Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹11.2 L
EMD Value
₹11,190
Closing Date
27 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Priesident, Karaipudur.
Panchayat Office, Karaipudur.
Construction of 1,00,000 litre capacity Sump at Karaipudur H/O Karaipudur. Palladam Block.
2022_RDTN_271759_2
2715/2021/A3
Open Tender
Civil Works
Item Rate
90 days
Karaipudur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,190
Yes
Karaipudur
27 Dec 2022
12 Dec 2022
27 Dec 2022
12 Dec 2022
27 Dec 2022
12 Dec 2022
15 Dec 2022
Amount
Construction of 1,00,000 litre capacity Sump at Karaipudur H/O Karaipudur
Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earthmixed with 50% fair sized boulders etc.,
Levelling coarse in cement concrete1:4:8 (one cement,four sand and eightaggregate) using 40mm hard broken stonefor foundation and leveling coarseincluding cost of all materials,mixing,placing, ramming, curing,finishing etc., complete and as directedby Officers.
Reinforced Cement Concrete1:1.5:3 using Machine crushed 20mm ISSHBG stone for the following membersexcluding the cost of reinforcement andfabricating, centering, shuttering andstrutting charges but including the costof all materials, mixing, placing inposition, lifting, vibrating, finishing& curing, etc. complete.and as directedby Officers.
Reinforced Cement Concrete1:1.5:3 using Machine crushed 20mm ISSHBG stone for the following membersexcluding the cost of reinforcement andfabricating, centering, shuttering andstrutting charges but including the costof all materials, mixing, placing inposition, lifting, vibrating, finishing& curing, etc. complete.and as directedby Officers.
Up to 1.50 m below GL
Upto 4.50 m above GL from GL
Supply and erection of steel centering,shuttering for soffits and sidesincluding necessary supports andstrutting for all RCC works using MSsheets of suitable size of BG 10stiffened with MS angle of size 25 X 25X 3mm for boarding laid over Silver Oakjoists of size 10cm X 6.5cm space at10cm c/c and supported by Casurino Props10cm - 13cm spaced at 75cm c/c etc.,
For 0.00 to 3.30 M (Plane Surface)
For 0.00 to 3.30 M (Curved Surface)
For 0.00 to 3.30 M (FOR ROUND COLUMN)
For 3.30 M- 4.3 M (Plane Surface)
Supplying, fabricating and placing inposition of RTS rods for reinforcementposition of RTS rods for reinforcementwire, labour charges etc., complete forRCC works and as directed by Officers.
For RCC WorksUpto 16 mm dia
Providing RCC (1:1.5:3) Ventilator of 0.150 m dia using20mm HBG stone including cost of allmaterials, centering, shuttering,strutting,reinforcement, placing ofconcrete, finishing, curing and fixingin position on the roof slab withmosquito proof net arrangement and etc.,
Supply,Delivery and fixing of CI Manholeframe with cover of following sizeincluding cost of all materials, fixingof MS clamps,Bolt and nuts etc.,completeand as directed by Officers.
Supplying and fixing in position of RCC(1:1.5:3) in side access lader offollowing size using 20mm size HBS jellyincluding cost of all materials,centring, shuttering,strutting,fabrication and placing in position ofreinforcement, finishing, curing etc.,
Refilling the foundation with conveyed gravel (other than sand) in layers of notmore than 15cm thick, watering, wellramming, consolidating, complying withstandard specification and as directedby Officers.
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Duraisamy
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .