Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 CrAccepted-AOC | L1 | Accepted-AOC being l1 | |
| 2 | L2₹16.4 Cr+₹1.0 Cr (6.64%)Rejected-Finance 184 MAIN STREET NASIRABAD AJMER RAJASTHAN 305601 | L2 | Rejected-Finance NOT BEING L1 | |
| 3 | L3₹17.0 Cr+₹1.6 Cr (10.4%)Rejected-Finance 244 22 ONKAR NAGAR B TRI NAGAR TRI NAGAR NEW DELHI 110035 NORTH WEST DELHI DELHI 110035 INDIA | NORTH WEST DELHI | DELHI | 110035 | L3 | Rejected-Finance NOT BEING L1 | |
| 4 | L4₹17.3 Cr+₹1.9 Cr (12.4%)Rejected-Finance 11 JAMES HICKEY SARANI 2ND FLOOR KOLKATA 700069 | KOLKATA | KOLKATA | WEST BENGAL | 700069 | L4 | Rejected-Finance NOT BEING L1 | |
| 5 | L5₹17.5 Cr+₹2.1 Cr (13.5%)Rejected-Finance PLOT NO 128 DHARMA VIHAR KHANDAGIRI BHUBANESHWAR ODISHA 751030 | BHUBANESHWAR | KHORDHA | ODISHA | 751030 | L5 | Rejected-Finance NOT BEING L1 |
| Sl No | Description | Qty | Unit | NIRMAL SALES CORPORATION L3 | Agarwal Jagdish Construction Company Private Limited L2 | D R STEEL CONSTRUCTION COMPANY PRIVATE LIMITED L4 | CMRGS Infrastructure Projects Ltd L5 | RAVIRANJAN KUMAR RAJA L1 | SNG BUILDERS AND ENGINEERS L7 | Jasvit Constructions Private Limited L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE "A" Part-I (Building/Structures) (To be quoted by the tenderer) | ||||||||||
| 2.00 | Item No 01 : Design and construction of OPD COMPLEX ALONGWITH DEPARTMENT OF EMERGENCY AND TRAUMA CARE complete all as specified in soil bearing capacity report, design basis report, schedule of finishes, drawings and tender documents. | 1 | Lump sum | 9,85,22,750 ₹9,85,22,750 | 9,68,00,000 ₹9,68,00,000 | 8,84,00,000 ₹8,84,00,000 Lowest | 10,10,00,000 ₹10,10,00,000 | 9,75,00,000 ₹9,75,00,000 | 15,00,00,000 ₹15,00,00,000 | 12,00,00,000 ₹12,00,00,000 |
| 3.00 | Item No 02 : Design and construction of AC Plant Room complete all as specified in soil bearing capacity report, design basis report,schedule of finishes, drawings and tender documents. | 1 | Lump sum | 1,08,25,600 ₹1,08,25,600 | 20,00,000 ₹20,00,000 | 1,85,30,000 ₹1,85,30,000 | 1,10,50,000 ₹1,10,50,000 | 30,00,000 ₹30,00,000 | 9,00,000 ₹9,00,000 Lowest | 10,00,000 ₹10,00,000 |
| 4.00 | Item No 03 : Design and construction of UG Sump 100000 Gallon) complete all as specified in soil bearing capacity report, design basis report,schedule of finishes, drawings and tender documents. | 1 | Lump sum | 1,08,25,425 ₹1,08,25,425 | 15,00,000 ₹15,00,000 Lowest | 1,25,00,000 ₹1,25,00,000 | 1,10,50,000 ₹1,10,50,000 | 25,00,000 ₹25,00,000 | 18,00,000 ₹18,00,000 | 40,00,000 ₹40,00,000 |
| 5.00 | Sch 'A' Part-II (External Water supply) Lump sum price worked out by the contractor for (External Water supply) as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | 1 | Lump sum | 1,87,200 ₹1,87,200 | 2,22,128.31 ₹2,22,128.31 | 21,872 ₹21,872 Lowest | 2,00,000 ₹2,00,000 | 1,80,000 ₹1,80,000 | 2,25,000 ₹2,25,000 | 1,95,000 ₹1,95,000 |
| 6.00 | Sch 'A' Part-III (External Water supply) Lump sum price worked out by the contractor for (External Water supply) as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES. | 1 | Lump sum | 28,35,210 ₹28,35,210 | 31,79,105.31 ₹31,79,105.31 | 31,79,105 ₹31,79,105 | 28,50,000 ₹28,50,000 | 26,20,000 ₹26,20,000 | 3,50,000 ₹3,50,000 Lowest | 30,00,000 ₹30,00,000 |
| 7.00 | Sch 'A' Part-IV (Road Path Culvert) Lump sum price worked out by the contractor for (Road Path Culvert) as listed in Schedule 'A' Part-IV against the lump sum price inserted by the MES. | 1 | Lump sum | 6,67,525 ₹6,67,525 | 7,60,652.52 ₹7,60,652.52 | 7,28,950 ₹7,28,950 | 6,75,000 ₹6,75,000 | 6,50,000 ₹6,50,000 Lowest | 7,00,000 ₹7,00,000 | 6,50,000 ₹6,50,000 Lowest |
| 8.00 | Sch 'A' Part-V (Sewage Disposal) Lump sum price worked out by the contractor for (Sewage Disposal) as listed in Schedule 'A' Part-V against the lump sum price inserted by the MES. | 1 | Lump sum | 16,01,000 ₹16,01,000 | 18,87,211.38 ₹18,87,211.38 | 1,80,577 ₹1,80,577 Lowest | 16,00,000 ₹16,00,000 | 14,75,000 ₹14,75,000 | 17,00,000 ₹17,00,000 | 15,90,000 ₹15,90,000 |
| 9.00 | Sch 'A' Part-VI (Area Drainage) Lump sum price worked out by the contractor for (Area Drainage) as listed in Schedule 'A' Part-VI against the lump sum price inserted by the MES. | 1 | Lump sum | 39,02,100 ₹39,02,100 Lowest | 52,60,760.69 ₹52,60,760.69 | 48,39,899 ₹48,39,899 | 41,25,000 ₹41,25,000 | 40,00,000 ₹40,00,000 | 45,00,000 ₹45,00,000 | 42,00,000 ₹42,00,000 |
| 10.00 | Sch 'A' Part-VII (Compound Wall) Lump sum price worked out by the contractor for (Compound Wall) as listed in Schedule 'A' Part-VII against the lump sum price inserted by the MES. | 1 | Lump sum | 23,41,645 ₹23,41,645 Lowest | 28,19,454.94 ₹28,19,454.94 | 27,01,977 ₹27,01,977 | 25,50,000 ₹25,50,000 | 25,25,000 ₹25,25,000 | 27,00,000 ₹27,00,000 | 25,00,000 ₹25,00,000 |
Tender Value
₹15.0 Cr
EMD Value
₹10.7 L
Closing Date
19 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer Jabalpur Zone
HQ Chief Engineer Jabalpur Zone Ridge Road Jabalpur Cantt 482001
PROVN OF OPD COMPLEX ALONGWITH DEPARTMENT OF EMERGENCY AND TRAUMA CARE AT MH GAYA
2025_MES_746714_1
753029A PROVN OF OPD COMPLEX ALONGWITH DEPARTMENT OF EMERGENCY AND TRAUMA CARE AT MH GAYA
Open Tender
Civil Works
Lump-sum
365 days
GAYA
AS PER NIT
8 documents required · 8 mandatory
₹3,000
Yes
GE GAYA
₹10.7 L
Yes
12 Jun 2026
15 Jan 2026
26 Feb 2026
15 Jan 2026
19 Feb 2026
12 Feb 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SCHEDULE "A" Part-I (Building/Structures) (To be quoted by the tenderer) | - | - | - | - |
| 2 | Item No 01 : Design and construction of OPD COMPLEX ALONGWITH DEPARTMENT OF EMERGENCY AND TRAUMA CARE complete all as specified in soil bearing capacity report, design basis report, drawings and tender documents. | 1 | Lump sum | - | - |
| 3 | Item No 02 : Design and construction of AC Plant Room complete all as specified in soil bearing capacity report, design basis report, drawings and tender documents. | 1 | Lump sum | - | - |
| 4 | Item No 03 : Design and construction of UG Sump 100000 Gallon) complete all as specified in soil bearing capacity report, design basis report, drawings and tender documents. | 1 | Lump sum | - | - |
| 5 | Sch 'A' Part-II (External Water supply) Lump sum price worked out by the contractor for (External Water supply) as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 6 | Sch 'A' Part-III (External Water supply) Lump sum price worked out by the contractor for (External Water supply) as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 7 | Sch 'A' Part-IV (Road Path Culvert) Lump sum price worked out by the contractor for (Road Path Culvert) as listed in Schedule 'A' Part-IV against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 8 | Sch 'A' Part-V (Sewage Disposal) Lump sum price worked out by the contractor for (Sewage Disposal) as listed in Schedule 'A' Part-V against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 9 | Sch 'A' Part-VI (Area Drainage) Lump sum price worked out by the contractor for (Area Drainage) as listed in Schedule 'A' Part-VI against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 10 | Sch 'A' Part-VII (Compound Wall) Lump sum price worked out by the contractor for (Compound Wall) as listed in Schedule 'A' Part-VII against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.84 MB
1T.pdf
Tender Documents • 4.64 MB
BOQ_838338.xls
BOQ • 2.45 MB
date_029.pdf
PDF • 0.12 MB
date_753029.pdf
PDF • 0.12 MB
753029.pdf
PDF • 0.18 MB
753029.pdf
PDF • 0.18 MB
C4.pdf
PDF • 0.18 MB
C3.pdf
PDF • 12.80 MB
753029.pdf
PDF • 0.18 MB
753029.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .