Loading…
Loading…
Tender Value
₹21.8 L
EMD Value
₹21,900
Closing Date
24 Aug 2026, 3:30 pmDue today
Executive Engineer (Central Tender Cell)
Central Tender Cell, BMC, ICOMC Tower
Construction of 05-Seated Public Toilet at Shriya Chhak in Ward No. 35, Bhubaneswar
2026_ORULB_138697_1
BMC-EE-Tender Cell-52/2026-27 dt. 12.08.2026
Open Tender
Civil Works - Others
Percentage
90 days
BMC, AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹21,900
Yes
UG floor,Office Chamber of EE(Central Tender Cell)
14 Aug 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
14 Aug 2026 - 18 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in all kinds of soil including moorum stoney earth and earth mixed with boulders except sheet rock and boulders not requiring blasting including dressing of sides and leveling the bed upto the required depth and depositing the excavated materials away from the work site with all lead and lift including shoring, shuttering & dewatering (if required) with cost of all Labour, Hire & Running charges of the water pumps, Sundries, T & P required for the work complete as directed by the Engineer- in- charge. | 50.81 | cum | 209.95 | ₹10,667.56 |
| 2 | Filling in foundation, trenches and plinth with river sand, well watered and compacted in layers with top surface dressed and leveled to proper gradient including cost of all labours, materials, conveyance, loading and unloading, all taxes and royalties, sundries and T&P etc all complete as per direction of the Engineer -in-charge | 1 | cum | 588.9 | ₹588.31 |
| 3 | Providing and laying of Cement Concrete of grade 1: 4 :8 (1cement : 4 sand : 8 graded stone aggregate of size 25mm to 40 mm hard granite crusher broken metal ) , mixing in concrete mixer ,lowering and compacting in proper thickness , watering & curing for the required period including cost of all labours, materials, conveyance, loading and unloading, all taxes and royalties, sundries and T&P etc all complete as per direction of the Engineer -in-charge. | 1 | cum | 5,624.7 | ₹5,619.08 |
| 4 | Providing Flyash bricks having crushing strength not less than 75 Kg/Sqcm in cement mortar (1:4), immersing the bricks in water before use,splays cutting, circular moulding , corbelling,curing and watering etc.including cost of all labours, materials, conveyance, loading and unloading, all taxes and royalties, sundries and T&P etc all complete as per direction of the Engineer -in-charge | - | cum | 5,507.87 | - |
| 5 | D.P.C. (1:2:4) | - | sqm | 389.53 | - |
| 6 | Providing and laying in position machine batched,/ machine mixed concrete of specified grade for reinforced cement concrete work including laying of concrete using 12 mm 20 mm size crusher broken hard granite chips excluding the cost of centering, shuttering, and reinforcement , improve workability without impairing strength and durability as per direction of Engineer- In - Charge. including cost all materials, conveyance , royalties and taxes, loading and unloading cost of all labour,sundries, T&P etc.complete. | 27.28 | cum | 6,201.98 | ₹1,69,190.01 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting,bending,binding, placing in position and cost of binding wires of 18 to 20 gauge including cost of labours, materials, conveyance, loading and unloading, all taxes and royalties, sundries and T&P etc all complete as per direction of the Engineer -in-charge. | 27.28 | Qntl | 9,552.47 | ₹2,60,591.38 |
| 8 | Providing steel centering and shuttering to required shape and size for all kinds of R.C.C. works centering materials with all necessary bracing, ties and supports with level centering covered with 50 micron polythene sheet/bituminous paper . as per the direction of the Engineer -in-charge and dismantling or removing the shuttering after the required interval from the date of casting, including cost of labours, materials, conveyance, loading and unloading, all taxes and royalties, sundries and T&P etc all complete. A. Column footing | 17.28 | sqm | 251.44 | ₹4,344.88 |
| 8.01 | Plinth beam & Tie beam | - | sqm | 251.44 | - |
| 8.02 | Column | 1 | sqm | 1,219.7 | ₹1,218.48 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
DTCN.pdf
Tender Documents • 0.90 MB
BOQ_605992.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].