| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹36.9 CrAccepted-AOC 40 SATSANG COLONY GONDUR ROAD DEOPUR DHULE TAL AND DIST DHULE | DHULE | MAHARASHTRA | 424001 | ₹36.9 Cr Quoted ₹37.7 Cr | H2 | Accepted-AOC H2 |
| 2 | H1₹38.5 CrRejected-AOC RAM PLAZA NAVASHAKTI CHOWK BHABHA NAGAR NASHIK 422 011 | NASHIK | NASHIK | MAHARASHTRA | 422011 | ₹38.5 Cr | H1 | Rejected-AOC H1 |
| 3 | Rejected-Technical HARSH ANAND YEVALEKAR MALA COLLEGE ROAD NASHIK 422005 | NASHIK | NASHIK | MAHARASHTRA | 422005 | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | Pawar Patkar Constructions Pvt.Ltd. H1 | B R BHADANE BUILDCON LLP H2 |
|---|---|---|---|---|---|
| 1.00 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 milimeter beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.5 meter) By Mechanical Means | 2,423.32 | One Cubic Metre | 235 ₹5.7 L | 230 ₹5.6 L |
| 2.00 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift from 1.5 meter to 3.0 meter) By Mechanical Means. | 2,185.71 | One Cubic Metre | 292 ₹6.4 L | 287 ₹6.3 L |
| 3.00 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift from 1.5 meter to 3.0 meter) By Mechanical Means. | 2,185.71 | One Cubic Metre | 349 ₹7.6 L | 342 ₹7.5 L |
| 4.00 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift from 1.5 meter to 3.0 meter) By Mechanical Means. | 728.58 | One Cubic Metre | 292 ₹2.1 L | 287 ₹2.1 L |
| 5.00 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.50 meter) By Mechanical Means. | 29.7 | One Cubic Metre | 257 ₹7,632.90 | 252 ₹7,484.40 |
| 6.00 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift from 1.5 to 3.0 meter) By Mechanical Means | 29.7 | One Cubic Metre | 322 ₹9,563.40 | 316 ₹9,385.20 |
| 7.00 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.5 meter) By Mechanical Means. | 14.85 | One Cubic Metre | 286 ₹4,247.10 | 280 ₹4,158 |
| 8.00 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift from 1.5 meter to 3.0 meter) By Mechanical Means. | 14.85 | One Cubic Metre | 354 ₹5,256.90 | 347 ₹5,152.95 |
| 9.00 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth or murum, ramming, watering including shoring and strutting etcetera complete (lift upto 1.5 meter) By Mechanical Means. | 14.85 | One Cubic Metre | 486 ₹7,217.10 | 477 ₹7,083.45 |
| 10.00 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth or murum, ramming ,watering including shoring and strutting etcetera complete. (Lift from 1.5 meter To 3.0 meter) By Mechanical Means | 7.43 | One Cubic Metre | 594 ₹4,413.42 | 583 ₹4,331.69 |
Tender Value
₹35.3 Cr
EMD Value
₹17.6 L
Closing Date
8 Aug 2025, 6:00 pmClosed
Executive Engineer, P.W.Division, Dhule
Executive Engineer, P.W.Division, Dhule
Construction of New Collector Office Building at Dhule Tal.Dist.Dhule
2025_PWR_1204519_1
Dhule/ETN_No.13/2025-26
Open Tender
Civil Works - Buildings
730 days
Dhule
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,540
₹17.6 L
Chief Engineer, P.W.Region, Nashik
12 Nov 2025
26 Jul 2025
11 Aug 2025
26 Jul 2025
8 Aug 2025
26 Jul 2025
1 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid