Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.0 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹3.7 L+₹64,245 (21.3%)Rejected-AOC 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | 2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹4,100
Closing Date
26 Jun 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/M.II/TTPS
Superintending Engineer, Mechanical-II, Tuticorin Thermal Power Station, Tuticorin
TTPS MII BM Unit III Patch up works in ducts including supports and fixing of guide vanes splitter in flue gas ducts of B pass C path D path for the year 2023 2024
2023_EB_324471_1
SE/M.II/TTPS/No.173/2023-2024
Open Tender
Miscellaneous Works
Item Rate
25 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹4,100
Yes
15 Nov 2023
8 Jun 2023
27 Jun 2023
8 Jun 2023
26 Jun 2023
8 Jun 2023
Charges for cutting and removal of heavily eroded flue gas duct plates and its supports (Multilayer) from the parent plate, transporting & devoluting scrap to Central Stores/T.T.P.S.
Charges for welding eroded initial welding joints in the flue gas duct below 2 Meter level
Charges for transporting of 6mm M.S.Plate, angles, channels & pipe supports to Boiler area, cutting into required size, leading, lifting, positioning on the eroded top portions of the duct above 1.5 meter level and welding the same
Charges for transporting new deflector plate/ splitter plate and leading to flue gas duct, leading, lifting to Boiler Flue gas ducts. Fixing and welding in the duct
Removal of wear resistance plate for patch up the eroded intricate portion and re fixing the same after completing the patch up
Charges for transportation of required scaffolding materials, clamps, wooden planks, etc. From pocket stores to site, leading, lifting and erection of temporary platform in flue gas duct for replacing of wornout support pipes and M.S plates, expansion joint and dismantling the platform and returning to stores after completion of works.
Charges for cleaning of ash from APH hopper and ESP suction side duct portions for 1 APH hopper and two ESP suction paths.
CKEE ENGINEERING PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .