| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-Finance | ₹14.4 L | L1 | Accepted-Finance DUE TO BELOW RATE |
| 2 | L2₹14.5 LRejected-Finance | ₹14.5 L | L2 | Rejected-Finance DUE TO BELOW RATE |
| 3 | L3₹14.5 LRejected-Finance GRAM POST MAWANA KHURD MAWANA MEERUT | MEERUT | UTTAR PRADESH | 245206 | ₹14.5 L | L3 | Rejected-Finance DUE TO aBOVE RATE |
Updated dates
Tender Value
₹14.5 L
EMD Value
₹1.4 L
Closing Date
19 Mar 2026, 5:00 pmClosed
EO NPP BIJNOR
O/O EO NPP BIJNOR
Construction of Park Boundary wall Interloking Tiles work Pathway and Renovation Work At Ward No. 03 Ravidas Mandir Bijnor
2026_DOLBU_1119767_12
122/ET-NPPB/2025-26
Open Tender
Civil Works
90 days
EO NPP BIJNOR
PLEASE PREFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹766
EO NPP BIJNOR
₹1.4 L
6 Apr 2026
25 Feb 2026
20 Mar 2026
25 Feb 2026
19 Mar 2026
25 Feb 2026
Dimantling brick work or stone work in lime or cement mortar and including stacking or materials as directed by the Engineer-
Disposal of refuse dismantling material all Completion of work cartaege 5.0 Km
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1..
Excavationinfoundationinordinarysoil(Loam,Clayor Sand) including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches.
Cartage of ballast kankar coal gritt or sand etc i/c laoding unloading but excluding staking pucca road.
Concrete in 1:4:8 with cement,fine sand and Stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work.
M-150 brick work in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work.
R.C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage R.C.C Raft Foundation and Footing with 4cm including supply of all material,labour and T&P etc.required for proper completion of work
R.C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage R.C.C Lighter Beam Having Span up to 6 m including supply of all material,labour and T&P etc.required for proper completion of work
R.C.C work in 1:1.5:3 with cement,coarse sand and stone ballast of 2cm guage R.C.C Column including supply of all material,labour and T&P etc.required for proper completion of work
12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work.
C.C in 1:2:4 with cement,coarse sand and stone grit of 2cm guage including supply of all material,labour and T&P etc.required for proper completion of work.
Supply and fixing of mild steel bars for RCC work and angle for channel including supply of all material,labour and T&P etc.required for proper completion of work.
Supply and fixing of mild steel angle for channel including supply of all material,labour and T&P etc.required for proper completion of work.
WBM Grading 3 (22.4-53 mm Stone ballast) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
Supply & laying of 80mm thick I shaped Vibrator made Interlocking Cement concrete pavers block (cement grey and red colour) including joint filling with local sand including supply of all material ,labour and T&P etc.required for proper completion of work (Red Color)
Providing wall putty on New surface with approvel quality material of Berger/J.K./Birla or similar make 2 coates.
Finishing wall with one coat of water proof cement paint Weather coat of approved quality on previously old treated surface with this paint to give an even shade including supply of all marerials, labour, Tools & plant etc. required for proper completion of the work.
Applying primer coat over new steel and other metal surface after paint including preparing the surface by throughly cleaning oil grease dirt and other foreign matter and scoured with wire brushes fine steel/ wood scrappers sand paparing and knotting including coat of all and supply of all materials, labour and T&P etc. required for proper completion of the work.
Painting first coat over priming coat (but excluding cost of (priming coat) on wood or steel and other metal surface with superior synthetic enamel paint of standered make brushing to give an even shade and finished and including cleaning the surface all durt dust and other foreing metter sand paparing and stripping including cost matter and scoured with wire brushes fine steel/ wood scrappers sand paparing and knotting including coat of all and supply of all materials, labour and T&P etc. required for proper completion of the work.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.84 MB
BOQ_2082969.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid