| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 CrAccepted-AOC UTTAR PRADESH UTTAR PRADESH | ₹8.8 Cr | L1 | Accepted-AOC BOND SIGNED |
| 2 | L2₹8.8 Cr+₹6,959.27 (<0.01%)Rejected-Finance | ₹8.8 Cr+₹6,959.27 (<0.01%) | L2 | Rejected-Finance L2 |
| 3 | L3₹8.8 Cr+₹62,083.25 (0.07%)Rejected-Finance | ₹8.8 Cr+₹62,083.25 (0.07%) | L3 | Rejected-Finance L3 |
| 4 | L4₹8.9 Cr+₹2.9 L (0.32%)Rejected-Finance NEERU WALA BAGH FIROZABAD UTTAR PRADESH | ₹8.9 Cr+₹2.9 L (0.32%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical 12 10 LOHIYA MARG DISTT PRAYAGRAJ U P | PRAYAGRAJ | UTTAR PRADESH | 211001 | - | - | Rejected-Technical DISQUALIFY |
Tender Value
₹8.9 Cr
EMD Value
₹17.8 L
Closing Date
10 Feb 2020, 12:00 pmClosed
Superintending Engineer
Pratapgarh Circle, PWD, Pratapgarh
Under State Road Fund Widening AND Strengthening of Mohanganj to Saray Harinarayan Via Belkhari in District Pratapgarh
2020_CEALD_430897_1
358/93C/etendering/P.F.C/2020 Dt 22.1.2020
Open Tender
Civil Works
Item Rate
270 days
PBH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
Exn. Engg.Construction Division 2, PWD, PRATAPGARH
₹17.8 L
Pratapgarh Circle, PWD, Pratapgarh
5 May 2020
4 Feb 2020
10 Feb 2020
4 Feb 2020
10 Feb 2020
4 Feb 2020
7 Feb 2020
Earthwork in trenches for widening of existing road in ordinary soil including lift upto 1.50 mtr & lead upto 30 mtr & also including remaining dressing the surface to required level & slope. icluding cost of all labour, material and taxes etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. icluding cost of all labour, material and taxes etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Scraping old painted surface including disposal of all scraped material to a distance of 30mtrs. as directed by the engineer in charge. S.I. 772.icluding cost of all labour, material and taxes etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Construction of granular sub-base coarse by providing coarse graded Material, grading one spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 .icluding cost of all labour, material and taxes etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, with 1% OPC cement & 3.5% emulsion laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.icluding cost of all labour, material and taxes etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing laying and spreading material on Prepared sub base, cement @ 4% by weight to the spread Material Manually, Mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired uncomfined comprresive strength and to form a layer of base.for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared Primed surface/bitumen surface cleaned with mechanical broom.including cost of bitumen for proper completion of work as per direction of E/I. including cost of all labour, material and taxes etc. but GST will be paid extra as per prevelling rules.
Providing, laying and rolling of open - graded premix surfacing with plant and paver of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 80-100 KN capacity, finished to required level and grades to followed by seal coat. icluding cost of all labour, material and taxes etc. for proper completion of work by mechnical means clause no. MORD 508 case-ii as per direction of E/I including cost of bitumen and including cost of all labour, material and taxes etc.but GST will be paid extra as per prevelling rules.
Providing and laying seal coat Type C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall . icluding cost of all labour, material and taxes etc. for proper completion of work as per direction of E/I including cost of bitumen but GST will be paid extra as per prevelling rules.
Same as above in item no 2 but for Construction of Shoulder/Patri .for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Earth work in excavation in foundation trenches or drains (not excceding 1.5 m. in width or 10sqm.on plan) including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 30m.for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Concrete with 40mm gauge bick ballast. Fine sand of 1.25 fm and cement in proportion of 8:4:1 in foundantion and under floor for proper completion of work by mechnical means clause no. MORD 510 case-ii as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing and laying 40 mm gauge brick ballast below pipe and in sides for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Supply of 350 mm dia NP3 pipe for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
laying & fixing of 350 mm dia NP-3 pipe with collers for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Class 150 brick work in foundation and plinth with cement mortar 1:3 (1Cement :3 Coarse sand) for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Struck Cement Pointing on Brick work with cement mortar 1:2 (1 Cement : 2 Fine sand)for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
12mm cement plaster in 1;3 cement & coarse sand mortar for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing and laying 20 mm gauge approved stone in proportion of 1:1.50: 3 (1cement:1.50 coarse sand:3 graded stone grit 20 mm size) by laid over base concrete including supply all materials, curing , labour and T&P etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
MS Iron work @ 1%. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
M/S SHANKAR CONSTRUCTION
M/s S S Associates, Alld
M/s Harsh Construction
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .