Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹67,800
EMD Value
₹2,034
Closing Date
1 Oct 2022, 11:00 amClosed
Executive Engineer JSD PHE Mech Rural Division Sgr
Executive Engineer JSD PHE Mech Rural Division Sgr
Repairs to 63KVA HT/LT Distribution Transformers (03 Nos standby units) for WSS Ganderbal Belt
2022_PHE_189769_1
PHE/MRD/TS/ 97 of 09/2022
Open Tender
Miscellaneous Works
Item Rate
7 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Executive Engineer JSD PHE Mech Rural Division Sgr
₹2,034
6 Oct 2022
24 Sept 2022
1 Oct 2022
24 Sept 2022
1 Oct 2022
24 Sept 2022
Amount
Loading of damaged 63 KVA HT/LT Al. Transformer into private load carrier from WSS Reypora arranged by the firm using channels and skilled/semi-skilled labours then shifting it to workshop for conducting repairs. Dis-assembling of transformer after opening of top lid/cover plate, hauling of the cell from the MS tank, opening of inner core channels and dismantling of the damaged phase legs using special tools and tackles and skilled/semi-skilled labours. Then shifting back of the repaired transformer to the site of work after repairs. The job includes installation of HT Transformer on the two pole structure bed and testing of HT Transformer on load using special tools and tackles and skilled/semi-skilled labours. (each transformer)
Complete rewinding of damaged (01) HT leg (each leg comprising of 03 No. coils) using Al-coils of proper gauge and specification. The job includes tapping of reminded phase legs using cotton tape/varnishing etc. (each transformer)
Complete rewinding of damaged LT Leg Strip wire using Al-Strip wire of proper gauge and specification. The job includes tapping of reminded phase legs using cotton tape/varnishing etc. (each transformer)
Dehydration of moisture from the core by way of heat treatment of same in the electric oven at least for 24 Hours. (each transformer)
Reassembling of the cell closing of the inter case channels and lowering of the cell assembly in the MS tank, fixing of the top core plate using cork gasket, nuts and bolts complete, then testing on full load at site of work. (each transformer)
filling of fresh T-Oil of appropriate strength and specifications T-oil will be provided by the deportment.
Fabrication, P/F of top lid gasket to the transformer including replacement of worn-out nuts-bolts. (each transformer)
Providing and fitting of LT bush rods complete assembly after extraction of old damaged ones. (each transformer)
Providing and fitting of HT bush rods complete assembly after extraction of old damaged ones. (each transformer)
Note:- The old damaged material shall be property of the firm and shall quote the rates with rebate on account of old scrap/material
ishaq electricals
M/s SAJID ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .