Tender Value
₹9.4 Cr
EMD Value
₹18.8 L
Closing Date
23 Oct 2026, 12:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TRD
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. Similar work means - ""Execution of 25kV/2x25kV Electrification work OR Execution of 25kV/2x25kV feeder wire work OR Execution of 25kV/2x25kV OHE modification work OR Execution of 25kV/2x25kV OHE upgradation work OR Execution of 25kV/2x25kV OHE maintenance work OR Execution of 25kV/2x25kV OHE AMC work OR Execution of 25kV/2x25kV OHE rehabilitation work OR Execution of 25kV/2x25kV OHE replacement work i.e. catenary wire/contact wire/feeder wire/ ATD/ cantilever assembly OR Execution of 66kV or higher voltage overhead Transmission line work OR Execution of 66kV or higher voltage Sub-Station work.".
The Tenderer/Firm must have valid Electrical Contractor License (ECL) and copy of license must be uploaded in IREPS site during bid. In case Tenderers submitted with ECL issued in the name of other firms/ tenderers will be summarily rejected. In case the ECL is not valid on the date of opening of tender, details of renewal should be submitted.
16 conditions · 10 needing a document upload
I/ We have read the check list and furnish the documents as per check list.
Goods & Services Tax (GST) registration certificate copy should be attached.
In case of Sole Proprietorship Concern firm has to submit Affidavit certifying the sole Proprietorship of the firm. This affidavit shall be notarized. Or In case of a Partnership Firm, Firm has to submit (a) Notary certified copy of the Partnership Deed. (b) A copy of power of Attorney firm has to submit (duly registered as per prevailing Law) in favour of an individual to tender for the work, sign the agreement etc., and create liability against the Firm. Or In case Tenderer is a Company registered under Companies Act-2013. The tenderer shall submit: (a)The copies of MOA (Memorandum of Association)/AOA (Articles of Association) of the company.(b) A copy of Certificate of Incorporation. (c) A copy of authorization/ Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of company and create liability against the company. Or In case Tenderer is LLP (Limited Liability Partnership); If the tender is submitted on behalf of a LLP registered under LLP Act-2008, the Tenderer shall submit along with tender: (a) A copy of LLP Agreement (b) A copy of Certificate of Incorporation (c) A copy of Power of Attorney/Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP. Or In case of a tenderer is registered Society and Registered trust. The tenderer shall submit: (a) A copy of certificate of registration. (b) A copy of Memorandum of Association of Society/Trust Deed (c)A copy of Power of Attorney in favour of the individual to sign the tender documents and create liability against the society/ Trust.
PAN Card copy should be attached..
EPFO registration certificate copy should be attached.
ESI registration certificate copy should be attached.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Provision of retractable OHE in Pit line at Coaching Complex Durg for maintenance activities of Vande Bharat Rake.
TRD-R-2026-E09~SECR
TRD-R-2026-E09
Open
Works - General
12 Months
Raipur, Chhattisgarh
₹0
₹18.8 L
21 Sept 2026
21 Sept 2026
9 Oct 2026
79 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 9,39,02,221.64 | ||
| — | 1.00 | — | — | ||
| Dismantling of OHE | — | — | — | 26,381 | |
| — | 1.00 | — | — | ||
| 100% extra for Dismantling of OHE under PB working | — | — | — | 26,381 | |
| — | 1.00 | — | — | ||
| 50% extra for Dismantling of OHE under night PB working | — | — | — | 13,190.5 | |
| — | 12.00 | — | — | ||
| Dismantling of Mast/Structure upright | — | — | — | 48,120 | |
| — | 12.00 | — | — | ||
| 100% extra for Dismantling of Mast/Structure upright under PB working | — | — | — | 48,120 | |
| — | 12.00 | — | — | ||
| 50% extra for Dismantling of Mast/Structure upright under night PB working | — | — | — | 24,060 | |
| — | 12.00 | — | — | ||
| Dismantling of Cantilever | — | — | — | 10,524 | |
| — | 12.00 | — | — | ||
| 100% extra for Dismantling of Cantilever under PB working | — | — | — | 10,524 | |
| — | 12.00 | — | — | ||
| 50% extra for Dismantling of Cantilever under night PB working | — | — | — | 5,262 | |
| — | 2.00 | — | — | ||
| Dismantling of Section insulator | — | — | — | 6,678 | |
| — | 2.00 | — | — | ||
| 100% extra for Dismantling of Section insulator under PB | — | — | — | 6,678 | |
| — | 2.00 | — | — | ||
| 50% extra for Dismantling of Section insulator under night PB | — | — | — | 3,339 | |
| — | 1.00 | — | — | ||
| Dismantling of SP/DP isolator | — | — | — | 2,449 | |
| — | 1.00 | — | — | ||
| 100% extra for Dismantling of SP/DP isolator under PB | — | — | — | 2,449 | |
| — | 1.00 | — | — | ||
| 50% extra for Dismantling of SP/DP isolator under night PB | — | — | — | 1,224.5 | |
| — | 2.00 | — | — | ||
| Dismantling of Guy rod | — | — | — | 2,046 | |
| — | 2.00 | — | — | ||
| 100% extra for Dismantling of Guy rod under PB working | — | — | — | 2,046 | |
| — | 2.00 | — | — | ||
| 50% extra for Dismantling of Guy rod under night PB working | — | — | — | 1,023 | |
| — | 1.00 | — | — | ||
| Dismantling of Anticreep | — | — | — | 4,915 | |
| — | 1.00 | — | — | ||
| 100% extra for Dismantling of Anticreep under PB | — | — | — | 4,915 | |
| — | 1.00 | — | — | ||
| 50% extra for Dismantling of Anticreep under night PB | — | — | — | 2,457.5 | |
| — | 2.00 | — | — | ||
| Dismantling of Regulating Equipment assembly with counter & guide tube | — | — | — | 9,518 | |
| — | 2.00 | — | — | ||
| 100% extra for Dismantling of Regulating Equipment assembly with counter & guide tube under PB | — | — | — | 9,518 | |
| — | 2.00 | — | — | ||
| 50% extra for Dismantling under night PB | — | — | — | 4,759 | |
| — | 0.50 | — | — | ||
| Dismantling of small steel parts | — | — | — | 2,477 | |
| — | 0.50 | — | — | ||
| 100% extra for Dismantling of small steel parts under PB working | — | — | — | 2,477 | |
| — | 0.50 | — | — | ||
| 50% extra for Dismantling of small steel parts under night PB working | — | — | — | 1,238.5 | |
| — | 8.00 | — | — | ||
| Dismantling of foundation etc. | — | — | — | 19,248 | |
| — | 10.00 | — | — | ||
| Dismantling of Structure Bond | — | — | — | 670 | |
| — | 6.00 | — | — | ||
| Supply of Single Earth Electrode | — | — | — | 19,326 | |
| — | 6.00 | — | — | ||
| Erection of Single Earth Electrode | — | — | — | 13,710 | |
| — | 1.00 | — | — | ||
| Preparation & Supply of GAD, Section Diagram, LOP & CSD | — | — | — | 8,687 | |
| — | 1.00 | — | — | ||
| Preparation & supply of SED & As erected Drawing | — | — | — | 8,177 | |
| — | 47.50 | — | — | ||
| Supply of Galvanised traction Mast,TTC, Portal, Special type portal (Rolled orFabricated), Fabricated Steel, SPS & Drop Arm etc. | — | — | — | 63,36,642.5 | |
| — | 47.50 | — | — | ||
| Erection of Galvanised traction Mast,TTC, Portal, Special type portal (Rolled orFabricated), Fabricated Steel, SPS & Drop Arm etc. | — | — | — | 3,78,005 | |
| — | 47.50 | — | — | ||
| 100% extra for Erection of Galvanised traction Mast,TTC, Portal, Special type portal (Rolled orFabricated), Fabricated Steel, SPS & Drop Arm etc. under PB working | — | — | — | 3,78,005 | |
| — | 47.50 | — | — | ||
| 50% extra for Erection of Galvanised traction Mast,TTC, Portal, Special type portal (Rolled orFabricated), Fabricated Steel, SPS & Drop Arm etc. under night PB working | — | — | — | 1,89,002.5 | |
| — | 300.00 | — | — | ||
| Concrete for foundation & Plinth In other than Hard & Rocky soil | — | — | — | 21,36,600 | |
| — | 0.72 | — | — | ||
| Provision of retractable OHE arrangment- Design, supply, erection(with foundation/supporting structures),installation, testing and commissioning of Retractable Overhead Conductor-rail System (ROCS) of overall length including transition arrangement from Retractable OHE to conventional OHE including all accessories as per site requirement, IS & IE rules and technical specification completed in all respect in "TKM" | — | — | — | 8,41,31,378.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC2022correctionslipnp1to12_compressed.pdf GCC correction slip 1 to 12
ATTACHMENT
TDRetractableOHE.pdf
ATTACHMENT
RDSO guidelines
ATTACHMENT
1 GCC 2022
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
GCC2022correctionslipnp1to12_compressed.pdf
ATTACHMENT
RDSOLatestGuidelinesforRRCSdated2025-12-26-TIIN0041Rev1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .