Tender Value
₹10.0 L
EMD Value
₹19,960
Closing Date
11 Aug 2026, 6:55 pmClosed
DCF(WL), BIKANER
DCF(WL), BIKANER
NIB for construction of road track
2026_FORES_577948_3
2725 dated 25/07/2026
Open Tender
Civil Works
Percentage
60 days
BIKANER
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EGRAS
₹19,960
Yes
14 Aug 2026
28 Jul 2026
12 Aug 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ट्रैक निर्माण कार्य (जोड़बीड़ कोटडी से गाढवाला मार्ग से सुरधना मार्ग) | - | - | - | - |
| - | PWD Road BSR 2.2(1)(B)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Manual Means, In area of thorny jungle.
1500 x4 = 6000 sqm /10000 = 0.60 hec | 0.6 | Hec. | 44,350 | ₹26,610 |
| - | PWD Road BSR 3.7
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 305.3.4 as per MoRTH Specification Clause 301.3.11
3.00 x 1500 x 0.10 = 450 cum | 450 | CUM | 31 | ₹13,950 |
| - | PWD Road BSR 3.1
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per MoRTH Specification Clause 305.4.3
1 x 1200 x 3.00 = 3600 sqm | 3,600 | sqm | 11.75 | ₹42,300 |
| - | PWD Road BSR 4.1/ M-149
Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material New Murram Supply and Spreading
3800 x 3.00 x 0.15 = 1710 cum | 1,710 | CUM | 450 | ₹7,69,500 |
| - | PWD Road BSR 3.15 (ii)
Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300-1 and 300-2 for subgrade construction as per MoRTH Specification Clause 305.3.4 Rolling & Compaction
3800 x 3.00 x 0.15 = 1710 cum | 1,710 | CUM | 35 | ₹59,850 |
| - | PWD Road BSR M-115
Manufacturing, supplying and delivering NP3 class RCC Spun Pipes of 600 mm diameter conforming to IS:458 at 8 locations pipe size 3 mtr x 8 nos = 24 mtr | 24 | mtr | 1,759 | ₹42,216 |
| - | PWD Road BSR 1.9(ii)(C)
Unloading of RCC Hume pipe by manual means including a lead upto 30 m& Laying RC spun pipes NP3 class 600/450 mm dia Hume pipe | 8 | Nos | 105 | ₹840 |
| - | PWD Biulding BSR 2022 5.1.1
Brick masonry with F.P.S. bricks of class designation 75 in foundation and plinth with bricks, Cement mortar 1 : 4 (1 cement : 4 coarse sand) Head Wall and Grit Apron Protection works for Hume Pipes (8 Locations):
A) Head Wall (Stone/Brick Masonry) - 2 nos per pipe
= 16 Nos x 1.50 x 0.30 x 0.90 = 6.48 cum | 7.68 | CUM | 4,469 | ₹34,321.92 |
| - | PWD Road BSR 4(4.3)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material
B) Base Grit Compaction - 2 nos per pipe = 16 Nos x 1.50 x 0.50 x 0.10 = 1.20 cum | 1.2 | CUM | 450 | ₹540 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
DOCS1203.pdf
Tender Documents • 3.72 MB
BOQ_1028419.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .