Loading…
Loading…
Tender Value
₹5.0 L
EMD Value
₹9,900
Closing Date
1 Aug 2026, 6:00 pm6d left
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Construction of Tile Work in Govt. HS Kanjli W.No. 9 Pyt KANJLI Block Katra Distt Reasi under PRI grant for the year 2026-27.
2026_RDPR_317589_5
e-NIT No. 63 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
90 days
Reasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
MH 0515
₹9,900
24 Jul 2026
24 Jul 2026
3 Aug 2026
24 Jul 2026
1 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : | 4.86 | Cum | 479.3 | ₹2,329.4 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 29.74 | Cum | 4,826.5 | ₹1,43,540.11 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 5.04 | Cum | 5,733.6 | ₹28,897.34 |
| 4 | Centring and shuttering including strutting propping etc and removal of formwork for: foundation footings,bases of columns etc for mass concrete. | 40.3 | sqm | 286.35 | ₹11,539.91 |
| 5 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory
compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand complete all as per direction of Engineer-in-Charge.
16.94.1 80 mm thick C.C. paver block of M-30 grade with approved color design and pattern. | 307.5 | sqm | 929.85 | ₹2,85,928.88 |
| 6 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 0.9 | Cum | 6,591.25 | ₹5,932.13 |
| 7 | Carriage of Cement/Steel from an avg. distance of 5.00 K.M by MT | 5 | Mt | 178.43 | ₹892.15 |
| 8 | Carriage of sand from an avg. distance of 5.00 K.M by MT | 37.35 | Cum | 200.74 | ₹7,497.64 |
| 9 | Carriage of Aggregates from an avg. distance of 5.00 K.M by MT | 27.38 | Cum | 200.74 | ₹5,496.26 |
| 10 | cost of CIB including concrete/Brick Pedestal of Size 3'x2' plastering, painting all complete job (as per direction of Engineer Incharge) | 1 | No. | 3,000 | ₹3,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_1041878.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].