| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 CrAccepted-AOC | ₹14.6 Cr | L1 | Accepted-AOC Financial bid is Accepted at the price of Rs. 146057646.50 by the Employer |
| 2 | L2₹14.7 CrRejected-Finance | ₹14.7 Cr | L2 | Rejected-Finance Due to L2 Rate |
| 3 | L3₹15.1 CrRejected-Finance AGRA ROAD ETA | ETA | ETA | UTTAR PRADESH | ₹15.1 Cr | L3 | Rejected-Finance Due to L3 Rate |
| 4 | L4₹15.5 CrRejected-Finance | ₹15.5 Cr | L4 | Rejected-Finance Due to L4 Rate |
| 5 | L5₹15.9 CrRejected-Finance | ₹15.9 Cr | L5 | Rejected-Finance Due to L5 Rate |
Tender Value
Refer Docs
EMD Value
₹31.1 L
Closing Date
12 Dec 2023, 12:00 pmClosed
SE, Sitapur/Kheri Circle PWD Sitapur
Office of SE, Sitapur/Kheri Circile PWD Sitapur
Widening and Strengthening of Mudrasan Katesar Kakrahi Nadepur Bhulbhuliya Road (O.D.R.)
2023_CEUCZ_867420_1
5034/352C/E.TENDER/STP-LMP/23 Dt. 10.11.2023
Open Tender
Civil Works - Roads
365 days
Sitapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹31.1 L
Yes
Office of SE, Sitapur/Kheri Circile PWD Sitapur
24 Jan 2024
4 Dec 2023
12 Dec 2023
4 Dec 2023
12 Dec 2023
4 Dec 2023
7 Dec 2023
Amount
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unservicable materials and stacking of servicable material to be used or auctioned, upto a lead of 1000 m, including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (RAP with 3.5% emulsion & 1% cement)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Grade-II)
Providing and applying tack coat with bitumen VG_10 using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. Gr-II
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Grade-II)
U shaped RCC drain Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification. (RCC M-20)
Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications
R.C.C. Culvert (1x6.00 & 1x4Mtr. Span) and widening of Culvert Dismentling of brick work or stone work in lime or cement mortar and including stacking materials as directed by Engineer in harge with in a distance of 60 meters ( 200 feet). PWD-692
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification (RCC M-20)
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification (RCC M-30)
Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses 1002, 1010 and 1202
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4
Plastering with cement mortar (1:4) 15 mm thick on brick work in substructure/ superstracutre as per technical specification clauses 613.4 & 1204
Providing and Laying of Weep holes in brick work in abutment and wing wall with 100mm dia PVC pipe extending through the full width of the structure with slope of 1V:20H toward drawing force coplete as per drawing and technical specification MORTH 13.8/27.
Providing Diversion for Opening Communication during Construction Time Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and etc. as per Technical Specification.1000mm dia
Brick soling with straight overbumt brick laid and flat and dry including preparation of subgrade to prescribed camber ard including supply of briks, fillingjoints, with local earth spreading blinding coats I cm. (3/8") deep of local earth of P.L 5 to 7 or sand over the entire surface & including labour and T&P etc. requted for proper completion of work. PWD 762a
1000 mm & 600 mm dia Hume Pipe Culvert Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and etc. as per Technical Specification. 600mm dia
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and etc. as per Technical Specification. 1000 mm dia
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
SHAKUNTALA SINGH
RAM SANEHI AND SONS
M/S SOBTI INFRATECH LIMITED
A K ENGINEERING WORKS
M/S DEEPAK KUMAR AGARWAL
M/S RISHIKA CONSTRUCTION
Awadh Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid