Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Finance FATORDA MARGAO GOA | SOUTH GOA | GOA | 403103 | -5.10% | ₹3.8 L | L1 | Admitted-Finance |
| 2 | L2₹3.9 L+₹11,778.08 (3.11%)Admitted-Finance | -2.15% | ₹3.9 L+₹11,778.08 (3.11%) | L2 | Admitted-Finance |
Tender Value
₹4.0 L
EMD Value
₹7,985
Closing Date
10 Aug 2026, 3:00 pmClosed
Executive Engineer
Office of Executive Engineer Works Division XXVII (Sew) St-Inez Panaji-Goa.
Maintenance of Sewage network in Panaji Constituency - Shifting of sewer line at Uday Chari House
2026_PWD_30481_1
DDW/WDXXVII/ASW/01/26-27/Ln1
Open Tender
Civil Works - Others
Percentage
7 days
Panaji
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,000
₹7,985
20 Aug 2026
30 Jul 2026
11 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supplying, of HDPE pipes at store or site of work including loading, unloading, stacking, transit insurance etc. complete bearing ISI mark &conforming to IS: 4984-1995 & made from PE 100 resin Class IV (6 kg/cm2). | |||||
| 1.01 | 200mm | 54 | RM | 1,240 | ₹66,960 |
| 2Supplying, of fabricated /moulded HDPE pipe fittings/specials as per required Pressure class of HDPE Pipes, conforming to IS:8360 (Part I & III) and IS:8008(Part I to IX). The HDPE pipe fittings/specials shall be manufactured from virgin resin PE100 . | |||||
| 2.01 | 200mm | 2 | each | 3,587 | ₹7,174 |
| 3Earthwork in excavation by mechanical means (hydraulic excavator) in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sq. m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. | |||||
| 3.01 | All kind of soil | 55.54 | m3 | 291 | ₹16,162.14 |
| 4 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 3.95 | m3 | 2,211 | ₹8,733.45 |
| 5Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: | |||||
| 5.01 | PCC for Sewer line | 15.12 | m3 | 6,810 | ₹1,02,967.2 |
| 6Centering and shuttering including struttings, propping etc. and removal of formwork for | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.22 MB
Tendernotice_3.pdf
PDF • 0.02 MB
BOQ_31156.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .