Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Finance | -33.20% | ₹5.3 L | L1 | Admitted-Finance |
| 2 | L2₹5.6 L+₹25,601.15 (4.79%)Admitted-Finance | -30.00% | ₹5.6 L+₹25,601.15 (4.79%) | L2 | Admitted-Finance |
| 3 | L3₹5.9 L+₹51,522.32 (9.64%)Admitted-Finance | -26.76% | ₹5.9 L+₹51,522.32 (9.64%) | L3 | Admitted-Finance |
| 4 | L4₹6.5 L+₹1.1 L (21.0%)Admitted-Finance | -19.20% | ₹6.5 L+₹1.1 L (21.0%) | L4 | Admitted-Finance |
| 5 | L5₹6.7 L+₹1.4 L (25.7%)Admitted-Finance | -16.00% | ₹6.7 L+₹1.4 L (25.7%) | L5 | Admitted-Finance |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
25 Aug 2026, 4:00 pmClosed
Executive Engineer
Executive Engineer PWD RnB Division Marwah
CONSTRUCTION OF PATWAR KHANA AT MARGI WARWAN
2026_PWDJK_319562_4
e-NIT No.15 of 2026-27 dated 05-08-2026
Open Tender
Civil Works
Percentage
120 days
Marwah
CONSTRUCTION OF PATWAR KHANA AT MARGI WARWAN
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RnB Division Marwah
₹16,000
Executive Engineer PWD RnB Division Marwah
31 Aug 2026
5 Aug 2026
25 Aug 2026
5 Aug 2026
25 Aug 2026
5 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sidesm and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metresAll kinds of soil : | 24.92 | Cum | 256.85 | ₹6,400.7 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.75 | Cum | 5,202.9 | ₹19,510.88 |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse
sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:
Cement mortar 1:6 (1 Cement : 6 coarse sand) | 12.28 | Cum | 5,402.9 | ₹66,347.61 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 8.98 | Cum | 7,571.55 | ₹67,992.52 |
| 5 | Extra for brick work with common burnt clay bricks/cement concrete bricks in
superstructure above plinth level upto floor five level | 8.98 | Cum | 1,455.65 | ₹13,071.74 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.77 | Cum | 7,788.4 | ₹37,150.67 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level | 467.46 | Kg | 123.2 | ₹57,591.07 |
| 8 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Second class kail wood | - | Cum | 1,01,081.85 | - |
| 9 | Providing wood work in frames of false ceiling, partitions etc. sawn and fixed in
position : Budloo / Fir wood | 1 | Cum | 40,509.4 | ₹40,468.89 |
| 10 | Providing and fixing 12 mm thick flat pressed 3 layer medium density particle board or graded particle board (Grade I) IS: 3087 marked, in ceiling with necessary nails etc. complete (frame work to be paid
separately) : | - | Sqm | 822.65 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_1058939.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .