| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹211.0 CrAdmitted-Finance SECTOR 3 NEAR BJP HEAD OFFICE TRIKUTA NAGAR 180012 | JAMMU | JAMMU AND KASHMIR | 180012 | ₹211.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹218.5 CrAdmitted-Finance 401 501 HARSH ANAND YEOLEKAR MALA COLLEGE ROAD NASHIK 422005 | NASHIK | NASHIK | MAHARASHTRA | 422005 | ₹218.5 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Harsh Constructions Pvt Ltd L2 | SRM Contractors Limited L1 |
|---|---|---|---|---|---|
| 1.00Civil Work Portion | |||||
| 1.00 | Cutting down trees including trunks and branches with girths above 30 cm. to 60 cm. and stacking the material neatly with all lifts and lead of 1000 m as directed and earth filling in the depression/pit if any. | 10 | Number | 615 ₹6,150 | 590 ₹5,900 |
| 1.00 | Cutting down trees including trunks and branches with girths above 60cm to 90cm and stacking the materials neatly with all lifts and lead of 1000m. as directed and earth filling in the depression/pit if any. | 5 | Number | 1,017 ₹5,085 | 976 ₹4,880 |
| 1.00 | Cutting down trees including trunks and branches with girths above 90 cm. to 180 cm. and stacking the material neatly with all lifts and lead of 1000 m as directed and earth filling in the depression/pit if any. | 5 | Number | 3,000 ₹15,000 | 2,013 ₹10,065 |
| 1.00 | Dismantling brick masonry in lime or cement mortar and stacking the materials as directed with all leads, lifts, complete. | 200 | Cum | 402 ₹80,400 | 386 ₹77,200 |
| 1.00 | Dismantling stone masonry in lime or cement mortar including stacking the materials as directed with all leads, lifts complete | 250 | Cum | 456 ₹1,14,000 | 438 ₹1,09,500 |
| 1.01 | Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts complete. | 200 | Cum | 1,116 ₹2,23,200 | 1,072 ₹2,14,400 |
| 1.01 | Dismantling the R.C.C. work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed. | 200 | Cum | 1,742 ₹3,48,400 | 1,673 ₹3,34,600 |
| 1.01 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.5 metre) by Mechanical Means.. | 12,441.69 | Cubic Metre | 190 ₹23,63,921.1 | 240 ₹29,86,005.6 |
| 1.01 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.50 m) by Mechanical Means.. | 9,385.8 | Cubic Metre | 201 ₹18,86,545.8 | 265 ₹24,87,237 |
Tender Value
₹201.0 Cr
EMD Value
₹2.0 Cr
Closing Date
25 May 2026, 5:00 pmClosed
CE MSIDC
13th floor Bakhtawar building Nariman point Mumbai
PROPOSED CONSTRUCTION AND INTEGRATED DEVELOPMENT OF DARSHAN PATH TAPPA-2 FOR DARSHAN PATH-2, GHAT SHAHI MARG AND SHIVDARSHAN PATH AT TRIMBAKESHWAR, DIST. NASHIK FOR NASHIK TRIMBAKESHWAR SINHASTHA KUMBHMELA. (INCLUDING ELECTRICAL WORK)
2026_MSIDC_1298800_1
2A
Open Tender
Civil Works
365 days
Nashik
Please refer Tender documents.
7 documents required · 7 mandatory
₹11,800
Yes
₹2.0 Cr
Yes
CE MSIDC
23 Jun 2026
28 Apr 2026
27 May 2026
28 Apr 2026
25 May 2026
28 Apr 2026
6 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Work Portion | |||||
| 1.001 | Cutting down trees including trunks and branches with girths above 30 cm. to 60 cm. and stacking the material neatly with all lifts and lead of 1000 m as directed and earth filling in the depression/pit if any. | - | Number | 561.08 | - |
| - | Cutting down trees including trunks and branches with girths above 60cm to 90cm and stacking the materials neatly with all lifts and lead of 1000m. as directed and earth filling in the depression/pit if any. | - | Number | 930.01 | - |
| - | Cutting down trees including trunks and branches with girths above 90 cm. to 180 cm. and stacking the material neatly with all lifts and lead of 1000 m as directed and earth filling in the depression/pit if any. | - | Number | 1,917.11 | - |
| - | Dismantling brick masonry in lime or cement mortar and stacking the materials as directed with all leads, lifts, complete. | - | Cum | 367.83 | - |
| - | Dismantling stone masonry in lime or cement mortar including stacking the materials as directed with all leads, lifts complete | - | Cum | 417.24 | - |
| - | Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts complete. | - | Cum | 1,021.14 | - |
| - | Dismantling the R.C.C. work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed. | - | Cum | 1,593.2 | - |
| - | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.5 metre) by Mechanical Means.. | - | Cubic Metre | 227.29 | - |
| - | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.50 m) by Mechanical Means.. | 1 | Cubic Metre | 249.25 | ₹249 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.67 MB
RFP.pdf
Tender Documents • 5.37 MB
BOQ_2230603.xls
BOQ • 0.94 MB
Drawing.pdf
Tender Documents • 16.79 MB
CSD.pdf
PDF • 0.22 MB
Date2.pdf
PDF • 0.26 MB
Date1.pdf
PDF • 0.20 MB