| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | L1 | Accepted-AOC First lowest Bidder | |
| 2 | L2₹8.4 L+₹42,073.08 (5.27%)Rejected-Finance | L2 | Rejected-Finance Non Lowest Bidder |
| Sl No | Description | Qty | Unit | Sushil Kumar L1 | M/S A.S. CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Silt Clearance and Scraping work from Km. 0.000 To Km. 4.000 And From Km. 9.000 To Km.22.264 of Bankiya Dy. | |||||
| 1.01 | Scrapping internal section of existing channel i.e. Bed & Slope with silt upto 5 cm. | 37,289 | Sqm | 3.9 ₹1,45,427.1 Lowest | 4.1 ₹1,52,884.9 |
| 1.02 | Silt clearance/trench digging lift up to 1.5m and lead up to 6m ,including cost of driver/assistant driver, POL, maintenance of machine,contractor profit, taxes etc .and also including leveling,dressing & compaction. a) by Pocklane/equivalent capacity 60cum/hour ie. | 12,373.77 | Cum | 33.9 ₹4,19,470.8 Lowest | 36.08 ₹4,46,445.62 |
| 1.03 | Silt clearance/trench digging lift up to 1.5m and lead up to 6m ,including cost of driver/assistant driver, POL, maintenance of machine,contractor profit, taxes etc .and also including leveling,dressing & compaction. a) by hydraulic excavator/JCB/equivalent capacity 25cum/hour ie. | 1,360.08 | Cum | 37.3 ₹50,730.98 Lowest | 38.3 ₹52,091.06 |
| 1.04 | Earth Work in silt clearance including ilft up to 1.5 M and lead up to 30M including ramming and Dressing by manual. The earth From clearance to be used in side embankment or to be disposed off at spoil banks or as directed By Engineer in charge Dys, & mr. | 3,140.19 | Cum | 58.3 ₹1,83,073.08 Lowest | 60.3 ₹1,89,353.46 |
Tender Value
Refer Docs
EMD Value
₹89,000
Closing Date
16 Oct 2025, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer I D Etah AGra Road Etah
Silt Clearance and Scraping work from Km. 0.000 To Km. 4.000 And Km. 9.000 To Km. 22.264 of Bankiya Dy.
2025_UPIDC_1080834_1
03/EE/2025-2026
Open Tender
Civil Works - Canal
Item Rate
30 days
District Mainpuri
Please Refer Tender Document
2 documents required · 2 mandatory
₹766
₹89,000
Yes
10 Nov 2025
9 Oct 2025
16 Oct 2025
9 Oct 2025
16 Oct 2025
9 Oct 2025
Amount
Silt Clearance and Scraping work from Km. 0.000 To Km. 4.000 And From Km. 9.000 To Km.22.264 of Bankiya Dy.
Scrapping internal section of existing channel i.e. Bed & Slope with silt upto 5 cm.
Silt clearance/trench digging lift up to 1.5m and lead up to 6m ,including cost of driver/assistant driver, POL, maintenance of machine,contractor profit, taxes etc .and also including leveling,dressing & compaction. a) by Pocklane/equivalent capacity 60cum/hour ie.
Silt clearance/trench digging lift up to 1.5m and lead up to 6m ,including cost of driver/assistant driver, POL, maintenance of machine,contractor profit, taxes etc .and also including leveling,dressing & compaction. a) by hydraulic excavator/JCB/equivalent capacity 25cum/hour ie.
Earth Work in silt clearance including ilft up to 1.5 M and lead up to 30M including ramming and Dressing by manual. The earth From clearance to be used in side embankment or to be disposed off at spoil banks or as directed By Engineer in charge Dys, & mr.
M/S A.S. CONSTRUCTION (BID ID -5598039)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .