamp for cross arm
Dead end fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
Suspension fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
AB Cable (3x50+1x35)Sq.mm with insulated messenger/Neutral
Insulation piercing connector suitable for AB Cable (50/35 Sq.mm. Main & Branch) as per TS & Construction Standard {Main 16-95 Sq. mm Service: 4-35(50) Sq. mm & Neutral 16-95 Sq. mm Service: 2-15 Sg. Mm)}
Earthing set complete with G.I. wire.
G.I. wire. No 10 S.W.G. (90 Kg. per 1.09Km.)
Stay set complete with stay wire and insulator clamp etc.
Bolts & Nuts with [email protected]/km
Sundaries,Pole painting, Danger plate, Number Plate etc.
New LT Line Using 1 phase 2 wire with AB Cable (1X35+1x25)Sq.mm (22.0 Km.)
8.0 m S.T.P.(410:SP-14) (embossing as per drawing of REC)
M.S. cross arm (75X40) mm, 500 mm long
Back clamp for cross arm
Dead end fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
Suspension fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
AB Cable (1x35+1x25)Sq.mm with insulated messenger/Neutral
Insulation piercing connector suitable for AB Cable (50/35 Sq.mm. Main & Branch) as per TS & Construction Standard {Main 16-95 Sq. mm Service: 4-35(50) Sq. mm & Neutral 16-95 Sq. mm Service: 2-15 Sg. Mm)}
Earthing set complete with G.I. wire.
G.I. wire. No 10 S.W.G. (90 Kg. per 1.09Km.)
Stay set complete with stay wire and insulator clamp etc.
Bolts & Nuts with [email protected]/km
Sundaries,Pole painting, Danger plate, Number Plate etc.
Senapati District (Supply)
New 11 KV line using ACSR Rabbit (13.0 Km)
9.0 m Steel Tubular Pole (410:SP-31) - (embossing as per design drawing of REC)
Galvanised Pole top bracket
Galvanised Clamp for Pole top Bracket
Galvanised Cross arm(75X40)mm
Galvanised Back clamp for X-arm
Galvanised 2x2.2m D.P. channel X-arm (75X40)mm
11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware)
11 KV Pin Composite/Polymer Insulator (Complete with Pin )
ACSR Conductor (Rabbit)
11 KV AB Switch/G.O. Switch with Galvanised X-arm etc.
Stay Set complete with stay wire, base plate, stay rod etc.
Galvanised Stay Clamp
Galvanised Bracing for D.P.structure, 50X50X6mm M.S. Angle
Galvanised Clamp for D.P. Bracing
Galvanised Anti climbing device complete
Earthing set complete with G.I. wire
Guarding at crossing with G.I. wire
Nuts, Bolts, MS flat as support for item No. 3 jointing sleeves etc.@7kg/km
Al. Binding wire, UPG clamps etc. @10 kg/km
Sundries like pole painting Danger plate etc.
Installation of Distribution Transformer
Installation of New Distribution Transformer of 63 KVA (13 Nos.)
9.0 m Steel Tubular Pole (410:SP-31) - (embossing as per design drawing of REC)
Galvanised Channel 100X50,@ 7.9 Kg/m 2.8X2 for supporting Transformer
Galvanised Clamp for transformer base channel for M.S. flat [email protected]/m 0.27mX2.
Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for D.P. X-arm
Galvanised Channel 100X50,@7.9 Kg/m 0.46X2 for supporting of item 2
Galvanised Channel 75X40,@5.7Kg/m 2X2.8m for HG fuse unit & A.B. switch
Galvanised Clamp for A.B. switch/HG Fuse/DO Fuse, 50X8mm @ 3.1Kg/m 0.23mX2=0.46m.
Galvanised Channel 75X40,@5.7Kg/m 2X0.5m for supporting H.G. fuse main channel X-arm
Galvanised Angle (50X50X6)mm 2.8X2 @ 4.5 Kg/m transformer belting and Angle (35X35X5),0.46X2 @ 2.6 Kg/m. Transformer belting support.
Galvanised Clamp for transformer belting
Distribution transformer 63 KVA as per IS:1180(2014) level-II
A.B.Switch (set of 3)
Horn gap fuse unit/D.O. fuse, 3 -Ph (set of 3)
DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required.
1.1KV grade, 3½ core 120 Sq.mm PVC insulated aluminium power cable
D.B.box Galvanised cross arm of M.S. Angle 35X35X5mm @ 2.6Kg/m 2.8X2 = 5.6m
Galvanised Clamp for DB Box Cross arm
Sub-Station Earthing (set of 3 Earthing Pipe)
3 phase Tri-vector Energy meter comprising of IS 14697-1999 with Kiosk
Danger board & Sign Board( As per drawing of REC)
11 KV lightening arrestor
11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware)
Bolts,Nuts,clamps etc.@5kg/DTR
Sundries, Pole painting etc.
Installation of New Distribution Transformer of 100 KVA (5 Nos)
9.0 m Steel Tubular Pole (410:SP-31) - (embossing as per design drawing of REC)
Galvanised Channel 100X50,@ 7.9 Kg/m 2.8X2 for supporting Transformer
Galvanised Clamp for transformer base channel for M.S. flat [email protected]/m 0.27mX2.
Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for D.P. X-arm
Galvanised Channel 100X50,@7.9 Kg/m 0.46X2 for supporting of item 2
Galvanised Channel 75X40,@5.7Kg/m 2X2.8m for HG fuse unit & A.B. switch
Galvanised Clamp for A.B. switch/HG Fuse/DO Fuse, 50X8mm @ 3.1Kg/m 0.23mX2=0.46m.
Galvanised Channel 75X40,@5.7Kg/m 2X0.5m for supporting H.G. fuse main channel X-arm
Galvanised Angle (50X50X6)mm 2.8X2 @ 4.5 Kg/m transformer belting and Angle (35X35X5),0.46X2 @ 2.6 Kg/m. Transformer belting support.
Galvanised Clamp for transformer belting
Distribution transformer 100 KVA as per IS:1180(2014) level-II
A.B.Switch (set of 3)
Horn gap fuse unit/D.O. fuse, 3 -Ph (set of 3)
DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required.
1.1KV grade, 3½ core 120 Sq.mm PVC insulated aluminium power cable
D.B.box Galvanised cross arm of M.S. Angle 35X35X5mm @ 2.6Kg/m 2.8X2 = 5.6m
Galvanised Clamp for DB Box Cross arm
Sub-Station Earthing (set of 3 Earthing Pipe)
3 phase Tri-vector Energy meter comprising of IS 14697-1999 with Kiosk
Danger board & Sign Board( As per drawing of REC)
11 KV lightening arrestor
11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware)
Bolts,Nuts,clamps etc.@5kg/DTR
Sundries, Pole painting etc.
Arial Bunched Cable
New LT Line Using 3 phase 4 wire with AB Cable (3x50+1x35)Sq.mm (20.0 Km.)
8.0 m S.T.P.(410:SP-14) (embossing as per drawing of REC)
M.S. cross arm (75X40) mm, 500 mm long
Back clamp for cross arm
Dead end fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
Suspension fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
AB Cable (3x50+1x35)Sq.mm with insulated messenger/Neutral
Insulation piercing connector suitable for AB Cable (50/35 Sq.mm. Main & Branch) as per TS & Construction Standard {Main 16-95 Sq. mm Service: 4-35(50) Sq. mm & Neutral 16-95 Sq. mm Service: 2-15 Sg. Mm)}
Earthing set complete with G.I. wire.
G.I. wire. No 10 S.W.G. (90 Kg. per 1.09Km.)
Stay set complete with stay wire and insulator clamp etc.
Bolts & Nuts with [email protected]/km
Sundaries,Pole painting, Danger plate, Number Plate etc.
New LT Line Using 1 phase 2 wire with AB Cable (1X35+1x25)Sq.mm (21.0 Km.)
8.0 m S.T.P.(410:SP-14) (embossing as per drawing of REC)
M.S. cross arm (75X40) mm, 500 mm long
Back clamp for cross arm
Dead end fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
Suspension fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
AB Cable (1x35+1x25)Sq.mm with insulated messenger/Neutral
Insulation piercing connector suitable for AB Cable (50/35 Sq.mm. Main & Branch) as per TS & Construction Standard {Main 16-95 Sq. mm Service: 4-35(50) Sq. mm & Neutral 16-95 Sq. mm Service: 2-15 Sg. Mm)}
Earthing set complete with G.I. wire.
G.I. wire. No 10 S.W.G. (90 Kg. per 1.09Km.)
Stay set complete with stay wire and insulator clamp etc.
Bolts & Nuts with [email protected]/km
Sundaries,Pole painting, Danger plate, Number Plate etc.
Churachandpur District (Supply)
New 11 KV line using ACSR Rabbit (18.0 Km)
9.0 m Steel Tubular Pole (410:SP-31) - (embossing as per design drawing of REC)
Galvanised Pole top bracket
Galvanised Clamp for Pole top Bracket
Galvanised Cross arm(75X40)mm
Galvanised Back clamp for X-arm
Galvanised 2x2.2m D.P. channel X-arm (75X40)mm
11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware)
11 KV Pin Composite/Polymer Insulator (Complete with Pin )
ACSR Conductor (Rabbit)
11 KV AB Switch/G.O. Switch with Galvanised X-arm etc.
Galvanised Bracing for D.P.structure, 50X50X6mm M.S. Angle
Galvanised Clamp for D.P. Bracing
Galvanised Bracing for D.P.structure, 50X50X6mm M.S. Angle
Galvanised Clamp for D.P. Bracing
Galvanised Anti climbing device complete
Earthing set complete with G.I. wire
Guarding at crossing with G.I. wire
Nuts, Bolts, MS flat as support for item No. 3 jointing sleeves etc.@7kg/km
Al. Binding wire, UPG clamps etc. @10 kg/km
Sundries like pole painting Danger plate etc.
Installation of Distribution Transformer
Installation of New Distribution Transformer of 63 KVA (17 Nos.)
9.0 m Steel Tubular Pole (410:SP-31) - (embossing as per design drawing of REC)
Galvanised Channel 100X50,@ 7.9 Kg/m 2.8X2 for supporting Transformer
Galvanised Clamp for transformer base channel for M.S. flat [email protected]/m 0.27mX2.
Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for D.P. X-arm
Galvanised Channel 100X50,@7.9 Kg/m 0.46X2 for supporting of item 2
Galvanised Channel 75X40,@5.7Kg/m 2X2.8m for HG fuse unit & A.B. switch
Galvanised Clamp for A.B. switch/HG Fuse/DO Fuse, 50X8mm @ 3.1Kg/m 0.23mX2=0.46m.
Galvanised Channel 75X40,@5.7Kg/m 2X0.5m for supporting H.G. fuse main channel X-arm
Galvanised Angle (50X50X6)mm 2.8X2 @ 4.5 Kg/m transformer belting and Angle (35X35X5),0.46X2 @ 2.6 Kg/m. Transformer belting support.
Galvanised Clamp for transformer belting
Distribution transformer 63 KVA as per IS:1180(2014) level-II
A.B.Switch (set of 3)
Horn gap fuse unit/D.O. fuse, 3 -Ph (set of 3)
DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required).
1.1KV grade, 3½ core 120 Sq.mm PVC insulated aluminium power cable
D.B.box Galvanised cross arm of M.S. Angle 35X35X5mm @ 2.6Kg/m 2.8X2 = 5.6m
Galvanised Clamp for DB Box Cross arm
Sub-Station Earthing (set of 3 Earthing Pipe)
3 phase Tri-vector Energy meter comprising of IS 14697-1999 with Kiosk
Danger board & Sign Board( As per drawing of REC)
11 KV lightening arrestor
11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware)
Bolts,Nuts,clamps etc.@5kg/DTR
Sundries, Pole painting etc.
Installation of New Distribution Transformer of 100 KVA (4 Nos)
9.0 m Steel Tubular Pole (410:SP-31) - (embossing as per design drawing of REC)
Galvanised Channel 100X50,@ 7.9 Kg/m 2.8X2 for supporting Transformer
Galvanised Clamp for transformer base channel for M.S. flat [email protected]/m 0.27mX2.
Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for D.P. X-arm
Galvanised Channel 100X50,@7.9 Kg/m 0.46X2 for supporting of item 2
Galvanised Channel 75X40,@5.7Kg/m 2X2.8m for HG fuse unit & A.B. switch
Galvanised Clamp for A.B. switch/HG Fuse/DO Fuse, 50X8mm @ 3.1Kg/m 0.23mX2=0.46m.
Galvanised Channel 75X40,@5.7Kg/m 2X0.5m for supporting H.G. fuse main channel X-arm
Galvanised Angle (50X50X6)mm 2.8X2 @ 4.5 Kg/m transformer belting and Angle (35X35X5),0.46X2 @ 2.6 Kg/m. Transformer belting support.
Galvanised Clamp for transformer belting
Distribution transformer 100 KVA as per IS:1180(2014) level-II
A.B.Switch (set of 3)
Horn gap fuse unit/D.O. fuse, 3 -Ph (set of 3)
DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required.
1.1KV grade, 3½ core 120 Sq.mm PVC insulated aluminium power cable
D.B.box Galvanised cross arm of M.S. Angle 35X35X5mm @ 2.6Kg/m 2.8X2 = 5.6m
Galvanised Clamp for DB Box Cross arm
Sub-Station Earthing (set of 3 Earthing Pipe)
3 phase Tri-vector Energy meter comprising of IS 14697-1999 with Kiosk
Danger board & Sign Board( As per drawing of REC)
11 KV lightening arrestor
11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware)
Bolts,Nuts,clamps etc.@5kg/DTR
Sundries, Pole painting etc.
Arial Bunched Cable
New LT Line Using 3 phase 4 wire with AB Cable (3x50+1x35)Sq.mm (18.0 Km.)
8.0 m S.T.P.(410:SP-14) (embossing as per drawing of REC)
M.S. cross arm (75X40) mm, 500 mm long
Back clamp for cross arm
Dead end fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
Suspension fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
AB Cable (3x50+1x35)Sq.mm with insulated messenger/Neutral
Insulation piercing connector suitable for AB Cable (50/35 Sq.mm. Main & Branch) as per TS & Construction Standard {Main 16-95 Sq. mm Service: 4-35(50) Sq. mm & Neutral 16-95 Sq. mm Service: 2-15 Sg. Mm)}
Earthing set complete with G.I. wire.
G.I. wire. No 10 S.W.G. (90 Kg. per 1.09Km.)
Stay set complete with stay wire and insulator clamp etc.
Bolts & Nuts with [email protected]/km
Sundaries,Pole painting, Danger plate, Number Plate etc.
New LT Line Using 1 phase 2 wire with AB Cable (1X35+1x25)Sq.mm (24.0 Km.)
8.0 m S.T.P.(410:SP-14) (embossing as per drawing of REC)
M.S. cross arm (75X40) mm, 500 mm long
Back clamp for cross arm
Dead end fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
Suspension fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
AB Cable (1x35+1x25)Sq.mm with insulated messenger/Neutral
Insulation piercing connector suitable for AB Cable (50/35 Sq.mm. Main & Branch) as per TS & Construction Standard {Main 16-95 Sq. mm Service: 4-35(50) Sq. mm & Neutral 16-95 Sq. mm Service: 2-15 Sg. Mm)}
Earthing set complete with G.I. wire.
G.I. wire. No 10 S.W.G. (90 Kg. per 1.09Km.)
Stay set complete with stay wire and insulator clamp etc.
Bolts & Nuts with [email protected]/km
Sundaries,Pole painting, Danger plate, Number Plate etc.
Chandel District (Supply)
New 11 KV line using ACSR Rabbit (13.0 Km)
9.0 m Steel Tubular Pole (410:SP-31) - (embossing as per design drawing of REC)
Galvanised Pole top bracket
Galvanised Clamp for Pole top Bracket
Galvanised Cross arm(75X40)mm
Galvanised Back clamp for X-arm
Galvanised 2x2.2m D.P. channel X-arm (75X40)mm
11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware)
11 KV Pin Composite/Polymer Insulator (Complete with Pin )
ACSR Conductor (Rabbit)
11 KV AB Switch/G.O. Switch with Galvanised X-arm etc.
Stay Set complete with stay wire, base plate, stay rod etc.
Galvanised Stay Clamp
Galvanised Bracing for D.P.structure, 50X50X6mm M.S. Angle
Galvanised Clamp for D.P. Bracing
Galvanised Anti climbing device complete
Earthing set complete with G.I. wire
Guarding at crossing with G.I. wire
Nuts, Bolts, MS flat as support for item No. 3 jointing sleeves etc.@7kg/km
Al. Binding wire, UPG clamps etc. @10 kg/km
Sundries like pole painting Danger plate etc.
Installation of Distribution Transformer
Installation of New Distribution Transformer of 63 KVA (16 Nos.)
9.0 m Steel Tubular Pole (410:SP-31) - (embossing as per design drawing of REC)
Galvanised Channel 100X50,@ 7.9 Kg/m 2.8X2 for supporting Transformer
Galvanised Clamp for transformer base channel for M.S. flat [email protected]/m 0.27mX2.
Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for D.P. X-arm
Galvanised Channel 100X50,@7.9 Kg/m 0.46X2 for supporting of item 2
Galvanised Channel 75X40,@5.7Kg/m 2X2.8m for HG fuse unit & A.B. switch
Galvanised Clamp for A.B. switch/HG Fuse/DO Fuse, 50X8mm @ 3.1Kg/m 0.23mX2=0.46m.
Galvanised Channel 75X40,@5.7Kg/m 2X0.5m for supporting H.G. fuse main channel X-arm
Galvanised Angle (50X50X6)mm 2.8X2 @ 4.5 Kg/m transformer belting and Angle (35X35X5),0.46X2 @ 2.6 Kg/m. Transformer belting support.
Galvanised Clamp for transformer belting
Distribution transformer 63 KVA as per IS:1180(2014) level-II
A.B.Switch (set of 3)
Horn gap fuse unit/D.O. fuse, 3 -Ph (set of 3)
DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required.
1.1KV grade, 3½ core 120 Sq.mm PVC insulated aluminium power cable
D.B.box Galvanised cross arm of M.S. Angle 35X35X5mm @ 2.6Kg/m 2.8X2 = 5.6m
Galvanised Clamp for DB Box Cross arm
Sub-Station Earthing (set of 3 Earthing Pipe)
3 phase Tri-vector Energy meter comprising of IS 14697-1999 with Kiosk
Danger board & Sign Board( As per drawing of REC)
11 KV lightening arrestor
11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware)
Bolts,Nuts,clamps etc.@5kg/DTR
Sundries, Pole painting etc.
Installation of New Distribution Transformer of 100 KVA (3 Nos)
9.0 m Steel Tubular Pole (410:SP-31) - (embossing as per design drawing of REC)
Galvanised Channel 100X50,@ 7.9 Kg/m 2.8X2 for supporting Transformer
Galvanised Clamp for transformer base channel for M.S. flat [email protected]/m 0.27mX2.
Galvanised Channel 100X50,@7.9 Kg/m 2.8X2 for D.P. X-arm
Galvanised Channel 100X50,@7.9 Kg/m 0.46X2 for supporting of item 2
Galvanised Channel 75X40,@5.7Kg/m 2X2.8m for HG fuse unit & A.B. switch
Galvanised Clamp for A.B. switch/HG Fuse/DO Fuse, 50X8mm @ 3.1Kg/m 0.23mX2=0.46m.
Galvanised Channel 75X40,@5.7Kg/m 2X0.5m for supporting H.G. fuse main channel X-arm
Galvanised Angle (50X50X6)mm 2.8X2 @ 4.5 Kg/m transformer belting and Angle (35X35X5),0.46X2 @ 2.6 Kg/m. Transformer belting support.
Galvanised Clamp for transformer belting
Distribution transformer 100 KVA as per IS:1180(2014) level-II
A.B.Switch (set of 3)
Horn gap fuse unit/D.O. fuse, 3 -Ph (set of 3)
DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required.
1.1KV grade, 3½ core 120 Sq.mm PVC insulated aluminium power cable
D.B.box Galvanised cross arm of M.S. Angle 35X35X5mm @ 2.6Kg/m 2.8X2 = 5.6m
Galvanised Clamp for DB Box Cross arm
Sub-Station Earthing (set of 3 Earthing Pipe)
3 phase Tri-vector Energy meter comprising of IS 14697-1999 with Kiosk
Danger board & Sign Board( As per drawing of REC)
11 KV lightening arrestor
11 KV Disc. Composite/Polymer Insulator (Complete set i/c Tension clamps,Hardware)
Bolts,Nuts,clamps etc.@5kg/DTR
Sundries, Pole painting etc.
Arial Bunched Cable
New LT Line Using 3 phase 4 wire with AB Cable (3x50+1x35)Sq.mm (15.0 Km.)
8.0 m S.T.P.(410:SP-14) (embossing as per drawing of REC)
M.S. cross arm (75X40) mm, 500 mm long
Back clamp for cross arm
Dead end fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
Suspension fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
AB Cable (3x50+1x35)Sq.mm with insulated messenger/Neutral
Insulation piercing connector suitable for AB Cable (50/35 Sq.mm. Main & Branch) as per TS & Construction Standard {Main 16-95 Sq. mm Service: 4-35(50) Sq. mm & Neutral 16-95 Sq. mm Service: 2-15 Sg. Mm)}
Earthing set complete with G.I. wire.
G.I. wire. No 10 S.W.G. (90 Kg. per 1.09Km.)
Stay set complete with stay wire and insulator clamp etc.
Bolts & Nuts with [email protected]/km
Sundaries,Pole painting, Danger plate, Number Plate etc.
New LT Line Using 1 phase 2 wire with AB Cable (1X35+1x25)Sq.mm (20.0 Km.)
8.0 m S.T.P.(410:SP-14) (embossing as per drawing of REC)
M.S. cross arm (75X40) mm, 500 mm long
Back clamp for cross arm
Dead end fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
Suspension fittings for AB Cable with Insulated messenger wire complete with Eye hook as per Construction Standards :
AB Cable (1x35+1x25)Sq.mm with insulated messenger/Neutral
Insulation piercing connector suitable for AB Cable (50/35 Sq.mm. Main & Branch) as per TS & Construction Standard {Main 16-95 Sq. mm Service: 4-35(50) Sq. mm & Neutral 16-95 Sq. mm Service: 2-15 Sg. Mm)}
Earthing set complete with G.I. wire.
G.I. wire. No 10 S.W.G. (90 Kg. per 1.09Km.)
Stay set complete with stay wire and insulator clamp etc.
Bolts & Nuts with [email protected]/km
Sundaries,Pole painting, Danger plate, Number Plate etc.
Description of Work / Item(s)
Ukhrul District (Erection)
New 11 KV line using ACSR Rabbit for New Feeders (13.0 Km)
Detailed Route survey for new lines and submission of route profile/alignment etc. all complete
Jungle clearance including tree cutting along the line including trimming, loaping, branching etc as required to maintain staturory electrical clearance as per the direction of Engineer-in-charge
Erection of Single Pole including excavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials,geo-tagging of assets created, paints,etc) complete as per Technical Specification
Erection of Double Pole including excavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials,geo-tagging of assets created, paints,etc) complete as per Technical Specification
Fitting & fixing of all line accessories like"Y" cross arms, channels, brackets, danger board, anticlimbing device (including supply of nuts&bolts,etc.) complete as per specification for Single Pole.
Fitting & fixing of all line accessories like cross arm, DP channels, DP cross brackets, all types of clamps,danger board, anticlimbing device etc. complete(including supply of nuts&bolts,GI through bolt,etc) as per specification for Double Pole Structure
Pipe Earthing including fixing of 1mtr long GI pipe in all kinds of soils complete as per approved drawing and Technical Specification 1set/location
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of line (3 wires) including paying out and sagging of conductor, and mid point jointing of ACSR Weasel conductor, installation of disc/ pin insulator alongwith all necessary hardwares and accessories as per Technical Specification.
Providing of 11 KV AB Switch/G.O. Switch with Galvanised X-arm etc.
Installation of Distribution Transformer
Installation of New Distribution Transformer of 63 KVA (15 Nos )
Erection, testing & commissioning of 3-ph, 50Hz., 11/0.415kV, 63 KVA, Distribution Transformers including erection of DP Structure,DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required) including loading, unloading etc. AND also providing of all civil works viz., Foundation (including the cost of cement, steel etc. may be required for foundation materials) as per TS and approved drawings.
Providing of Sub-Station Earthing (Set of 3 Earthing Pit) with all accessories complete.
Laying, dressing, testing and commissioning of 1.1kV, 3.5 core PVC insulated steel armoured single aluminium power cable with proper cramping, terminations etc. including supply of lugs, ferrules & termination sockets etc. including installation of Distribution Box as per approved drawing and TS
Fixing of Danger Board and Sign Board
Erection, testing and commissioning of 9 kV, 1-ph, Gapless Lightning / surge arrestor complete with insulating base, terminal connectors etc. and all fittings & accessories, including erection of associated structures, complete as per TS
Erection, testing and commissioning of 11 kV, 200A, 3-ph, Gang operated AB switch along with support insulators operating mechanism, Base Channel down Pipe, terminal connectors and all fittings & accessories including erection of associated structures, complete as per TS
Fixing of 11kV, 3-ph, DO switch along with support insulators operating mechanism, terminal connectors along with all other accessories complete as per TS for erection, testing and commissioning
Erection, testing and commissioning of 3 phase Tri-vector Energy meter with Kiosk
Installation of New Distribution Transformer of 100 KVA (3 Nos )
Erection, testing & commissioning of 3-ph, 50Hz., 11/0.415kV, 100 KVA, Distribution Transformers including erection of DP Structure, DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required) including loading, unloading etc. AND also providing of all civil works viz., Foundation (including the cost of cement, steel etc. may be required for foundation materials) as per TS and approved drawings.
Providing of Sub-Station Earthing (Set of 3 Earthing Pit) with all accessories complete.
Laying, dressing, testing and commissioning of 1.1kV, 3.5 core PVC insulated steel armoured single aluminium power cable with proper cramping, terminations etc. including supply of lugs, ferrules & termination sockets etc. including installation of MCCB as per approved drawing and TS
Fixing of Danger Board and Sign Board
Erection, testing and commissioning of 9 kV, 1-ph, Gapless Lightning / surge arrestor complete with insulating base, terminal connectors etc. and all fittings & accessories, including erection of associated structures, complete as per TS
Erection, testing and commissioning of 11 kV, 200A, 3-ph, Gang operated AB switch along with support insulators operating mechanism, Base Channel down Pipe, terminal connectors and all fittings & accessories including erection of associated structures, complete as per TS
Fixing of 11kV, 3-ph, DO switch along with support insulators operating mechanism, terminal connectors along with all other accessories complete as per TS for erection, testing and commissioning
Erection, testing and commissioning of 3 phase Tri-vector Energy meter with Kiosk
Aerial Bunched Cables
New LT Line Using 3 phase 4 wire with AB Cable (3x50+1x35)Sq.mm (13.0 Km)
Detailed Route Survey, investigation including peg marking, profiling / alignment of route etc. complete as per Technical Specification
Erection of Single Pole including exacavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials and paints,etc) complete as per Technical Specification
Fixing of all line accessories like cross arm, channels, brackets, danger board, anticlimbing device etc. complete as per specification for Single pole.
Fixing of G.I. Earth Spike (1800 x 20 mm) with 6 SWG/8 SWG GI wire, all accessories for earthing complete.
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of LT AB Cable (3x50+1x35 sq.mm.) including installation of clamps for attachment of ABC to pole and all accessories including Distribution Box, jointing and termination, danger plate, etc. complete in all respect as required as per Construction Standard
Tree cutting along the line including trimming, looping, branching etc. as required to maintain statutory electrical clearance as per the direction of Engineer-in-charge
New LT Line Using 1 phase 2 wire with AB Cable (1x35+1x25)Sq.mm (23.0 Kms)
Detailed Route Survey, investigation including peg marking, profiling / alignment of route etc. complete as per Technical Specification
Erection of Single Pole including exacavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials and paints,etc) complete as per Technical Specification
Fixing of all line accessories like cross arm, channels, brackets, danger board, anticlimbing device etc. complete as per specification for Single pole.
Fixing of G.I. Earth Spike (1800 x 20 mm) with 6 SWG/8 SWG GI wire, all accessories for earthing complete.
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of LT AB Cable (1x16+1x25 sq.mm.) including installation of clamps for attachment of ABC to pole and all accessories including Distribution Box, jointing and termination, danger plate, etc. complete in all respect as required as per Construction Standard
Tree cutting along the line including trimming, looping, branching etc. as required to maintain statutory electrical clearance as per the direction of Engineer-in-charge
Tamenglong District (Erection)
New 11 KV line using ACSR Rabbit for New Feeders (13.0 Km)
Detailed Route survey for new lines and submission of route profile/alignment etc. all complete
Jungle clearance including tree cutting along the line including trimming, loaping, branching etc as required to maintain staturory electrical clearance as per the direction of Engineer-in-charge
Erection of Single Pole including excavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials,geo-tagging of assets created, paints,etc) complete as per Technical Specification
Erection of Double Pole including excavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials,geo-tagging of assets created, paints,etc) complete as per Technical Specification
Fitting & fixing of all line accessories like"Y" cross arms, channels, brackets, danger board, anticlimbing device (including supply of nuts&bolts,etc.) complete as per specification for Single Pole.
Fitting & fixing of all line accessories like cross arm, DP channels, DP cross brackets, all types of clamps,danger board, anticlimbing device etc. complete(including supply of nuts&bolts,GI through bolt,etc) as per specification for Double Pole Structure
Pipe Earthing including fixing of 1mtr long GI pipe in all kinds of soils complete as per approved drawing and Technical Specification 1set/location
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of line (3 wires) including paying out and sagging of conductor, and mid point jointing of ACSR Weasel conductor, installation of disc/ pin insulator alongwith all necessary hardwares and accessories as per Technical Specification.
Providing of 11 KV AB Switch/G.O. Switch with Galvanised X-arm etc.
Installation of Distribution Transformer
Installation of New Distribution Transformer of 63 KVA (15 Nos )
Erection, testing & commissioning of 3-ph, 50Hz., 11/0.415kV, 63 KVA, Distribution Transformers including erection of DP Structure,DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required) including loading, unloading etc. AND also providing of all civil works viz., Foundation (including the cost of cement, steel etc. may be required for foundation materials) as per TS and approved drawings.
Providing of Sub-Station Earthing (Set of 3 Earthing Pit) with all accessories complete.
Laying, dressing, testing and commissioning of 1.1kV, 3.5 core PVC insulated steel armoured single aluminium power cable with proper cramping, terminations etc. including supply of lugs, ferrules & termination sockets etc. including installation of Distribution Box as per approved drawing and TS
Fixing of Danger Board and Sign Board
Erection, testing and commissioning of 9 kV, 1-ph, Gapless Lightning / surge arrestor complete with insulating base, terminal connectors etc. and all fittings & accessories, including erection of associated structures, complete as per TS
Erection, testing and commissioning of 11 kV, 200A, 3-ph, Gang operated AB switch along with support insulators operating mechanism, Base Channel down Pipe, terminal connectors and all fittings & accessories including erection of associated structures, complete as per TS
Fixing of 11kV, 3-ph, DO switch along with support insulators operating mechanism, terminal connectors along with all other accessories complete as per TS for erection, testing and commissioning
Erection, testing and commissioning of 3 phase Tri-vector Energy meter with Kiosk
Installation of New Distribution Transformer of 100 KVA (3 Nos )
Erection, testing & commissioning of 3-ph, 50Hz., 11/0.415kV, 100 KVA, Distribution Transformers including erection of DP Structure, DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required) including loading, unloading etc. AND also providing of all civil works viz., Foundation (including the cost of cement, steel etc. may be required for foundation materials) as per TS and approved drawings.
Providing of Sub-Station Earthing (Set of 3 Earthing Pit) with all accessories complete.
Laying, dressing, testing and commissioning of 1.1kV, 3.5 core PVC insulated steel armoured single aluminium power cable with proper cramping, terminations etc. including supply of lugs, ferrules & termination sockets etc. including installation of MCCB as per approved drawing and TS
Fixing of Danger Board and Sign Board
Erection, testing and commissioning of 9 kV, 1-ph, Gapless Lightning / surge arrestor complete with insulating base, terminal connectors etc. and all fittings & accessories, including erection of associated structures, complete as per TS
Erection, testing and commissioning of 11 kV, 200A, 3-ph, Gang operated AB switch along with support insulators operating mechanism, Base Channel down Pipe, terminal connectors and all fittings & accessories including erection of associated structures, complete as per TS
Fixing of 11kV, 3-ph, DO switch along with support insulators operating mechanism, terminal connectors along with all other accessories complete as per TS for erection, testing and commissioning
Erection, testing and commissioning of 3 phase Tri-vector Energy meter with Kiosk
Aerial Bunched Cables
New LT Line Using 3 phase 4 wire with AB Cable (3x50+1x35)Sq.mm (12.0 Km)
Detailed Route Survey, investigation including peg marking, profiling / alignment of route etc. complete as per Technical Specification
Erection of Single Pole including exacavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials and paints,etc) complete as per Technical Specification
Fixing of all line accessories like cross arm, channels, brackets, danger board, anticlimbing device etc. complete as per specification for Single pole.
Fixing of G.I. Earth Spike (1800 x 20 mm) with 6 SWG/8 SWG GI wire, all accessories for earthing complete.
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of LT AB Cable (3x50+1x35 sq.mm.) including installation of clamps for attachment of ABC to pole and all accessories including Distribution Box, jointing and termination, danger plate, etc. complete in all respect as required as per Construction Standard
Tree cutting along the line including trimming, looping, branching etc. as required to maintain statutory electrical clearance as per the direction of Engineer-in-charge
New LT Line Using 1 phase 2 wire with AB Cable (1x35+1x25)Sq.mm (22.0 Kms)
Detailed Route Survey, investigation including peg marking, profiling / alignment of route etc. complete as per Technical Specification
Erection of Single Pole including exacavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials and paints,etc) complete as per Technical Specification
Fixing of all line accessories like cross arm, channels, brackets, danger board, anticlimbing device etc. complete as per specification for Single pole.
Fixing of G.I. Earth Spike (1800 x 20 mm) with 6 SWG/8 SWG GI wire, all accessories for earthing complete.
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of LT AB Cable (1x16+1x25 sq.mm.) including installation of clamps for attachment of ABC to pole and all accessories including Distribution Box, jointing and termination, danger plate, etc. complete in all respect as required as per Construction Standard
Tree cutting along the line including trimming, looping, branching etc. as required to maintain statutory electrical clearance as per the direction of Engineer-in-charge
Senapati District (Erection)
New 11 KV line using ACSR Rabbit for New Feeders (13.0 Km)
Detailed Route survey for new lines and submission of route profile/alignment etc. all complete
Jungle clearance including tree cutting along the line including trimming, loaping, branching etc as required to maintain staturory electrical clearance as per the direction of Engineer-in-charge
Erection of Single Pole including excavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials,geo-tagging of assets created, paints,etc) complete as per Technical Specification
Erection of Double Pole including excavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials,geo-tagging of assets created, paints,etc) complete as per Technical Specification
Fitting & fixing of all line accessories like"Y" cross arms, channels, brackets, danger board, anticlimbing device (including supply of nuts&bolts,etc.) complete as per specification for Single Pole.
Fitting & fixing of all line accessories like cross arm, DP channels, DP cross brackets, all types of clamps,danger board, anticlimbing device etc. complete(including supply of nuts&bolts,GI through bolt,etc) as per specification for Double Pole Structure
Pipe Earthing including fixing of 1mtr long GI pipe in all kinds of soils complete as per approved drawing and Technical Specification 1set/location
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of line (3 wires) including paying out and sagging of conductor, and mid point jointing of ACSR Weasel conductor, installation of disc/ pin insulator alongwith all necessary hardwares and accessories as per Technical Specification.
Providing of 11 KV AB Switch/G.O. Switch with Galvanised X-arm etc.
Installation of Distribution Transformer
Installation of New Distribution Transformer of 63 KVA (13 Nos )
Erection, testing & commissioning of 3-ph, 50Hz., 11/0.415kV, 63 KVA, Distribution Transformers including erection of DP Structure,DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required) including loading, unloading etc. AND also providing of all civil works viz., Foundation (including the cost of cement, steel etc. may be required for foundation materials) as per TS and approved drawings.
Providing of Sub-Station Earthing (Set of 3 Earthing Pit) with all accessories complete.
Laying, dressing, testing and commissioning of 1.1kV, 3.5 core PVC insulated steel armoured single aluminium power cable with proper cramping, terminations etc. including supply of lugs, ferrules & termination sockets etc. including installation of Distribution Box as per approved drawing and TS
Fixing of Danger Board and Sign Board
Erection, testing and commissioning of 9 kV, 1-ph, Gapless Lightning / surge arrestor complete with insulating base, terminal connectors etc. and all fittings & accessories, including erection of associated structures, complete as per TS
Erection, testing and commissioning of 11 kV, 200A, 3-ph, Gang operated AB switch along with support insulators operating mechanism, Base Channel down Pipe, terminal connectors and all fittings & accessories including erection of associated structures, complete as per TS
Fixing of 11kV, 3-ph, DO switch along with support insulators operating mechanism, terminal connectors along with all other accessories complete as per TS for erection, testing and commissioning
Erection, testing and commissioning of 3 phase Tri-vector Energy meter with Kiosk
Installation of New Distribution Transformer of 100 KVA (5 Nos )
Erection, testing & commissioning of 3-ph, 50Hz., 11/0.415kV, 100 KVA, Distribution Transformers including erection of DP Structure, DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required) including loading, unloading etc. AND also providing of all civil works viz., Foundation (including the cost of cement, steel etc. may be required for foundation materials) as per TS and approved drawings.
Providing of Sub-Station Earthing (Set of 3 Earthing Pit) with all accessories complete.
Laying, dressing, testing and commissioning of 1.1kV, 3.5 core PVC insulated steel armoured single aluminium power cable with proper cramping, terminations etc. including supply of lugs, ferrules & termination sockets etc. including installation of MCCB as per approved drawing and TS
Fixing of Danger Board and Sign Board
Erection, testing and commissioning of 9 kV, 1-ph, Gapless Lightning / surge arrestor complete with insulating base, terminal connectors etc. and all fittings & accessories, including erection of associated structures, complete as per TS
Erection, testing and commissioning of 11 kV, 200A, 3-ph, Gang operated AB switch along with support insulators operating mechanism, Base Channel down Pipe, terminal connectors and all fittings & accessories including erection of associated structures, complete as per TS
Fixing of 11kV, 3-ph, DO switch along with support insulators operating mechanism, terminal connectors along with all other accessories complete as per TS for erection, testing and commissioning
Erection, testing and commissioning of 3 phase Tri-vector Energy meter with Kiosk
Aerial Bunched Cables
New LT Line Using 3 phase 4 wire with AB Cable (3x50+1x35)Sq.mm (20.0 Km)
Detailed Route Survey, investigation including peg marking, profiling / alignment of route etc. complete as per Technical Specification
Erection of Single Pole including exacavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials and paints,etc) complete as per Technical Specification
Fixing of all line accessories like cross arm, channels, brackets, danger board, anticlimbing device etc. complete as per specification for Single pole.
Fixing of G.I. Earth Spike (1800 x 20 mm) with 6 SWG/8 SWG GI wire, all accessories for earthing complete.
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of LT AB Cable (3x50+1x35 sq.mm.) including installation of clamps for attachment of ABC to pole and all accessories including Distribution Box, jointing and termination, danger plate, etc. complete in all respect as required as per Construction Standard
Tree cutting along the line including trimming, looping, branching etc. as required to maintain statutory electrical clearance as per the direction of Engineer-in-charge
New LT Line Using 1 phase 2 wire with AB Cable (1x35+1x25)Sq.mm (21.0 Kms)
Detailed Route Survey, investigation including peg marking, profiling / alignment of route etc. complete as per Technical Specification
Erection of Single Pole including exacavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials and paints,etc) complete as per Technical Specification
Fixing of all line accessories like cross arm, channels, brackets, danger board, anticlimbing device etc. complete as per specification for Single pole.
Fixing of G.I. Earth Spike (1800 x 20 mm) with 6 SWG/8 SWG GI wire, all accessories for earthing complete.
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of LT AB Cable (1x16+1x25 sq.mm.) including installation of clamps for attachment of ABC to pole and all accessories including Distribution Box, jointing and termination, danger plate, etc. complete in all respect as required as per Construction Standard
Tree cutting along the line including trimming, looping, branching etc. as required to maintain statutory electrical clearance as per the direction of Engineer-in-charge
Churachandpur District (Erection)
New 11 KV line using ACSR Rabbit for New Feeders (18.0 Km)
Detailed Route survey for new lines and submission of route profile/alignment etc. all complete
Jungle clearance including tree cutting along the line including trimming, loaping, branching etc as required to maintain staturory electrical clearance as per the direction of Engineer-in-charge
Erection of Single Pole including excavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials,geo-tagging of assets created, paints,etc) complete as per Technical Specification
Erection of Double Pole including excavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials,geo-tagging of assets created, paints,etc) complete as per Technical Specification
Fitting & fixing of all line accessories like"Y" cross arms, channels, brackets, danger board, anticlimbing device (including supply of nuts&bolts,etc.) complete as per specification for Single Pole.
Fitting & fixing of all line accessories like cross arm, DP channels, DP cross brackets, all types of clamps,danger board, anticlimbing device etc. complete(including supply of nuts&bolts,GI through bolt,etc) as per specification for Double Pole Structure
Pipe Earthing including fixing of 1mtr long GI pipe in all kinds of soils complete as per approved drawing and Technical Specification 1set/location
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of line (3 wires) including paying out and sagging of conductor, and mid point jointing of ACSR Weasel conductor, installation of disc/ pin insulator alongwith all necessary hardwares and accessories as per Technical Specification.
Providing of 11 KV AB Switch/G.O. Switch with Galvanised X-arm etc.
Installation of Distribution Transformer
Installation of New Distribution Transformer of 63 KVA (17 Nos )
Erection, testing & commissioning of 3-ph, 50Hz., 11/0.415kV, 63 KVA, Distribution Transformers including erection of DP Structure,DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required) including loading, unloading etc. AND also providing of all civil works viz., Foundation (including the cost of cement, steel etc. may be required for foundation materials) as per TS and approved drawings.
Providing of Sub-Station Earthing (Set of 3 Earthing Pit) with all accessories complete.
Laying, dressing, testing and commissioning of 1.1kV, 3.5 core PVC insulated steel armoured single aluminium power cable with proper cramping, terminations etc. including supply of lugs, ferrules & termination sockets etc. including installation of Distribution Box as per approved drawing and TS
Fixing of Danger Board and Sign Board
Erection, testing and commissioning of 9 kV, 1-ph, Gapless Lightning / surge arrestor complete with insulating base, terminal connectors etc. and all fittings & accessories, including erection of associated structures, complete as per TS
Erection, testing and commissioning of 11 kV, 200A, 3-ph, Gang operated AB switch along with support insulators operating mechanism, Base Channel down Pipe, terminal connectors and all fittings & accessories including erection of associated structures, complete as per TS
Fixing of 11kV, 3-ph, DO switch along with support insulators operating mechanism, terminal connectors along with all other accessories complete as per TS for erection, testing and commissioning
Erection, testing and commissioning of 3 phase Tri-vector Energy meter with Kiosk
Installation of New Distribution Transformer of 100 KVA (4 Nos )
Erection, testing & commissioning of 3-ph, 50Hz., 11/0.415kV, 100 KVA, Distribution Transformers including erection of DP Structure, DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required) including loading, unloading etc. AND also providing of all civil works viz., Foundation (including the cost of cement, steel etc. may be required for foundation materials) as per TS and approved drawings.
Providing of Sub-Station Earthing (Set of 3 Earthing Pit) with all accessories complete.
Laying, dressing, testing and commissioning of 1.1kV, 3.5 core PVC insulated steel armoured single aluminium power cable with proper cramping, terminations etc. including supply of lugs, ferrules & termination sockets etc. including installation of MCCB as per approved drawing and TS
Fixing of Danger Board and Sign Board
Erection, testing and commissioning of 9 kV, 1-ph, Gapless Lightning / surge arrestor complete with insulating base, terminal connectors etc. and all fittings & accessories, including erection of associated structures, complete as per TS
Erection, testing and commissioning of 11 kV, 200A, 3-ph, Gang operated AB switch along with support insulators operating mechanism, Base Channel down Pipe, terminal connectors and all fittings & accessories including erection of associated structures, complete as per TS
Fixing of 11kV, 3-ph, DO switch along with support insulators operating mechanism, terminal connectors along with all other accessories complete as per TS for erection, testing and commissioning
Erection, testing and commissioning of 3 phase Tri-vector Energy meter with Kiosk
Aerial Bunched Cables
New LT Line Using 3 phase 4 wire with AB Cable (3x50+1x35)Sq.mm (18.0 Km)
Detailed Route Survey, investigation including peg marking, profiling / alignment of route etc. complete as per Technical Specification
Erection of Single Pole including exacavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials and paints,etc) complete as per Technical Specification
Fixing of all line accessories like cross arm, channels, brackets, danger board, anticlimbing device etc. complete as per specification for Single pole.
Fixing of G.I. Earth Spike (1800 x 20 mm) with 6 SWG/8 SWG GI wire, all accessories for earthing complete.
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of LT AB Cable (3x50+1x35 sq.mm.) including installation of clamps for attachment of ABC to pole and all accessories including Distribution Box, jointing and termination, danger plate, etc. complete in all respect as required as per Construction Standard
Tree cutting along the line including trimming, looping, branching etc. as required to maintain statutory electrical clearance as per the direction of Engineer-in-charge
New LT Line Using 1 phase 2 wire with AB Cable (1x35+1x25)Sq.mm (24.0 Kms)
Detailed Route Survey, investigation including peg marking, profiling / alignment of route etc. complete as per Technical Specification
Erection of Single Pole including exacavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials and paints,etc) complete as per Technical Specification
Fixing of all line accessories like cross arm, channels, brackets, danger board, anticlimbing device etc. complete as per specification for Single pole.
Fixing of G.I. Earth Spike (1800 x 20 mm) with 6 SWG/8 SWG GI wire, all accessories for earthing complete.
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of LT AB Cable (1x16+1x25 sq.mm.) including installation of clamps for attachment of ABC to pole and all accessories including Distribution Box, jointing and termination, danger plate, etc. complete in all respect as required as per Construction Standard
Tree cutting along the line including trimming, looping, branching etc. as required to maintain statutory electrical clearance as per the direction of Engineer-in-charge
Chandel District (Erection)
New 11 KV line using ACSR Rabbit for New Feeders (13.0 Km)
Detailed Route survey for new lines and submission of route profile/alignment etc. all complete
Jungle clearance including tree cutting along the line including trimming, loaping, branching etc as required to maintain staturory electrical clearance as per the direction of Engineer-in-charge
Erection of Single Pole including excavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials,geo-tagging of assets created, paints,etc) complete as per Technical Specification
Erection of Double Pole including excavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials,geo-tagging of assets created, paints,etc) complete as per Technical Specification
Fitting & fixing of all line accessories like"Y" cross arms, channels, brackets, danger board, anticlimbing device (including supply of nuts&bolts,etc.) complete as per specification for Single Pole.
Fitting & fixing of all line accessories like cross arm, DP channels, DP cross brackets, all types of clamps,danger board, anticlimbing device etc. complete(including supply of nuts&bolts,GI through bolt,etc) as per specification for Double Pole Structure
Pipe Earthing including fixing of 1mtr long GI pipe in all kinds of soils complete as per approved drawing and Technical Specification 1set/location
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of line (3 wires) including paying out and sagging of conductor, and mid point jointing of ACSR Weasel conductor, installation of disc/ pin insulator alongwith all necessary hardwares and accessories as per Technical Specification.
Providing of 11 KV AB Switch/G.O. Switch with Galvanised X-arm etc.
Installation of Distribution Transformer
Installation of New Distribution Transformer of 63 KVA (16 Nos )
Erection, testing & commissioning of 3-ph, 50Hz., 11/0.415kV, 63 KVA, Distribution Transformers including erection of DP Structure,DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required) including loading, unloading etc. AND also providing of all civil works viz., Foundation (including the cost of cement, steel etc. may be required for foundation materials) as per TS and approved drawings.
Providing of Sub-Station Earthing (Set of 3 Earthing Pit) with all accessories complete.
Laying, dressing, testing and commissioning of 1.1kV, 3.5 core PVC insulated steel armoured single aluminium power cable with proper cramping, terminations etc. including supply of lugs, ferrules & termination sockets etc. including installation of Distribution Box as per approved drawing and TS
Fixing of Danger Board and Sign Board
Erection, testing and commissioning of 9 kV, 1-ph, Gapless Lightning / surge arrestor complete with insulating base, terminal connectors etc. and all fittings & accessories, including erection of associated structures, complete as per TS
Erection, testing and commissioning of 11 kV, 200A, 3-ph, Gang operated AB switch along with support insulators operating mechanism, Base Channel down Pipe, terminal connectors and all fittings & accessories including erection of associated structures, complete as per TS
Fixing of 11kV, 3-ph, DO switch along with support insulators operating mechanism, terminal connectors along with all other accessories complete as per TS for erection, testing and commissioning
Erection, testing and commissioning of 3 phase Tri-vector Energy meter with Kiosk
Installation of New Distribution Transformer of 100 KVA (3 Nos )
Erection, testing & commissioning of 3-ph, 50Hz., 11/0.415kV, 100 KVA, Distribution Transformers including erection of DP Structure, DTR Cubicle for DTRs (Comprising of requisite and adequate ratings of MCCBs/MCBs for LT protection in incomer and outgoing along with accessories required) including loading, unloading etc. AND also providing of all civil works viz., Foundation (including the cost of cement, steel etc. may be required for foundation materials) as per TS and approved drawings.
Providing of Sub-Station Earthing (Set of 3 Earthing Pit) with all accessories complete.
Laying, dressing, testing and commissioning of 1.1kV, 3.5 core PVC insulated steel armoured single aluminium power cable with proper cramping, terminations etc. including supply of lugs, ferrules & termination sockets etc. including installation of MCCB as per approved drawing and TS
Fixing of Danger Board and Sign Board
Erection, testing and commissioning of 9 kV, 1-ph, Gapless Lightning / surge arrestor complete with insulating base, terminal connectors etc. and all fittings & accessories, including erection of associated structures, complete as per TS
Erection, testing and commissioning of 11 kV, 200A, 3-ph, Gang operated AB switch along with support insulators operating mechanism, Base Channel down Pipe, terminal connectors and all fittings & accessories including erection of associated structures, complete as per TS
Fixing of 11kV, 3-ph, DO switch along with support insulators operating mechanism, terminal connectors along with all other accessories complete as per TS for erection, testing and commissioning
Erection, testing and commissioning of 3 phase Tri-vector Energy meter with Kiosk
Aerial Bunched Cables
New LT Line Using 3 phase 4 wire with AB Cable (3x50+1x35)Sq.mm (15.0 Km)
Detailed Route Survey, investigation including peg marking, profiling / alignment of route etc. complete as per Technical Specification
Erection of Single Pole including exacavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials and paints,etc) complete as per Technical Specification
Fixing of all line accessories like cross arm, channels, brackets, danger board, anticlimbing device etc. complete as per specification for Single pole.
Fixing of G.I. Earth Spike (1800 x 20 mm) with 6 SWG/8 SWG GI wire, all accessories for earthing complete.
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of LT AB Cable (3x50+1x35 sq.mm.) including installation of clamps for attachment of ABC to pole and all accessories including Distribution Box, jointing and termination, danger plate, etc. complete in all respect as required as per Construction Standard
Tree cutting along the line including trimming, looping, branching etc. as required to maintain statutory electrical clearance as per the direction of Engineer-in-charge
New LT Line Using 1 phase 2 wire with AB Cable (1x35+1x25)Sq.mm (20.0 Kms)
Detailed Route Survey, investigation including peg marking, profiling / alignment of route etc. complete as per Technical Specification
Erection of Single Pole including exacavation in all kinds of soils, muffing of Poles as per approved drawing, painting of poles (including supply of concreting materials and paints,etc) complete as per Technical Specification
Fixing of all line accessories like cross arm, channels, brackets, danger board, anticlimbing device etc. complete as per specification for Single pole.
Fixing of G.I. Earth Spike (1800 x 20 mm) with 6 SWG/8 SWG GI wire, all accessories for earthing complete.
Erection of stay set including stay pit excavation, concreting, stone/ earth filling, ramming, fixing of stay wire, insulator complete as per specification
Stringing of LT AB Cable (1x16+1x25 sq.mm.) including installation of clamps for attachment of ABC to pole and all accessories including Distribution Box, jointing and termination, danger plate, etc. complete in all respect as required as per Construction Standard
Tree cutting along the line including trimming, looping, branching etc. as required to maintain statutory electrical clearance as per the direction of Engineer-in-charge
T and T Projects Ltd
Shyama Power India Limited
TECHNO POWER ENTERPRISES PVT LTD
T and T Projects Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid