Loading…
Loading…
Tender Value
₹9.8 L
EMD Value
₹97,579
Closing Date
10 Jun 2026, 3:00 pm2d left
ce knn
ce knn moti jheel
Imp of road and from Hotel MG Grand to Arvind Panday house in Naramau in ward 17 under Zone-6.
2026_NNKAN_1157821_1
107/AA-6/2026-27
Open Tender
Civil Works
45 days
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹97,579
6 Jun 2026
6 Jun 2026
10 Jun 2026
6 Jun 2026
10 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismentaling cement concrete or brick work or granolithic floor including stacking of dismantaled material as directed by Engineer-in- Charge within s distance of 60 meter. | 32.5 | cum | 67 | ₹2,177.5 | BI01010001010000000000000515BI0100001171 |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5 m , as per directed by engineer-in-charge:2.1.1 all kind soil | 94.5 | cum | 170 | ₹16,065 | BI01010001010000000000000515BI0100001172 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:6:12 (1 Cement: 6 Coarse sand (zone-III): 12 graded Brick aggregate 40 mm nominal size). | 3.6 | cum | 4,380 | ₹15,768 | BI01010001010000000000000515BI0100001173 |
| 4 | class 150 brick work in 1:4 cement mortar in foundation & plingth including supply of all materials labour etc all complete.... | 8.28 | cum | 6,600 | ₹54,648 | BI01010001010000000000000515BI0100001174 |
| 5 | 12 mm cement plaster of mix 1:4 etc all complete... | 45 | sqm | 182 | ₹8,190 | BI01010001010000000000000515BI0100001175 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 landings, balconles, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finihing and reinforcement: 1:1.5:3 (1 Cement: 1.5 Coarse sand (zone-III): 3 graded stone aggregate 20 mm (nominal size). | 0.32 | cum | 8,720 | ₹2,790.4 | BI01010001010000000000000515BI0100001176 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth kg level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 25.12 | kg | 72 | ₹1,808.64 | BI01010001010000000000000515BI0100001177 |
| 8 | Construction of granular sub base (GSB) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavaton at OMC and compacting with vibratory roller to achieve the desired density, Complete as per MORT & H clause 402 | 46.8 | cum | 3,671 | ₹1,71,802.8 | BI01010001010000000000000515BI0100001178 |
| 9 | Providing & Laying of Rubber moulded interlocking Concrete Block with 80mm thick ICBP(75% Gray & 25% Red/Yellow coloured) having strength not less than 30KN/m2 complete as per Technical Specification Clause 1500. | 585 | sqm | 925 | ₹5,41,125 | BI01010001010000000000000515BI0100001179 |
| 10 | raiseing of manhole chember including material etc all. Comlete | 10 | nos | 704 | ₹7,040 | BI01010001010000000000000515BI0100001180 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.03 MB
BOQ_2169800.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid