Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAdmitted-Finance | ₹2.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.1 CrAdmitted-Finance | ₹4.1 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Found Non-Responsive as per SBD |
| 4 | Rejected-Technical | - | - | Rejected-Technical Found Non-Responsive as per SBD |
| 5 | Rejected-Technical CHALIHA NAGAR DIST TINSUKIA ASSAM | TINSUKIA | ASSAM | - | - | Rejected-Technical Found Non-Responsive as per SBD |
| Sl No | Description | Qty | Unit | M/S O.P. TRADERS L1 | M/s Asum Engineering L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.). II) Ordinary rock (not requiring blasting)
B Mechanical Means. (i) Depth upto 3 m ( without de-watering) | 91.06 | Cum | 187.5 ₹17,073.94 | 104.31 ₹9,498.76 Lowest |
| 2.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.). (IV) Hard rock ( blasting prohibited ). Mechanical Means ( without de-watering) | 623.6 | Cum | 79.5 ₹49,576.04 Lowest | 564.7 ₹3,52,145.17 |
| 3.00 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) | 19.56 | Cum | 6,100.5 ₹1,19,301.38 Lowest | 9,549.68 ₹1,86,753.56 |
| 4.00 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications
H) RCC Grade M30
Case-II Using Batching Plant, Transit Mixer and Concrete Pump | 197.39 | Cum | 7,866.75 ₹15,52,833.52 Lowest | 9,017.11 ₹17,79,905.57 |
| 5.00 | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications | 6 | Tonne | 90,027.36 ₹5,40,164.16 Lowest | 1,02,848.33 ₹6,17,089.97 |
| 6.00 | Providing and inserting dowels bars of 25 mm dia (TMT) to a depth of 500 mm anchored in the hard rock by grouting with cement slurry, as per specification and making good all complete as directed. | 134 | Each | 6,375 ₹8,54,250 Lowest | 13,121.31 ₹17,58,254.87 |
| 7.00 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
H) RCC Grade M30, (p) Height 5m - 10m
Case II) With Batching Plant, Transit Mixer and Concrete Pump | 252.04 | Cum | 8,387.25 ₹21,13,905.72 Lowest | 10,914.56 ₹27,50,883.87 |
| 8.00 | Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications | 24.98 | Tonne | 90,242.25 ₹22,54,070.92 Lowest | 1,02,633.69 ₹25,63,584.21 |
| 9.00 | Supplying, fitting and fixing in position true to line and level cast steel rocker bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. | 786 | Tonne | 1,673.25 ₹13,15,174.5 Lowest | 2,152.14 ₹16,91,584.4 |
| 10.00 | Supplying, fitting and fixing in position true to line and level forged steel roller bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. | 786 | Tonne | 1,473 ₹11,57,778 Lowest | 1,905.64 ₹14,97,833.83 |
Tender Value
₹4.6 Cr
EMD Value
₹9.3 L
Closing Date
12 Jun 2026, 4:00 pmClosed
EE/PIU, RWD YINGKIONG
Office of the Executive Engineer Rural Works Division, Yingkiong, Upper Siang District, Arunachal Pradesh
Construction of BUG Bridge No 8/1 at Chainage 7.50 Km is of 1X30 m on Ningging Village To Tenggo (Bop) over Hibung River.
2026_CEAR_147971_1
AR13041336461C
Open Tender
Civil - Roads and Bridges
Item Rate
365 days
7.50 Km on Ningging Vill to Tenggo Over Hibung Rvr
As per SBD
10 documents required · 10 mandatory
₹15,000
ARRDA, Itanagar
₹9.3 L
Yingkiong
17 Jul 2026
27 May 2026
15 Jun 2026
27 May 2026
12 Jun 2026
27 May 2026
27 May 2026 - 12 Jun 2026
1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.). II) Ordinary rock (not requiring blasting)
B Mechanical Means. (i) Depth upto 3 m ( without de-watering) | 0.4 | Cum | 100 | ₹40 |
| 2 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.). (IV) Hard rock ( blasting prohibited ). Mechanical Means ( without de-watering) | 0.2 | Cum | 100 | ₹19.9 |
| 3 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) | - | Cum | 100 | - |
| 4 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications
H) RCC Grade M30
Case-II Using Batching Plant, Transit Mixer and Concrete Pump | 0.8 | Cum | 100 | ₹79.9 |
| 5 | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications | - | Tonne | 100 | - |
| 6 | Providing and inserting dowels bars of 25 mm dia (TMT) to a depth of 500 mm anchored in the hard rock by grouting with cement slurry, as per specification and making good all complete as directed. | - | Each | 100 | - |
| 7 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
H) RCC Grade M30, (p) Height 5m - 10m
Case II) With Batching Plant, Transit Mixer and Concrete Pump | 0.2 | Cum | 100 | ₹20 |
| 8 | Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications | - | Tonne | 100 | - |
| 9 | Supplying, fitting and fixing in position true to line and level cast steel rocker bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. | - | Tonne | 100 | - |
| 10 | Supplying, fitting and fixing in position true to line and level forged steel roller bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. | - | Tonne | 100 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 0.44 MB
Tendernotice_3.pdf
PDF • 0.58 MB
SBD.pdf
Tender Documents • 2.07 MB
BOQ_230903.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].