| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | Rejected-Technical | - | Rejected-Technical agency is technically not qualifed |
| Sl No | Description | Qty | Unit | KVI Systems Private Limited L1 |
|---|---|---|---|---|
| 1.00Please note that Quoted rates are inclusive of ,labor, transportation, royaltie etc. except GST. GST will be paid separtely as per prevailing rates. Nothing Extra shall be paid separtely. | ||||
| 2.00 | Supply, installation, testing and commissioning of finned tubular heaters designed with extended surface areas (Fins).
1. The system shall comprise of following
a. Duct heaters with a minimum capacity of 1.5 KW X 6 nos = 9 KW, installed inside a rectangular heater box suitable for mounting within the supply air duct. Supply air duct size is (600 x 1200 mm). b. Thermal cut offs (high limit temperature sensors) c. Airflow sensor d. RH sensor e. Required power and control cabling.
f. Thyristor control (SCR/ PID controller system for maintaining 40% +/- 5 % RH inside the lab area in all season.
2. The system shall be operated as below
a. The heater’s control circuit shall be operated as per position of AHU fan (ON/OFF), ensuring the heater operates only when adequate airflow is present, preventing overheating in the event of fan failure or blocked airflow.
b. Provided to maintain the required temperature and relative humidity (40% +/- 5 % RH) in the confined area. c. The system shall be cut off in case of overheating.
3. The following are included in the scope of work
a. Cutting of the existing GI duct, installing the duct-heater box into the supply air duct line, closing of GI duct with GI sheet and insulation, cabling work from heater box in duct to control panel, power and control circuit all wiring, electrical components etc.
b. Cubical type LT panel suitable for 415V, 3 phase, 4 wire 50 Hz AC supply system. Panel shall be fabricated in compartment form from CRCA sheet steel of 2mm thick for frame work & covers, 3mm thick for gland plates including cleaning & finishing complete with tank process. Minimum powder coating thickness of 80 micrometers in approved shade. Bottom cable entry. The panel shall be as per IS 8623 specifications & having valid CPRI Test Certification minimum 200 A, 50KA for 1 sec. Panel consists of following items/components which is included in scope of agency.
a. Incomers: RCBO Four pole 63 A, 300 mA, Din mounted. Quantity 01 no b. Control MCB: SP MCB 6 A, C class. Quantity 01 No c. Indication : LED Indication lamp for R Y B & Heater On condition. d. Multifunctional meter : 96 x96 mm size, Panel door mounting, Parameters – AC volt, AC current 3 phase, KWH, KW. 3 phase 4 wire system.
e. PVC channels for cable / wire dressing. f. Louvers for ventilation. g. Outdoor type design. h. Resin cast Current transformer : 3 nos. 75 / 5, 15 VA, CL:1 CT’s for metering 1 set. i. Humidity controller : Panel door mounted with display showing set and current RH values. Controller includes sensor, instrument cabling from sensor up to outdoor Panel. Humidity controller accuracy of +/- 5%. j. SCR controller for resistive heating load compliances with duct heaters. SCR should work on signal from Humidity controller through PID. Please refer annexure -1 for more details. | 11 | Nos. | 1,58,000 ₹17,38,000 Lowest |
Tender Value
₹17.5 L
EMD Value
₹35,000
Closing Date
16 Feb 2026, 6:00 pmClosed
Director IISER Pune
IISER Pune Dr Homi bhabha Road Pashan pune 411008
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF THYRISTOR CONTROLLER SYSTEM (SCR) FOR HUMIDITY CONTROL AT H CROSS LABS AT IISER PUNE.
2026_IISRP_896832_1
24/IISER/Pune/2025-26
Open Tender
Electrical Works
Works
90 days
IISER Pune
As per NIT
3 documents required · 3 mandatory
₹1,180
Director IISER Pune
₹35,000
26 Feb 2026
3 Feb 2026
17 Feb 2026
3 Feb 2026
16 Feb 2026
3 Feb 2026
Please note that Quoted rates are inclusive of ,labor, transportation, royaltie etc. except GST. GST will be paid separtely as per prevailing rates. Nothing Extra shall be paid separtely.
Supply, installation, testing and commissioning of finned tubular heaters designed with extended surface areas (Fins). 1. The system shall comprise of following a. Duct heaters with a minimum capacity of 1.5 KW X 6 nos = 9 KW, installed inside a rectangular heater box suitable for mounting within the supply air duct. Supply air duct size is (600 x 1200 mm). b. Thermal cut offs (high limit temperature sensors) c. Airflow sensor d. RH sensor e. Required power and control cabling. f. Thyristor control (SCR/ PID controller system for maintaining 40% +/- 5 % RH inside the lab area in all season. 2. The system shall be operated as below a. The heater’s control circuit shall be operated as per position of AHU fan (ON/OFF), ensuring the heater operates only when adequate airflow is present, preventing overheating in the event of fan failure or blocked airflow. b. Provided to maintain the required temperature and relative humidity (40% +/- 5 % RH) in the confined area. c. The system shall be cut off in case of overheating. 3. The following are included in the scope of work a. Cutting of the existing GI duct, installing the duct-heater box into the supply air duct line, closing of GI duct with GI sheet and insulation, cabling work from heater box in duct to control panel, power and control circuit all wiring, electrical components etc. b. Cubical type LT panel suitable for 415V, 3 phase, 4 wire 50 Hz AC supply system. Panel shall be fabricated in compartment form from CRCA sheet steel of 2mm thick for frame work & covers, 3mm thick for gland plates including cleaning & finishing complete with tank process. Minimum powder coating thickness of 80 micrometers in approved shade. Bottom cable entry. The panel shall be as per IS 8623 specifications & having valid CPRI Test Certification minimum 200 A, 50KA for 1 sec. Panel consists of following items/components which is included in scope of agency. a. Incomers: RCBO Four pole 63 A, 300 mA, Din mounted. Quantity 01 no b. Control MCB: SP MCB 6 A, C class. Quantity 01 No c. Indication : LED Indication lamp for R Y B & Heater On condition. d. Multifunctional meter : 96 x96 mm size, Panel door mounting, Parameters – AC volt, AC current 3 phase, KWH, KW. 3 phase 4 wire system. e. PVC channels for cable / wire dressing. f. Louvers for ventilation. g. Outdoor type design. h. Resin cast Current transformer : 3 nos. 75 / 5, 15 VA, CL:1 CT’s for metering 1 set. i. Humidity controller : Panel door mounted with display showing set and current RH values. Controller includes sensor, instrument cabling from sensor up to outdoor Panel. Humidity controller accuracy of +/- 5%. j. SCR controller for resistive heating load compliances with duct heaters. SCR should work on signal from Humidity controller through PID. Please refer annexure -1 for more details.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.24 MB
Tenderdoc.pdf
Tender Documents • 22.46 MB
BOQ_942664.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .