Loading…
Loading…
Tender Value
₹64.4 L
EMD Value
₹1.5 L
Closing Date
31 Aug 2026, 5:00 pm
GM Civil
Main Administrative Building Sector-6 Noida
Emergency Work (Fencing with RCC post vacant noida land for safety of land of different village and Sector of work Circle-9) Noida
2026_NOIDA_1177634_1
66/GM(C)/SM-WC-09/ET/2026-27
Open Tender
Civil Works
Fixed-rate
730 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,832
NOIDA
₹1.5 L
20 Aug 2026
20 Aug 2026
1 Sept 2026
20 Aug 2026
31 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating holes more than 0.10cum & up to 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil; as directed within a lead of 50 m and lift up to 1.5 m. All kinds of soil | 3,800 | each | 36.24 | ₹1,37,712 |
| 2 | Supplying at site:R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately). | 103 | cum | 20,727.84 | ₹21,34,967.52 |
| 3 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall b sttutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire 9.38 kg per 100 metres (minimum) between the two posts fitted and fixed with G.l. staples on wooden plugs or G.l. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used.With G.l. barbed wire | 93,836 | metre | 8.79 | ₹8,24,818.44 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 95 | cum | 5,746.88 | ₹5,45,953.6 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 cement : 2 coarse sand (Zone-III) drived from natural sources : 4 graded stone aggregate 20 mm nominal size drived from natural sources) | 380 | cum | 6,753.45 | ₹25,66,311 |
| 6 | Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @3.84 kg/10 sqm). | 3,420 | sqm | 67.37 | ₹2,30,405.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
BOQ_2212893.xls
BOQ • 0.34 MB
Capability.xls
Additional Documents • 0.05 MB
TD.pdf
Additional Documents • 4.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].