| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC 1 PNETH CHOORI CHAMBA CHAMBA HIMACHAL PRADESH 176311 UDYAM HP 02 0007745 | CHAMBA | HIMACHAL PRADESH | 176311 | ₹8.4 L | L1 | Accepted-AOC Lower Quoted Rates |
| 2 | L2₹9.3 LRejected-Finance SHED NO 9 TAHLIWAL DISTT UNA H P | ₹9.3 L | L2 | Rejected-Finance higher Quoted Rates |
| 3 | L3₹9.5 LRejected-Finance | ₹9.5 L | L3 | Rejected-Finance higher Quoted Rates |
| 4 | L4₹9.7 LRejected-Finance | ₹9.7 L | L4 | Rejected-Finance higher Quoted Rates |
Updated dates
Tender Value
₹8.9 L
EMD Value
₹8,902
Closing Date
30 Jan 2026, 5:00 pmClosed
Sr. Executive Engineer
Sr. Executive Engineer Electrical Division HPSEBL Gagret
Tender for prov. and Augmentation of 11/0.4 KV 63 KVA to 11/0.4 KV 250 KVA DTR along with reconductoring of 3-Phase LT line with conductor 7/3.81 (80 mm2) and AB cable for SOP to 12.5 BHP m/c for the Sub-Project-PW-CUM-LIS Nakroh under ESD, M/pur.
2026_HPSEB_126295_1
GED-166/2025-26
Open Tender
Electrical Works
90 days
Daulatpur
Please refer Tender Document.
2 documents required · 2 mandatory
₹590
₹8,902
2 Apr 2026
20 Jan 2026
31 Jan 2026
20 Jan 2026
30 Jan 2026
20 Jan 2026
Augmentation of S/Stn.:- Erection of 11/0.4 KV 250 kVA Transformer, Cable, service Cable and Energy Meter complete in all respect.
Removing of existing S/Stn.:- Removing of existing 63 KVA DTR, 3-Phase 4 wire Energy meter, LT Distribution panel Box with from structure and Hand over removed extisting 11/0.4 KV 63 KVA DTR to Engineer Incharge complete in all respect.
Earthing for 3 Nos Earths includes Digging of pit, Fixing of earth rod, clamp, earth wire and connecting to the structure, Providing Charcoal and Salt for the earthing, Filling of the pit with material, Providing Earthing Conn. To G.O Switch, Lightning Arrestor Etc.& Poles complete in all respect.
Supply Part /Augmentation Part of 11/0.4 KV 63 KVA to 250 KVA DTR
Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 250 KVA
Prov. Earthing Set Sub Station GI pipe 40 mm, GI Socket MS Plate 300X300X6 mm
Prov. Energy Meters LT 3-ɸ, 4 wire CT operated Static Tri-Vector meter (CT-300/5 A) Accuracy Class: 0.5S, Category-C, DLMS Compliant for 250 KVA Transformer
Prov. Cable LT 3.5 X 240 mm² 1.1 kV XLPE Cable Unarmoured
Prov. Cable LT 3.5 X 185 mm² 1.1 kV XLPE Cable Unarmoured
Prov. Panel (Distribution Box LT 250 kVA DTR MS Sheet of 1.6 mm ( 1100x800x275 mm ) cubide Box complete with stand etc and Al Busbar 40x6 mm( min. 100 Amp ) , AI 50X50X6 mm of length 2.2 Mtr inside .painted /powder coated after primar coating With CoppPer thimbles of 200 Amp, Insulating sleeves etc. MCCB 400 amp 3P 50kA -1 No. ICS 100 % ICU & MCCB 250 Amp 36 kA =3 nos (1 No Supply by HPSEBL)
Prov. Red Oxide
Prov. Aluminium Paint
Erection/Reconductoring Part 3-Phase LT line
Erection of LT line.Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.81 (80 mm2) Conductor of New 3-Ph. L.T Line complete in all respect.
Laying of LT Cable:- Stringing & Sagging of Cable LT 3.5 X 50 mm² PVC(1.1kV, Al, Un-Armour) cable complete in all respect
Dismentalling of existing LT conductor i.e. Removal of Conductor, De -Stringing and hand over to the Junior Engineer En-Charge complete in all respect
Supply Part /Reconductoring Part 3-Phase LT line
Prov. AAAC 7/3.81 (80mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}
Prov. ST Pole 8 mtr.long alongwith baseplate complete in all respect.
Prov. RCC Muff with concrete filling
Prov. Angle iron (75x75x6) Length 1.5 mtr. + 0.2 mtr.
Prov. Shackle Insulator (16 Kn)
Prov. D-Iron (U-Clamps) (16 Nos Supply by HPSEBL)
Prov. Earth Knob
Prov. LT Stay Set
Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set
Prov. Full Clamps [ 2 No for A.I + 1 No for Stay Set]
Prov. Earthing Set complete
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Spiral PVC Spacer (12 Nos Supply by HPSEBL)
Prov. Aluminium Paint
Prov. Red Oxide
Prov. Cable LT 3.5 X 50 mm² PVC(1.1kV, Al, Un-Armour)
Prov. X-Arm (Horizontal) - MS Channel Iron: 100X50x5, Length [600 mm]
Prov. Knee Bracing Set Length 1100 mm (65X65x6) mm
Prov. Half Clamp for Cross Arm
Prov. Full Clamp
Prov. Insulation Piercing Connector (IPC) having tap upto 50 sq mm
Prov. Anchoring Assembly
Prov. Suspension Assembly
Prov. Facade Hooks
Prov. Pre Insulated connector (jointing sleevs) for AB Cable
Loading of All Allied materials on truck at Divisional Store and same material unloading at road head of site of work and Manual Carriage of All Allied materials For Average Distance From Road To Site Of Work .(If required as per site).
HP ProOne 440 G9 60.5 cm (23.8) All-in-One Desktop PC Enterprise-class performance. All-in-One design 13th Generation Intel® Core™ i7 processor FreeDOS 60.5 cm (23.8) diagonal, FHD, IPS display Intel® UHD Graphics 770 16 GB DDR4-3200 RAM 1 TB SSD Hard drive
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
B.rar
Tender Documents • 0.48 MB
Spc.pdf
Additional Documents • 6.24 MB
BOQ_186172.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid