| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.9 LAccepted-AOC | L1 | Accepted-AOC L1 quoted | |
| 2 | L2₹23.6 L+₹1.7 L (7.79%)Rejected-Finance | L2 | Rejected-Finance L2 quoted | |
| 3 | L3₹27.5 L+₹5.6 L (25.5%)Rejected-Finance 00 BANJARIYA PURVI KHALILABAD SANT KABIR NAGAR SANT KABIR NAGAR UTTAR PRADESH 272175 UDYAM UP 67 0001594 | SANT KABEER NAGAR | UTTAR PRADESH | 272175 | L3 | Rejected-Finance L3 quoted | |
| 4 | L4₹36.2 L+₹14.2 L (64.8%)Rejected-Finance | L4 | Rejected-Finance L4 quoted | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹26.8 L
EMD Value
₹57,000
Closing Date
8 Jul 2021, 5:00 pmClosed
EE ECD(D) ,BHIKHARIPUR MANUADIH VARANASI
EE ECD(D) ,BHIKHARIPUR MANUADIH VARANASI
CONSTRUCTION OF 01 NOS. 180/200M DEEP TUBEWELL WITH 300mmx 150mm DIA SIZE TUBEWELL ASSEMBLY, CONSTRUCTION OF PUMP HOUSE AND GANTRY STRUCTURE AT VIDYUT NAGAR, HYDEL COLONY, BHIKHARIPUR VARANASI
2021_PVVNV_598881_1
16/ECD(D)/VNS/2021-22
Open Tender
Civil Works
Item Rate
75 days
VIDYUT NAGAR, HYDEL COLONY, BHIKHARIPUR VARANASI
Scan Copy of Prequalification Condition is enclosed in Tender Specification
2 documents required · 2 mandatory
₹3,540
EXECUTIVE ENGINEER ECD(D) VARANASI
₹57,000
EE ECD(D) ,BHIKHARIPUR MANUADIH VARANASI
7 Aug 2021
25 Jun 2021
9 Jul 2021
25 Jun 2021
8 Jul 2021
25 Jun 2021
1 Jul 2021
Amount
Construction of Deep Tubewell : To and fro Transportation of Tubewell drilling, erection and development machine and other equipment at site of work and its dismantling and removal from site of work.
Drilling of 625mm Dia bore from GL. to 65M BGL as required for proper completion of work as directed by E/I.
Drilling of 450mm Dia bore from GL. to 65M BGL as required for proper completion of work as directed by E/I.
Drilling of 450mm Dia bore from 65M BGL to 80M BGL as required for proper completion of work as directed by E/I.
Drilling of 450mm Dia bore from 80M BGL to 120M BGL as required for proper completion of work as directed by E/I.
Drilling of 450mm dia bore from 120M BGL to 160M BGL as required for proper completion of work as directed by E/I.
Drilling of 450mm dia bore from 160M BGL 200M BGL as required for proper completion of work as directed by E/I.
Providing and lowering of 300mm dia MSERW 7.1mm thick plain pipe make TATA/ SAIL/JINDAL or other ISI marked approved make including supply and fixing of nut bolts and its packing for tubewell assembly in bore hole and shrouding of pea gravel between annular space of bore hole and tubell assembly from GL to 60m BGL as required for proper completion of work as directed by E/I.(Pea gravel material rate should be paid by separetly)
Providing and lowering of 150mm dia MSERW 7.1mm thick plain pipe make TATA/ SAIL/JINDAL or other ISI marked approved make including supply and fixing of nut bolts and its packing for tubewell assembly in bore hole and shrouding of pea gravel between annular space of bore hole and tubell assembly from 60m BGL to 80m BGL as required for proper completion of work as directed by E/I.(Pea gravel material rate should be paid by separetly)
Providing and lowering of 150 mm dia MSERW 7.1mm thick plain pipe make TATA/ SAIL/JINDAL or other ISI marked approved make including supply and fixing of nut bolts and its packing for tubewell assembly in bore hole and shrouding of pea gravel between annular space of bore hole and tubell assembly 80m BGL to 120m BGL as required for proper completion of work as directed by E/I.(Pea gravel material rate should be paid by separetly)
Providing and lowering of 150mm dia MSERW 7.1mm thick slotted pipe make TATA/ SAIL/JINDAL or other ISI marked approved make including supply and fixing of nut bolts and its packing for tubewell assembly in bore hole and shrouding of pea gravel between annular space of bore hole and tubell assembly from 80m BGL to 120m BGL as required for proper completion of work as directed by E/I.(Pea gravel material rate should be paid by separetly)
Providing and lowering of 150mm dia MSERW 7.1mm thick plain pipe make TATA/ SAIL/JINDAL or other ISI marked approved make including supply and fixing of nut bolts and its packing for tubewell assembly in bore hole and shrouding of pea gravel between annular space of bore hole and tubell assembly from 120m BGL to 160m BGL as required for proper completion of work as directed by E/I.(Pea gravel material rate should be paid by separetly)
Providing and lowering of 150mm dia MSERW 7.1mm thick slotted pipe make TATA/ SAIL/JINDAL or other ISI marked approved make including supply and fixing of nut bolts and its packing for tubewell assembly in bore hole and shrouding of pea gravel between annular space of bore hole and tubell assembly from 120m BGL to 160m BGL as required for proper completion of work as directed by E/I.(Pea gravel material rate should be paid by separetly)
Providing and lowering of 150mm dia MSERW 7.1mm thick slotted pipe make TATA/ SAIL/JINDAL or other ISI marked approved make including supply and fixing of nut bolts and its packing for tubewell assembly in bore hole and shrouding of pea gravel between annular space of bore hole and tubell assembly from 160m BGL to 180m BGL as required for proper completion of work as directed by E/I.(Pea gravel material rate should be paid by separetly)
Providing and lowering of 150mm dia MSERW 7.1mm thick plain pipe make TATA/ SAIL/JINDAL or other ISI marked approved make including supply and fixing of nut bolts and its packing for tubewell assembly in bore hole and shrouding of pea gravel between annular space of bore hole and tubell assembly from 160m BGL to 180m BGL as required for proper completion of work as directed by E/I.(Pea gravel material rate should be paid by separetly)
Supply & fixing of 300x150mm dia M.S. Reducer 16.0mm thick of heavy quality including all materials, labour and T&P etc. requried for proper completion of work as directed by E/I.
Supply & fixing of 300mm size M.S. Well cap. 12 mm thick of heavy quality including all materials, labour and T&P etc. requried for proper completion of work as directed by E/I.
Supply & fixing 300mm size M.S. half Thread nipple of heavy quality including all materials, labour and T&P etc. requried for proper completion of work as directed by E/I.
Supply & fixing 300mm size M.S. Ring 100mmx12mm thick of heavy quality including all materials, labour and T&P etc. requried for proper completion of work as directed by E/I.
Supply & fixing 150mm size M.S. Ring 100mmx12mm thick of heavy quality including all materials, labour and T&P etc. requried for proper completion of work as directed by E/I.
Supply & fixing 300mm dia size M.S. S/I clamp of heavy quality made out of MS flats, pairs of nut bolts as including all materials, labour and T&P etc. requried for proper completion of work as directed by E/I.
Supply & fixingTube well supproting Frame of heavy quality ncluding all materials, labour and T&P etc. requried for proper completion of work as directed by E/I.
Supply & fixing150mm dia size M.S. Bail plug of heavy quality ncluding all materials, labour and T&P etc. requried for proper completion of work as directed by E/I.
Supply & fixing 150mm Center guide of heavy quality including all materials, labour and T&P etc. requried for proper completion of work as directed by E/I.
Supply & fixing 300mm dia half thread socket of heavy qualityincluding all materials, labour and T&P etc. requried for proper completion of work as directed by E/I.
Supply and stacking pea gravel of size 1.60mm to 4.78mm of LalKuwan quarry duly screened washed and proper stacking at leavelled ground for meserument as directed by E/I.
Development of tubewell by 350 PSI air compressor as required for proper completion of work as directed by E/I.
Development of tube well by O.P. Unit as required for proper completion of work as directed by E/I.
Arranging Chemical and bacteriological test of water from reputed lab and submission of report as required for proper completion of work as directed by E/I.
Arranging Yield and verticality test of tube well from reputed lab and submission of report as required for proper completion of work as directed by E/I.
Logging of tube well (Geological/Geophysical logs) shall be done as per relevent IS code from reputed lab and submission of its report as required for proper completion of work as directed by E/I.
Lowering of 150mm dia M.S. column pipe in tubewell including supply of nuts, and bolts, packing and also carriage of pipe from workshop to site including all labour, T&P etc. required for proper completion of the work
Supply of 1000 LPM 50m head 2900rpm. 25 H.P. Submersible clear water pumping machine make KSB/CALAMA or any approved make by e/i suitable to operate on 415± 5% volt, 50hz, 3-phase A.C. Supply (As per IS 8034-1989) as required for proper completion of work as directed by E/I.
Supply & fixing of steel wire rope for submersible pump including cost of labour, T&P and material reqired for proper completion of the work.
Supply and installation of 150mm dia 5.4mm thick M.S. Column pipe with both end flanged and groove for passing submersible cable in each length in 3m long 30m with 1m long top pipe with cap (Damdam) and sealing ring (12No). 150mm dia CI-D/F 90˚ bend (1 No.), 150mm dia CI-A/F Tee (1No), 150mm dia M.S. Distance piece of 1.00m long 2 Nos. And 1.5m long No.( 3No.) M.S. Enlarger/reducer of suitable size (1No.) 150mm dia P.N. Rating 1.0 Having following specification confirming (As per IS-14846-2000) (2No.) Non rising system with hand wheel), Both end flanged with Isometric trap axial threads for smooth operation of stream.. Face ring pressed in body and wedge.., Wedge tarred on both sides provided with deep grooves inside , Application Handling of clear water sp. Gr. 1.0 (Confirming to 15.780/I.S. 2905), 150mm dia Reflux Valve (Confirming to IS-5312 part-I) Having following specification , Suitable for handing clear water having specific gravity and temperature up to 50˚ , Both : Gun Metal , Hinge pin stainless steel ( 0, Door contact on the periphery , Body : end flanged,, Disc face : High quality mature rubber or better as required for proper completion of work as directed by E/I.
Painting of pumping plant with approved anticorrosive and specified colour paint-2 coat as required for proper completion of work as directed by E/I.
Supply and laying of 150mm dia M.S. Pipe make-TATA/SAIL/JINDLE or other ISI marked approved make including all materials like flange of heavy quality, nuts and bolts and welding of flange to the MS pipe and its cartage at site ,labour and T&P including digging of pits and filling with excavated earth and then its leveling and dressing as required for proper completion of work as directed by E/I.
Supply and laying of 100mm dia M.S. Pipe make-TATA/SAIL/JINDLE or other ISI marked approved make including all materials like flange of heavy quality, nuts and bolts and welding of flange to the MS pipe and its cartage at site ,labour and T& p as required for proper completion of work as directed by E/I.
Providing and fixing MS reducer (150x100)mm for making tubwell assembly, including cost of all labour, materials, and T&P required for assembly making and proper completion of work.
Providing and fixing 100mm GM full way Gate valve with wheel ISI mark heavy quality including supply of all materils, labour and T&P required for proper completion of work.
Providing and fixing 150mm GM full way Gate valve with wheel ISI mark heavy quality including supply of all materils, labour and T&P required for proper completion of work.
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 meter (5ft) and lead upto 30 meter (100 ft.) and including filling , watering, and ramming of excavated earth into the trenches or into the space between the building and the side of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 Meters (100Ft.) from the foundation trenches.
Mild steel or iron work in heavy sizes such as trusses built-up gates, door frames, record, racks, roof work, gates etc. wrought to required form including holes rivetting or welding where necessary and also fixing in proper position and alignment including cost of all materials supplied by contractor.
Concrete with 4cm gauge stone ballast coarse sand (F.M. 1.8 to 2.5) & cement in proportion of 12:6:1 in foundation & under floors including supply of all materials, labour and tools and plants etc. required for proper completion.
1st Class brick ( Class-150) work in 1:6 cement and coarse sand ( F.M. 1.8 to 2.5) mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.
1st Class brick ( Class-150) work in 1:6 in super structure cement and coarse sand ( F.M. 1.8 to 2.5) mortar in superstructure for 230mm thick wall including supply of all materials, labour and T&P etc. required for proper completion of the work.
12mm thick plaster with cement mortar consisting of one part of cement and four part of coarse sand (1: 4) minimum thickness not to be less then 10mm including supply of all material, labour and T&P etc. for proper completion of work.
Cement concrete with 2 cm. gauge approved hard stone ballast, approved coarse sand ( F.M. 1.8 to 2.5) and cement in the proportion 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work.
Providing and laying 150mm dia SWR PVC pipe (Finolex or equivalent including cost of all materials, labour and T&P etc. required for proper completion of the work.
TMT/Tor steel in plain work such as reinforced concrete or reinforced brick work. (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage, bend, hooks, and authorized overlapping shall be measured.
RCC work with cement approved coarse sand (F.M. 1.8 to 2.5) and 2cm gauge graded approved hard stone ballast like grainite, quartzite etc from Dalla, Jhansi or other quarries and approved coarse sand in proportion 1:15.;3 in raft foundation and footing, excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P.
RCC work with cement approved coarse sand (F.M. 1.8 to 2.5) and 2cm gauge graded approved hard stone ballast like grainite, quartzite etc from Dalla, Jhansi or other quarries and approved coarse sand in proportion 1:15.;3 in RCC T beam-slab and column,excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P.
Supply of 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work.
Fixing & Grounting 25mm dia M.S. anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. required for proper complition of the work. (Labour rates only)
Local sand filling in plinth including supply of necessary quanity of local sand from outside the UPPCL premises including watering , dressing etc. Rate to include cost of all material, labour and T&P etc. required for proper completion of work.
Supply of 80mm thick I shaped / Zig-Zag etc. coloured machanically compressed inter locking cement concrete paver block manufactured by high pressure & controlled vibration machine having plan dimesion 200x (160+120) with miximum 5mm thick toping of O.P. Cement mixed with 25% marble powder. The compressive strength of concrete pavers block shall not be less than 30 MPa & 4.5Kg/No. including cost of all material, labour and , T&P etc. required for proper completion of work as directed by E/I but execluding U.P.T.T. which shall be paid extra as per rules.
DRILLCONS INDIA
OM TRADERS
Sai Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .